You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Robust, Field-Ready, Inline Tool for the Accurate Measurement of Pipe Bending Stresses and Crack Detection

    SBC: CREARE LLC            Topic: 20PH1

    Throughout the United States massive fuel transport pipeline networks‒thousands of kilometers long‒ inevitably cross seismically active areas while potentially experiencing severe working environments, varied geoenvironmental conditions, and significant deformations during their service life. To minimize the risk of failure, pipelines are closely monitored utilizing in-line inspection (ILI) to ...

    SBIR Phase I 2020 Department of Transportation
  2. Low Cost Ocean Temperature Profile Sensing

    SBC: CREARE LLC            Topic: 9202

    Changes in ocean temperature have a profound impact on the productivity of fisheries and aquaculture. Sampling offshore ocean temperatures, particularly at depth, is challenging and expensive. As commercial fishermen are becoming more and more aware of the correlations between water temperature and harvest, opportunistic sampling from fishing gear can help fill this sampling need. Existing opportu ...

    SBIR Phase I 2020 Department of CommerceNational Oceanic and Atmospheric Administration
  3. Small Integrated HFI Sensor for the AVR-2B

    SBC: SOLID STATE SCIENTIFIC CORPORATION            Topic: SOCOM11001

    "SSSC is pleased to propose the development and delivery of a Hostile Fire Indication Sensor (HFIS) based on the Phase I design concept. The resulting system will limit the number of circuit card assemblies to two: one for the short wave infrared (SWIR)

    SBIR Phase II 2012 Department of DefenseSpecial Operations Command
  4. ICING MONITORING EQUIPMENT

    SBC: JONAS, INC.            Topic: N/A

    A SIX MONTH PROGRAM TO DEVELOP A RUGGED NEW DEVICE FOR MONITORING THE ONSET OF ICE FORMATION ON SURFACES OF TRANSPORTATION VEHICLES, ROADS, BRIDGES AND AIRCRAFTS, WILL BE DEVELOPED AND A PROTOTYPE WILL BE LABORATORY TESTED. THE NOVEL GAGE AND ELECTRONIC SYSTEM IS PARTLY BASED ON THE TECHNOLOGY APPLIED TO MEASURE CONDUCTIVITY OF SOLUTIONS. BASED ON EXISTING TECHNOLOGY, AND ALREADY TESTED UNDER HIGH ...

    SBIR Phase II 1985 Department of Transportation
US Flag An Official Website of the United States Government