You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Naval Platform Aero-Optic Turbulence and Mitigation Methodology

    SBC: MZA ASSOCIATES CORP            Topic: N13AT001

    MZA partnered with the University of Notre Dame proposes to transition the Navys HEFL Beam Director Subsystem (HBDS) for flight testing on the Airborne Aero-Optics Laboratory Transonic (AAOL-T) aircraft. We will reconfigure the HBDS integrating structure and aft beam control system to fit the cabin constraints of the AAOL-T aircraft with an aft beam control and scoring bench. Operational functiona ...

    STTR Phase II 2016 Department of DefenseNavy
  2. Compact Megavolt Switch Utilizing Novel Switching Mediums

    SBC: ASR Corporation            Topic: N14AT018

    The Navy has a need to control such extreme power specifications that no suitable switches exist. The Navy power specifications require us to develop a novel medium (probably a pressurized gas or liquid) that can be configured to meet the requirements and control the flow of electrical power directly. Our extensive switching expertise has allowed us to develop a series of novel test fixtures and t ...

    STTR Phase II 2016 Department of DefenseNavy
  3. Revolutionary Airlift Innovation

    SBC: LOGISTIC GLIDERS INC.            Topic: ST14B004

    We propose to mature LG-X glider technology by manufacturing full-scaled prototypes and characterizing them in land-based flight-testing by using commercial aircraft to drop the gliders. Validated components such as the landing parachute, folding wing mechanism, and autopilot control system will undergo integrated flight-testing. Logistic Gliders will provide a considerable cost share to support ...

    STTR Phase II 2016 Department of DefenseDefense Advanced Research Projects Agency
  4. Electronic Warfare: EMS Monitor & Broadcast Training Capacity Enhancement

    SBC: Echo Ridge, LLC            Topic: AF14AT28

    ABSTRACT: Echo Ridge proposes to develop and deliver a suite of prototype EW training tools to support realistic warfighter training in the congested and contested RF environments expected in future operational engagements. The tools consist of an opposing force broadcast capability and an Electromagnetic Spectrum (EMS) monitoring capability which supports both electronic sensing (ES) and electron ...

    STTR Phase II 2016 Department of DefenseAir Force
  5. Cybersecurity within Virtualized Environments

    SBC: PROGENY SYSTEMS, LLC            Topic: N98115

    Tactical networks have increasing needs for greater cybersecurity and greater flexibility and resilience. By combining the advances made in the field of virtualization in terms of Type-1 (Bare Metal) Virtualization, and Introspection via the Hypervisor, a

    STTR Phase II 2016 Department of DefenseNavy
  6. Data Driven Intent Recognition Framework

    SBC: OTHER LAB, INC.            Topic: NSF13599

    A critical aspect of exoskeleton control that has to date introduced a performance limitation is the ability of the exoskeleton to recognize the intent of the operator so it can apply assistance to their desired motion. This intent recognition effort is typically solved using ad-hoc methods where subject matter experts make design decisions and tune transitions to identify intended maneuvers as re ...

    STTR Phase II 2016 Department of DefenseSpecial Operations Command
  7. Spectrum Sensing and Sharing by Cognitive Radios in Position, Navigation and Timing (PNT) Systems

    SBC: Echo Ridge, LLC            Topic: AF15AT23

    Echo Ridge proposes to prototype and demonstrate an architecture and key algorithms to support spectrum sharing for Position, Navigation, and Timing (PNT) that focuses on spectrally congested and high likelihood operational scenarios. Four key results are proposed to be delivered: 1) end-to-end Hardware-in-the-Loop (HiTL) lab demonstration of all segments of the solution in Air Force-relevant oper ...

    STTR Phase II 2016 Department of DefenseAir Force
  8. Decision Making under Uncertainty

    SBC: GCAS, Inc.            Topic: MDA13T001

    Our proposed second order uncertainty (SOU) product is a decision making software solution that addresses the problem of providing accurate and precisely defined decision courses of action (COAs) of complex, time-constrained problems in a fraction of the time required by alternative methods striving to achieve the same level of precision. Complex decision situations can deal with large volume of ...

    STTR Phase II 2016 Department of DefenseMissile Defense Agency
  9. Durable Sol-Gel Surface Treatment to Control Cathodic Current Density

    SBC: LUNA INNOVATIONS INCORPORATED            Topic: N14AT014

    There are numerous regions across modern aircraft that necessitate advanced corrosion solutions in order to protect and maintain their readiness. One such application is the numerous cathodic fasteners that are galvanically coupled to anodic structural materials, like high-strength aluminum alloys. There is a need to bolster corrosion protection at these locations via a user-friendly surface treat ...

    STTR Phase II 2016 Department of DefenseNavy
  10. High Gain, High Power PCSS with Integrated Monolithic Optical Trigger

    SBC: Eureka Aerospace            Topic: A14AT004

    This proposal addresses the problem of PCSS/laser trigger integration using a single monolithic laser diode array, thus simplifying the entire optical delivery network necessary for efficient operation of PCSSs. The proposal constitutes a logical continuation of Phase I effort where the main focus was on the detailed design of the PCSS/laser diode array (LDA) integrated architecture. In Phase II ...

    STTR Phase II 2016 Department of DefenseArmy
US Flag An Official Website of the United States Government