You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Tin Whisker Mitigation Technologies for Sn-based Surface Finishes on Electronic Assemblies and Microelectronic Devices

    SBC: Foresite, Inc.            Topic: MDA08T010

    The impact of metal whiskers on the reliability of electronics has been exacerbated by environmentally-driven efforts to eliminate lead from tin plating and solders. Even exempt applications, such as military, are affected due to COTS. Foresite, Inc., a consultant, laboratory and test equipment development company, has a goal for the subject research, in collaboration with Purdue University, to ...

    STTR Phase II 2010 Department of DefenseMissile Defense Agency
  2. Naval Platform Aero-Optic Turbulence and Mitigation Methodology

    SBC: MZA ASSOCIATES CORP            Topic: N13AT001

    MZA partnered with the University of Notre Dame proposes to transition the Navys HEFL Beam Director Subsystem (HBDS) for flight testing on the Airborne Aero-Optics Laboratory Transonic (AAOL-T) aircraft. We will reconfigure the HBDS integrating structure and aft beam control system to fit the cabin constraints of the AAOL-T aircraft with an aft beam control and scoring bench. Operational functiona ...

    STTR Phase II 2016 Department of DefenseNavy
  3. Compact Megavolt Switch Utilizing Novel Switching Mediums

    SBC: ASR Corporation            Topic: N14AT018

    The Navy has a need to control such extreme power specifications that no suitable switches exist. The Navy power specifications require us to develop a novel medium (probably a pressurized gas or liquid) that can be configured to meet the requirements and control the flow of electrical power directly. Our extensive switching expertise has allowed us to develop a series of novel test fixtures and t ...

    STTR Phase II 2016 Department of DefenseNavy
  4. Revolutionary Airlift Innovation

    SBC: LOGISTIC GLIDERS INC.            Topic: ST14B004

    We propose to mature LG-X glider technology by manufacturing full-scaled prototypes and characterizing them in land-based flight-testing by using commercial aircraft to drop the gliders. Validated components such as the landing parachute, folding wing mechanism, and autopilot control system will undergo integrated flight-testing. Logistic Gliders will provide a considerable cost share to support ...

    STTR Phase II 2016 Department of DefenseDefense Advanced Research Projects Agency
  5. Development of Low-Cost Augmented Reality Head Mounted Display

    SBC: SA PHOTONICS, LLC            Topic: N09T031

    SA Photonics, in conjunction with our teammates at the University of Arizona, have developed LARS, the low-cost augmented reality system. This system is a see-through HMD used for training and simulation. LARS was designed using an innovative freeform prism combiner which is small, lightweight and has very little obscuration of the outside world. We have partnered with Rockwell Collins Optronics ( ...

    STTR Phase II 2010 Department of DefenseNavy
  6. Planar, High Frequency, Power Conversion Device Technology

    SBC: TRANSPHORM, INC.            Topic: N09T023

    Transphorm proposes to demonstrate a normally off fast high voltage Gallium Nitride power switch solution. The switch would block to 1200V, have a threshold voltage greater than 5 V, and the phase 2 switch will target an on resistance less than 15 ohm-mm and current more than 1 Amp. To accomplish these targets, Transphorm will combine the design requirements of realizing a high (and positive) thre ...

    STTR Phase II 2010 Department of DefenseNavy
  7. Data Driven Intent Recognition Framework

    SBC: OTHER LAB, INC.            Topic: NSF13599

    A critical aspect of exoskeleton control that has to date introduced a performance limitation is the ability of the exoskeleton to recognize the intent of the operator so it can apply assistance to their desired motion. This intent recognition effort is typically solved using ad-hoc methods where subject matter experts make design decisions and tune transitions to identify intended maneuvers as re ...

    STTR Phase II 2016 Department of DefenseSpecial Operations Command
  8. Electro Optic Avionic Advanced Guidance, Navigation and Control (GNC) Algorithm Development to Enhance the Lethality of Interceptors Against Maneuveri

    SBC: POLARIS SENSOR TECHNOLOGIES INC            Topic: MDA08T003

    This Phase II effort will further develop a technique to improve current seeker discrimination and tracking capabilities using a unique particle filter algorithm (PFA) approach. The advancement represents a significant upgrade to current and future seekers facing advanced threats in stressing environments. Quantifiable improvements over many facets of the current approach have been realized during ...

    STTR Phase II 2010 Department of DefenseMissile Defense Agency
  9. Exact modeling of targets in littoral environments

    SBC: HEAT, LIGHT, AND SOUND RESEARCH, INC.            Topic: N09T026

    The US Navy needs the capability to model acoustic propagation in complex ocean environments containing natural or man-made objects. Such accurate modeling requires the solution of the wave equation in the ocean containing scatterers. In the absence of the scatterer, the oceanic waveguide can be assumed to be axially symmetric. This allows certain types of physically valid approximations to be mad ...

    STTR Phase II 2010 Department of DefenseNavy
  10. Linking Output Activity to Outcomes/Impacts in Complex Contingency Environments

    SBC: Frontier Technology Inc.            Topic: OSD08T003

    As the U.S. Government increases participation in post-conflict Stabilization and Reconstruction Operations (SARO) around the globe, the ability to understand the relationships between task completion and mission completion is critical. The US Government employs a metrics tool developed though the Monitoring Progress in Conflict Environments project. The objective of this Phase II STTR is to provi ...

    STTR Phase II 2010 Department of DefenseArmy
US Flag An Official Website of the United States Government