You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
CyberScenarios for the Transporation, Distribution and Logistics Career Cluster
SBC: Bright Futures Press Interactive Knowledge Topic: N/AN/A
SBIR Phase I 2001 Department of Education -
RESTORATION OF THE COMPETITIVE CAPABILITY AND PROFITABILITY OF RANDOLPH SHEPPARD VENDOR BUSINESSES BY INTRODUCING INNO-VATIVE EQUIPMENT TECHNOLOGIES AND NEW FOODSERVICE MARKETING PROGRAMS AND PRODUCT CONCEPTS.
SBC: General Research And Analysis Topic: N/AFOR 50 YEARS THE RANDOLPH-SHEPPARD VENDING PROGRAM HAS MEANTEMPLOYMENT AND INDEPENDENCE TO THE BLIND. TODAY, HOWEVER, THE PROGRAMS AND ITS VENDOR MEMBERS FACE SEVERE CHANGES IN THE BUSINESS ENVIRONMENT THAT THREATEN THE LONG TERM ECO-NOMIC STABILITY OF MANY INDIVIDUAL OPERATORS AND PERHAPS THEENTIRE PROGRAM. THIS NEW BUSINESS ENVIRONMENT FEATURES IN- TENSIFIED COMPETITION FROM THE PRIVATE SECTOR, ...
SBIR Phase I 1988 Department of Education -
IONIC SURFACES TO BIOLOGICAL CONTROL
SBC: Ionic Atlanta Inc Topic: N/ABACTERIA INDUCE MANY OF THE PROBLEMS ASSOCIATED WITH PUBLIC PROBLEMS ASSOCIATED WITH WATER BORNE PATHOGENS. IN ADDITIONTASTE, ODOR, COLOR AND TURBIDITY PROBLEMS ARE SOMETIMES CAUSED BY BACTERIAL, FOULING AND CORROSION ARE ALSO CAUSED BY BACTERIA. FOULED WATER SYSTEM COMPONENTS PROMOTE DEVELOPMENT OF PROTECTED OR SHIELDED CONSORTIA OF BACTERIA WHICH DECREASES THE EFFGECTIVENESS OF CHLORINE (OR OTHE ...
SBIR Phase I 1988 Environmental Protection Agency -
Positive Solutions: A Web-based Program for Improving Challenging Behaviors
SBC: Positive Behavioral Solutions, Inc. Topic: N/AN/A
SBIR Phase I 2001 Department of Education -
AF TOPIC NUMBER: AF00-120 Circular Trellis Coding for Wavelet Packet Modulation Digital Communications
SBC: SCIENTIFIC RESEARCH CORP. Topic: N/AThe primary goal of the work to be accomplished under this SBIR Phase II effort is the implementation of an efficient and reliable wireless Circular Trellis Coded Wavelet Packet Modulation System (CTCWPMS). The developed prototype CTCWPMS will moreeffectively address a variety of wireless communications challenges that cannot be met using conventional Fourier source and channel coding methods. M ...
SBIR Phase I 2001 Department of DefenseDefense Advanced Research Projects Agency -
Cursor Control Camera Headset with Voice Recognition Capabilities
SBC: SIGMA K CORP Topic: N/AN/A
SBIR Phase I 2001 Department of Education -
Desing of Technologies Other than Standard Metal Detection Devices
SBC: USDigiComm Corporation Topic: N/AN/A
SBIR Phase I 2001 Department of Education