You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Computer Vision Under Strict Security Constraints: Applications for Robotics

    SBC: MONA MARIE CORPORATION            Topic: X224OCSO1

    Proposed is robotic lawn mower developed and commercialized by the proposing company – Hire Henry. The focus of this Phase I proposal is to quantify the potential impact for fully autonomous, fully electric robotic lawn mowing on United States Air Force Bases. This proposal lays the ground work for future work, which focuses on developing computer vision models for robotic mowing specifically f ...

    SBIR Phase I 2023 Department of DefenseAir Force
  2. AiHigh Fidelity, Library Based THz Air Toxic Monitoring System for Neighborhood-Level Surveillance

    SBC: Edvance Research, Inc.            Topic: 2A

    The industrialization and urbanization movements have resulted in air pollutants being commonplace in industrial and residential areas; pollutants are produced by automobiles, manufacturing processes, and home improvement, among other activities. Air toxics pose a significant risk to public health and lower quality of life due to both acute and chronic health impacts. Therefore, there is a need fo ...

    SBIR Phase I 2023 Environmental Protection Agency
  3. Sorbent Traps for Continuous Measurement of Metal HAP Emissions- Phase II

    SBC: OHIO LUMEX CO INC            Topic: 2D

    During this Phase II SBIR research project, Ohio Lumex will complete development of a sorbent trap method for continuous emissions monitoring of metal hazardous air pollutant (HAP) emissions. If method sensitivity is sufficient and the method is approved by EPA, it may also be used as an alternative to Method 29 for short-duration testing. Metal HAP emissions from stationary sources are currently ...

    SBIR Phase II 2023 Environmental Protection Agency
  4. Drawing Intelligence & Rapid Engineering Combined Technologies (DIRECT)

    SBC: CHARACTERISTIC SOLUTIONS COMPANY LLC            Topic: AFX234DCSO2

    Sustainment for Air Force legacy systems is driven by availability of critical spare parts.  Like the legacy systems themselves, these parts have likely been out of production for years, if not decades.  Arguably, it is insufficient technical data that is

    SBIR Phase II 2023 Department of DefenseAir Force
  5. Rucksack Portable Fixed-Wing sUAS Streamlines Logistics and CONOPS

    SBC: WINGXPAND INC.            Topic: AFX234DCSO2

    What if an airplane could fit within a rucksack, deploy in less than two minutes, fly for hours, and automatically detect threats in real time? Now it can with the highly capable and easy to use WingXpand™ small unmanned aerial system (sUAS), enabled by o

    SBIR Phase II 2023 Department of DefenseAir Force
  6. Specialized Physical Readiness thru for Special Operations Units

    SBC: Barbell Logic Inc.            Topic: AFX234DCSO2

      Barbell Logic provides three main services: online personal training solutions for clients that connect professional strength and conditioning coaches to clients worldwide, education and certification for strength and conditioning coaches, and a turnkey

    SBIR Phase II 2023 Department of DefenseAir Force
  7. In-Field Repair of Coatings on Aircraft Systems with Enhanced Adhesion and Corrosion Resistance

    SBC: Faraday Technology, Inc.            Topic: AFX234DCSO2

    A joint effort between Faraday Technology, LumiShield, and ES3 will develop an in-field pretreatment process for enhanced corrosion resistance and paint adhesion on aluminum and steel substrates, to replace chromate conversion coatings and primers current

    SBIR Phase II 2023 Department of DefenseAir Force
  8. XtruJog: Modernization of Joggling of Extruded Aluminum Parts

    SBC: FAIRMOUNT TECHNOLOGIES LLC            Topic: AFX234DCSO2

    In this proposed D2P2 project, we will rapidly develop a second generation XtruJog machine, XJ-2, to be capable of automatically hot joggling parts with the required joggles at the programmed locations. Self-funded proof-of-concept research has shown that

    SBIR Phase II 2023 Department of DefenseAir Force
  9. Space Launch & Operations Common Operating Picture

    SBC: TESSERACT VENTURES LLC            Topic: AFX234DCSO2

    The Tesseract Smart Space Environment is a collaborative workspace designed to create immersive situational awareness and control over highly desperate information streams. This may include incoming feeds from IoT assets, cameras, sensors, enterprise soft

    SBIR Phase II 2023 Department of DefenseAir Force
  10. Client-Oriented Vision-Enhancing Recognition Technology (COVERT)

    SBC: MARTIAN SKY INDUSTRIES, LLC            Topic: AFX234DCSO1

    COVERT is a computer vision software solution that processes 3D point clouds and 2D camera images to increase environmental awareness during data acquisition missions. The system implements an Iterative Closest Point (ICP) algorithm and instantaneous velo

    SBIR Phase II 2023 Department of DefenseAir Force
US Flag An Official Website of the United States Government