You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Navigation System for Early Childhood Assessment and Instruction

    SBC: Cognitive ToyBox, Inc.            Topic: 91990020R0007

    This project will fully develop an early childhood holistic assessment platform that combines observation and direct (game-based) tools to assess the school readiness of individual children. This approach will reduce the assessment burden for teachers and provide usable data to improve instruction in real-time. The games are intended for low-stakes assessment – children interact with the adaptiv ...

    SBIR Phase II 2020 Department of EducationInstitute of Education Sciences
  2. Powerskills Game Lab: Improving High School Communication Skills Through Formative Assessment

    SBC: Hats & Ladders, Inc.            Topic: 91990020R0007

    The project team will develop Powerskills Game Lab, a game-based intervention for high school students to develop career readiness abilities in communication and adjacent intrapersonal and interpersonal domains. The intervention will include modules on different career readiness topics (clear and effective communication, personal and social awareness, work ethic and professionalism) and will addre ...

    SBIR Phase II 2020 Department of EducationInstitute of Education Sciences
  3. Integration and Preparation of McNab Products

    SBC: CEPEDA ASSOCIATES, INC.            Topic: DLA183004

    This project will result in the creation of multiple Technical Data Packages (TDP) and Source Approval Requests (SAR) as well as supporting CEPEDA’s acquisition of all of McNab’s Navy products.  Successful completion will qualify CEPEDA Associates as an approved vendor for these items that have been orphaned as a result of McNab's dissolution.  CEPEDA is a qualified Navy vendor for critical ...

    SBIR Phase II 2020 Department of DefenseDefense Logistics Agency
  4. Teachley Problem-Solving Assessment: Supporting teachers to assess and promote students mathematical thinking

    SBC: TEACHLEY, LLC            Topic: 91990020R0006

    The project will develop a prototype of a formative assessment dashboard for teachers to view, monitor, and gain insight from students' digital work in mathematics to inform instruction. In Phase I, the team will develop a prototype of the formative assessment tool to support teachers' pedagogical approaches, identify areas for personalized intervention, and plan math discussions that address stud ...

    SBIR Phase I 2020 Department of EducationInstitute of Education Sciences
  5. Teachley Math Practice Kits: Transmedia resources to support students’metacognitive math reasoning

    SBC: TEACHLEY, LLC            Topic: 91990020R0006

    This project will develop transmedia kits including videos, games, creation tools, character cards, and comic books to engage and support Kindergarten to grade five students in learning strategies to understand abstract mathematical topics, such as such as on misconceptions related to place value and multi-digit operations. The kits will be a supplemental resource for elementary teachers looking t ...

    SBIR Phase I 2020 Department of EducationInstitute of Education Sciences
  6. TeleSculptor Multiplex: Fusing Multiple FMV Feeds in 3D

    SBC: KITWARE INC            Topic: SOCOM201003

    Multiple concurrent FMV feeds can provide useful context during special forces missions but the flood of data from disconnected viewpoints can dramatically increase cognitive load on SOF operators. Substantial network bandwidth is also consumed by streaming multiple concurrent video feeds with highly redundant content. Kitware proposes TeleSculptor Multiplex, an approach to combine multiple FMV fe ...

    SBIR Phase I 2020 Department of DefenseSpecial Operations Command
  7. Grave to Cradle: Establishing a Domestic Capability to Recover, Reclaim, and Convert Critical Metals from Defense & Industrial Scrap

    SBC: 6K INC.            Topic: DLA183013

    There is limited domestic production of nickel superalloys, used in propulsion, turbines, heat exchangers, exposing the military to risk of overdependence on foreign sources. End-of-life parts and shop scrap represent an untapped source of superalloys that can serve as a domestic supply, provided they can be converted into material with properties meeting specs for original parts manufacturing. Th ...

    SBIR Phase II 2020 Department of DefenseDefense Logistics Agency
  8. Engaging the Manufacturing Industrial Base in Support of the DLA Nuclear Enterprise and Other Critical Supply Chain

    SBC: AMG ENGINEERING AND MACHINING, INC.            Topic: DLA193001

    Part Number: 525133-1 Utilizing 5-axis mill and dovetail fixturing, mill housing (item 1). On vertical mill create installation tool (525134). Working with specialty glass house, develop 525132 (quartz window) holding flatness of 3 wavelengths per inch and parallel to 3 archmin. Develop application (with same specialty glass house) of ¼ wave magnesium fluoride applied to both surface B and opposi ...

    SBIR Phase I 2020 Department of DefenseDefense Logistics Agency
  9. Interference Rejection of Strong Signals Within Wideband Communication Receivers

    SBC: METAMAGNETICS INC            Topic: SOCOM183002

    Metamagnetics proposes to develop prototype bolt-on Auto-tune Filter (AtF) modules that reject strong signals at two tactically-relevant frequency bands.

    SBIR Phase II 2020 Department of DefenseSpecial Operations Command
  10. In Situ Remediation Technology (InSRT) for Remediation of PFAS Contaminated Groundwater

    SBC: REMWELL LLC            Topic: 19NCER1C

    Per- and Polyfluoroalkyl substances (PFAS) are persistent chemicals that have been introduced to the environment through manufacturing, use, and disposal of products containing PFAS. Some PFAS have been phased out of production; however, their legacy persists through widespread contamination of air, water, soil, and biota. The U.S. EPA has issued a lifetime drinking water Health Advisory Level (HA ...

    SBIR Phase I 2020 Environmental Protection Agency
US Flag An Official Website of the United States Government