You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY21 is not expected to be complete until September, 2022.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. Keck‐PAD Fast‐Framing Hybrid X‐ray Pixel Array Detector

    SBC: Sydor Instruments, LLC            Topic: 04a

    The capabilities of modern x-ray light sources have opened up new areas of research in the study of in- situ fast irreversible processes. Irreversible processes or “single shot” experiments are challenging since they require detectors that can obtain a succession of x-ray images within the time frame of the process in question. This requires high sensitivity, wide dynamic range x-ray detection ...

    STTR Phase II 2016 Department of Energy
  2. A Hybrid HTS/LTS Superconductor Design For High-Field Accelerator Magnets

    SBC: PARTICLE BEAM LASERS, INC            Topic: 33b

    Proposed designs for a Future Circular Collider (FCC) to collide protons with a center-of-mass energy of 100 TeV call for dipoles with fields up to 20 Tesla (T). This is significantly beyond the present technology and requires using High Temperature Superconductors (HTS). The recent Particle Physics Project Prioritization Panel (P5), organized by the U.S. Department of Energy (DOE), strongly supp ...

    STTR Phase II 2015 Department of Energy
  3. Automated Simulation Of Selective Laser Melting Additive Manufacturing For Process Design

    SBC: SIMMETRIX INC.            Topic: 02a

    Additive Manufacturing (AM), where three-dimensional (3D) objects are created from a digital model by depositing and fusing successive layers of material, provides the ability to produce low-volume, customized products with complex geometries relatively quickly at a moderate cost. However, AM processes sometimes fail to produce acceptable parts, due to either geometric in- accuracy (e.g., shrinkag ...

    STTR Phase II 2015 Department of Energy
US Flag An Official Website of the United States Government