You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Task Accomplishing Systems from Composable Kits (TASCK)

    SBC: METAMORPH INC            Topic: SB163013

    Robotics hardware has made significant advances in flexibility, power, and precision, as evidenced by their increasing use in novel ways in military and commercial applications. Yet, software and system integration for robotics has lagged behind these h...

    SBIR Phase II 2017 Department of DefenseDefense Advanced Research Projects Agency
  2. BHL Cryotank Validation and Enhancement

    SBC: GLOYER-TAYLOR LABORATORIES INC            Topic: SB091013

    In a previous effort, GTL successfully demonstrated that the BHL cryotank technology provides a 75% mass reduction compared to the state of the art cryotanks. This capability would double the payload a liquid propellant launch vehicle just from the mass...

    SBIR Phase II 2017 Department of DefenseDefense Advanced Research Projects Agency
  3. Flight Tested Integrated Guidance Electronics Package

    SBC: DYNAMIC STRUCTURES AND MATERIALS, LLC            Topic: SB163014

    While guided munitions have been used with great success, the technology for these weapons is still rapidly advancing and more nations are gaining access to them. In order to fulfill its mission to assure that the US is the beneficiary of technical surp...

    SBIR Phase II 2017 Department of DefenseDefense Advanced Research Projects Agency
  4. Compact, Configurable, Real-Time Infrared Hyperspectral Imaging System

    SBC: SPECTRUM PHOTONICS INC            Topic: SB152006

    Technical Abstract (Limit to 200 words with no classified or proprietary information).The proposed Phase II project focuses on the development and demonstration of a re-configurable, real-time portable infrared hyperspectral imaging (HSI) system. The envisioned sensor will provide users with significantly enhanced, multi-mission oriented capabilities.The goal of the project is to enable the detect ...

    SBIR Phase II 2016 Department of DefenseDefense Advanced Research Projects Agency
  5. Sensor Fusion for Contaminant Detection and Removal from Plastic Recycle Streams

    SBC: National Recovery Technologies LLC            Topic: N/A

    Post-consumer plastics have become a tremendous burden upon our waste disposal system. Although plastics constitute only about 9 percent by weight of municipal solid waste, they occupy approximately one-fourth the volume of the waste stream. The U.S. EPA recommends recycling of plastics as the best solution to the problem. However, contamination of plastics within the recycle stream by foreign mat ...

    SBIR Phase II 2001 Environmental Protection Agency
  6. Introducing Mathematics to At-Risk Students through a 3D Role Playing Game

    SBC: PHYSITRON, INC.            Topic: N/A

    N/A

    SBIR Phase II 2001 Department of Education
US Flag An Official Website of the United States Government