You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Signal State Transition Software Development

    SBC: Advanced Technologies, Inc            Topic: 06FH1

    ATI's Phase II effort will consist of developing an open source Signal Control Program Environment (SCOPE). This SCOPE will incorporate either an open source traffic signal control program or a more refined version of the signal control logic ATI developed in our Phase I effort. ATI will develop SCOPE so that the Cooperative Intersection Collision Avoidance System (CICAS) and Adaptive Control Sys ...

    SBIR Phase II 2011 Department of Transportation
  2. Demonstration of a Low-Cost Vehicle Monitoring System for Tractor Trailers

    SBC: MAINSTREAM ENGINEERING CORP            Topic: 112FM1

    Mainstream has been developing a unique wireless Vehicle Monitoring System (VMS). As discussed in this proposal, prior internally funded efforts have already demonstrated key elements of this decentralized, low-cost, and easy-to-install system. This proposal also contains the results of extensive market research to verify the market demand and identify desirable features. Mainstream's previous ...

    SBIR Phase I 2011 Department of Transportation
  3. Evaluation of the 100% Recyclability of Superpave Hot Mix Asphalt

    SBC: HIP Paving, LLC            Topic: A

    "At 2.7 million miles of paved roads, the United States has the largest network of roads in the world. The mainstream approach to pavement rehabilitation has been to mill the deteriorated asphalt and replace with new asphalt mix. The hot in-place pavement recycling process has the potential of replacing the milling and resurfacing process with substantial financial and environmental savings. Ho ...

    SBIR Phase I 2011 Environmental Protection Agency
  4. Mobile Signing Math Dictionaries with Mouth Morphemes for Deaf and Hard of Hearing Students

    SBC: VCOM3D INC            Topic: 84133S1

    Building on previous collaborations, Vcom3D and TERC develop and evaluate a Mobile Signing Math Pictionary (MSMP) that provides American Sign Language and Signed English definitions with human voice narration/lip-sync technology for Apple’s iPod Touch/iPad. Deaf and hard of hearing students lag behind their hearing counterparts not only in literacy subjects, but also in science, technology, engi ...

    SBIR Phase I 2011 Department of Education
  5. Mobile Communication App for Deaf and Hard of Hearing

    SBC: VCOM3D INC            Topic: 84133S1

    This product develops and evaluates a proof-of-concept, mobile speech-to-sign translator that integrates continuous speech recognition software with natural language processing and Vcom3D’s Signing Avatar animated American Sign Language technology. This speech-to-sign the application is designed to run on iPhone/iPod or Android smartphones, providing Deaf and hard of hearing (D/HH) learners the ...

    SBIR Phase I 2011 Department of Education
  6. Quantum Dot/Aptamer Real-Time Flow Sensor

    SBC: Smart Polymers Research Corporation            Topic: N/A

    The Phase II project will be dedicated to the design, creation and full-scale testing of a functional multi­-specific sensor prototype for real-time environmental water monitoring. The sensor will be miniature, portable, robust, easy-to-use and completely field-deployable. The utilized competitive displacement detection scheme guarantees high specificity as was shown in Phase I, while bright fluo ...

    SBIR Phase II 2011 Environmental Protection Agency
  7. SIMPLIFYING AND IMPROVING THE CREATION OF SOFTWARE

    SBC: Iddea Inc.            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of Education
US Flag An Official Website of the United States Government