You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. SCRIPT: Safety Critical, Real-time, Intelligent Passenger Transport App for Smartphones via Always-on Global Internet Connection

    SBC: INFOBEYOND TECHNOLOGY LLC            Topic: 171FR4

    SCRIPT: Safety Critical, Real-time, Intelligent Passenger Transport App for Smartphones via Always-on Global Internet Connection 12/21/2016 Providing railroad passenger information via smartphones improves the passengers’ traveling experience with added value on train safety and security enhancement. In this project, InfoBeyond advocates the development of Safety Critical, Real‐time, Intell ...

    SBIR Phase I 2017 Department of Transportation
  2. Determining Students' Academic Engagement while Completing Learning Activities and Assessments

    SBC: Tutorgen, Inc.            Topic: edIES15R0005

    With this Phase I funding, the project team will develop and test a prototype of D-TECH, a system to determine students' level of academic engagement while completing computer-based learning activities and assessments. The prototype will integrate within existing third party computer-based programs (e.g., online courseware, educational games, simulations, intelligent tutors) and will consist of a ...

    SBIR Phase I 2017 Department of EducationInstitute of Education Sciences
  3. In-Situ Applied Omniphobic Coatings for Water Pipeline Repair and Retrofitting

    SBC: OCEANIT LABORATORIES INC            Topic: 16NCER4B

    Many pipelines within America’s infrastructure are in dire need of repair, due to structural damage caused by corrosion, or the threat of heavy metal leaching from lead and copper pipes. However, full pipe replacement is expensive and disruptive, while existing polymer liners and sleeve inserts can only_x000D_ be applied in specific cases and have difficulty bonding to worn and contaminated surf ...

    SBIR Phase I 2017 Environmental Protection Agency
  4. Multimedia Literacy Software for Deaf, Hard of Hearing, and Visual Learners

    SBC: VCOM3D INC            Topic: N/A

    Development of a fully functional Multimedia Literacy Software (MLSW) progam to address the needs of deaf/hard of hearing and other students and identify best uses of the MLSW in instruction of reading skills

    SBIR Phase II 2005 Department of Education
US Flag An Official Website of the United States Government