You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Integrated Cookstove-Heating-Electricity Generation for Small homes- Integrated cooking, heating, and electric power generation

    SBC: ASAT, INC.            Topic: 15NCER02

    _x000D_Currently available biomass heating/cooking stoves in Asia and in the USA do not efficiently cook food or heat houses while consuming too much fuel and emitting pollution, resulting in respiratory illnesses and premature death. ASAT specializes in the development and manufacturing of clean burning biomass stoves. In SBIR Phase I, ASAT developed a low emission, fuel efficient Integrated Heat ...

    SBIR Phase II 2017 Environmental Protection Agency
  2. Determining Students' Academic Engagement while Completing Learning Activities and Assessments

    SBC: Tutorgen, Inc.            Topic: edIES15R0005

    With this Phase I funding, the project team will develop and test a prototype of D-TECH, a system to determine students' level of academic engagement while completing computer-based learning activities and assessments. The prototype will integrate within existing third party computer-based programs (e.g., online courseware, educational games, simulations, intelligent tutors) and will consist of a ...

    SBIR Phase I 2017 Department of EducationInstitute of Education Sciences
  3. Design Environment for Educator-Student Collaboration Allowing Real-Time Engineering-centric, STEM (DESCARTES) Exploration in Middle Grades

    SBC: PARAMETRIC STUDIO, INC.            Topic: none

    DESCARTES is a game-based engineering environment where students design, test, and build projects, including boats, airplanes, and other models. The web-based student-facing environment will include challenges, topic introductions, tutorials, and tools for analyzing and improving projects. Following completion of a concept in the environment, students will then build and test real world prototypes ...

    SBIR Phase II 2017 Department of EducationInstitute of Education Sciences
  4. Balloon Platforms for Remote Sensing of Water Quality in Mixing Zones

    SBC: PHYSICAL SCIENCES INC.            Topic: 05NCERD4

    MixZon, Inc., hypothesizes that lightweight infrared (IR) and video cameras mounted on an unmanned tethered helium balloon accessible via a wireless network can remotely sense water quality at site scales. MixZon will demonstrate the technical feasibility of a ground-based network to monitor and control balloon-mounted, IP-enabled wireless IR and video cameras for measurement of the spatial distri ...

    SBIR Phase I 2006 Environmental Protection Agency
  5. An Integrated Ecoroof Energy Analysis Model

    SBC: Quantec, L.L.C.            Topic: 05NCERD5

    Vegetated roofs (ecoroofs) offer diverse benefits, including energy savings and stormwater runoff reductions. Installation of ecoroofs in both new and existing buildings has expanded significantly during the past 5 years, with several local jurisdictions providing incentives for their installation and the Leadership in Energy and Environmental Design green building rating system offering multiple ...

    SBIR Phase I 2006 Environmental Protection Agency
  6. SS-SCAN!- SINGLE SWITCH CONTROL ACCESS FOR DOS AND WINDOWS SOFTWARE

    SBC: ACADEMIC SOFTWARE, INC.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Education
  7. NOVEL CATALYSTS FOR THE OXIDATION OF NO TO NO2

    SBC: Accel Catalysis Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Environmental Protection Agency
  8. Powered Mounting and Positioning System

    SBC: BLUE SKY DESIGNS INC            Topic: N/A

    In Phase II, a powered mounting and positioning system is developed and provides independent access to communication devices, work surfaces, books, cell phones, PDAs, food, drinks, and more for individuals with significant limitations. Device positioning is controlled through switches, voice, or joystick control. Programming is accomplished with a single switch. A person may move the mount to o ...

    SBIR Phase II 2006 Department of Education
  9. POLLUTION PREVENTION PUMP

    SBC: Dame Engineering Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Environmental Protection Agency
  10. PROPOSAL TO DEVELOP THE SKILLS INTELLIGENT LEARNING SYSTEM(SKILS)

    SBC: Isys Corp.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Education
US Flag An Official Website of the United States Government