You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ACCESSIBLE WEB AUTOMATION FOR PEOPLE WITH VISION IMPAIRMENTS

    SBC: CHARMTECH LABS LLC            Topic: 84133S2

    This project builds upon previous research to develop and deploy the Assistant, an enabling technology for accessible web automation for people with visual disabilities. Web automation, as embodied in the Assistant, automates many of the repetitive low-level actions such as form filling and activating controls (such as clicking on buttons and links) that one has to do in typical browsing tasks suc ...

    SBIR Phase II 2012 Department of Education
  2. Advanced Transmitter for Chem-Bio Standoff Detection

    SBC: DBC Technology Corp.            Topic: CBD11106

    As a natural extension of the Phase I results, novel laser LWIR transmitters will be developed, demonstrated, and delivered to support development of next generation point and local area proximal standoff sensors based on newly demonstrated phenomenologies to simultaneously detect biological particles, chemical vapors, and chemical aerosols with a single device. The transmitters will feature rapid ...

    SBIR Phase II 2012 Department of DefenseOffice for Chemical and Biological Defense
  3. A Game-Based Intervention to Promote Executive Function and Reasoning in Early Learning

    SBC: KIKO LABS INC.            Topic: EDIES15R0008

    Video Demonstration of the Phase I Prototype: http://youtu.be/P74Z5oNAo4c Purpose: This project will develop and test Kiko's Thinking Time, a series of game apps designed to strengthen children's cognitive skills related to executive functioning and reasoning. A principle objective of preschool is to prepare children for later success in school. Most programs focus on activities to support childr ...

    SBIR Phase II 2015 Department of Education
  4. Building Zaption's Ecosystem to Support Video Learning at Scale

    SBC: Zaption, Inc.            Topic: edIES15R0008

    Video Demonstration of the Phase I Prototype: http://youtu.be/AIGigEXn12Q Purpose: This project team will develop and test Zaption, a mobile and desktop platform designed to support educators in effectively and efficiently utilizing video (e.g., from YouTube, Vimeo, or their own desktop) as an interactive teaching and learning object. Personalized learning devices (e.g., smartphones, tablets) pop ...

    SBIR Phase II 2015 Department of EducationInstitute of Education Sciences
  5. Cheetah-Traks: Subterranean Navigation Via Inertial Sensors and Multipath Resistant RF Ranging

    SBC: TrellisWare Technologies, Inc.            Topic: HSB0101006

    The integrated Cheetah Traks and Virtual Inertial Navigation System (V-INS) units will create a denied GPS navigation system capable of tracking unit locations and maintain that accuracy across a range of dynamics and environmental conditions. The target system is targeted to contain less than four components (IMU, computer, communication unit and display) and adds minimal weight to the user.

    SBIR Phase II 2012 Department of DefenseDefense Threat Reduction Agency
  6. Circuit board Component Recovery for Electronic Waste Reduction

    SBC: Advanced Recovery and Recycling, LLC            Topic: 14NCER1A

    Electronic Waste is the fastest growing waste stream in the US. Significant amounts are recoverable for reuse, resale, and refining for precious metals. The disassemblers send circuit boards to refiners/smelters for precious metals recovery. E-Waste disassemblers remove parts from these circuit boards, so only certain parts are smelted. As such they are the key market for our depopulator. Refiners ...

    SBIR Phase II 2016 Environmental Protection Agency
  7. Development of an in vitro assay as correlate of passive immune protection against botulinum neurotoxin to minimize use of whole animal testing

    SBC: ELECTRONIC BIOSCIENCES, INC.            Topic: CBD11109

    This Small Business Innovation Research project will develop a non-animal based in vitro assay for determining the efficacy of Botulinum (BoNT) neutralizing therapeutics. New technologies are currently needed in order to facilitate the development and approval of BoNT vaccines and therapies and reduce the number of vertebrate animals used in medical testing. In Phase 1 of this project, the feasibi ...

    SBIR Phase II 2012 Department of DefenseOffice for Chemical and Biological Defense
  8. Game-Based Learning and Assessment Computer Applications with Direct Representations of Mathematics

    SBC: BRAINQUAKE INC            Topic: 1

    The final product will include a suite of three app-based puzzle games aligned to national math standards for number sense, algebraic thinking, and problem solving. The games will be designed for use in grade 5 and 6 classrooms where students develop and apply content expertise to solving challenges. The games will include an adaptive engine that assesses and adjusts content based on student level ...

    SBIR Phase II 2016 Department of Education
  9. High-Intensity Compact EUV-X-ray Generators Base on Metastable Innershell Molecular State

    SBC: YK BAE CORP            Topic: DTRA122007

    The primary goal of the preceding Phase I program was to demonstrate the feasibility of developing commercially viable products from our technological innovation that enables unprecedentedly high energy efficiency generation of super-intense EUV-x-ray beams via Metastable Innershell Molecular State. We have successfully met the Phase I goal by demonstrating the feasibility, and are now ready for f ...

    SBIR Phase II 2015 Department of DefenseDefense Threat Reduction Agency
  10. Hydrogen/Bromine Energy Storage System

    SBC: TVN Systems, Inc.            Topic: 1

    "It is our objective to develop a cost effective, durable and reliable hydrogen-bromine flow battery system for small-scale electrical energy storage applications. H2/Br2 flow battery technology has been around for decades, however, the lack of low-cost and durable electrode and membrane materials in addition to non-optimal cell/stack configurations have prevented this technology from widespread d ...

    STTR Phase II 2012 Department of EnergyARPA-E
US Flag An Official Website of the United States Government