You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. INSTRUMENTATION FOR AUTOMATED COLONY PROCESSING

    SBC: LARGE SCALE BIOLOGY CORPORATION            Topic: N/A

    THE OBJECTIVE OF THIS PROJECT IS TO (1) PROCESS LARGE NUMBERS OF CLONES THROUGH COLONY PICKING, (2) REPOSITION THECOLONIES IN LARGE RECTANGULAR ARRAYS, (3) PURIFY COLONIES BYRECLONING AS NECESSARY, (4) PROCESS THE DNA FROM EACH COLONYTO ALLOW RECOMBINANT DNAS TO BE TRANSFERRED TO NITROCELLULOSE OR OTHER FILTER MATERIALS, (5) PROBE THE ARRAYS EN MASSE WITH DNA PROBES UNDER DIFFERENT STRINGENCY COND ...

    SBIR Phase II 1990 Department of Energy
  2. ULTRAFINE FILAMENT NBTI SUPERCONDUCTORS

    SBC: Intermagnetics General Corp            Topic: N/A

    MULTIFILAMENTARY SUPERCONDUCTORS WITH VERY FINE NBTI FILAMENT DIAMETERS RANGING FROM 5 TO 9 MICRONS HAVE BEEN MANUFACTURED SUCCESSFULLY IN PRODUCTION QUANTITIES FOR ACCELERATOR MAGNET APPLICATIONS. THESE CONDUCTORS HAVE HIGH CURRENT DENSITY (3,000 A/MM(2) AT 5 T AND 1,250 A/MM(2)AT 8 T), LOW MAGNETIZATION, GOOD FILAMENT QUALITY ('N' (5T) = 60 AND 'N' (8T) = 35), AND LOW PERFORMANCE DEGRADATION CAU ...

    SBIR Phase II 1990 Department of Energy
  3. DEVELOPMENT OF INTERNAL TIN NB3SN CONDUCTORS BY NOVEL MANUFACTURING TECHNIQUES

    SBC: Intermagnetics General Corp            Topic: N/A

    THE PRESENT INTERNAL TIN METHOD OF MANUFACTURING NB3SN CONDUCTORS HAS ADVANCED SIGNIFICANTLY OVER THE PAST SIX YEARS. WITH UNALLOYED NB3SN, CRITICAL CURRENT DENSITY (JC) OF OVER 1,400 A/MM(2) AT 10 T AND LONG WIRE LENGTHS HAVE BEEN REPRODUCIBLY DEMONSTRATED. WITH 1.2 WT% TI ADDED TO NB, THE HIGH FIELD JC HAS INCREASED TO AS HIGH AS 1,000 A/MM(2) AT 12 T. HOWEVER, THE INCREASED WORK-HARDENING OF TH ...

    SBIR Phase II 1990 Department of Energy
  4. LOW TEMPERATURE PROCESSING OF HIGH TC SUPERCONDUCTOR FILMS FOR INTEGRATION OF DETECTOR ARRAYS WITH SILICON CIRCUITRY

    SBC: ADVANCED FUEL RESEARCH, INC.            Topic: N/A

    THE DISCOVERY OF SUPERCONDUCTORS WITH TRANSITION TEMPERATURES ABOVE LIQUID NITROGEN TEMPERATURE HAS LED TO RENEWED INTEREST IN THE APPLICATION OF SUPERCONDUCTIVITY. THESE NEW MATERIALS CAN POTENTIALLY BE USED AS DETECTORS MORE CONVENIENTLY THAN CAN "CLASSICAL" SUPERCONDUCTORS. THE LARGER ENERGY GAP OF THESE NEW HIGH CRITICAL TEMPERATURE(TC) MATERIALS ALSO PROVIDES THE OPPORTUNITY TO FABRICATE JOSE ...

    SBIR Phase II 1990 Department of Energy
  5. RECYCLABLE MOLDS FOR CASTING NUCLEAR FUEL

    SBC: Advanced Technologies/Laboratories Intl            Topic: N/A

    RECYCLING SPENT NUCLEAR FUEL IS AN ECONOMIC NECESSITY FOR THE INTEGRAL FAST REACTOR. AFTER THE FISSION PRODUCTS HAVE BEEN REMOVED, THE IRRADIATED URANIUM FUEL MATERIAL CAN BE CAST INTO NEW FUEL RODS. THE CURRENT INJECTION CASTING PROCESS USES QUARTZ MOLDS THAT ARE NOT REUSABLE, SINCE THE MOLDS MUST BE BROKEN TO REMOVE THE CAST FUEL ROD. THE BROKEN MOLDS ARE RADIOACTIVE WASTE. HOWEVER, APPLICATION ...

    SBIR Phase II 1990 Department of Energy
  6. DETECTION OF ACID RAIN POLLUTANTS USING INFRARED LASERS PRODUCED BY STIMULATED ELECTRON RAMAN SCATTERING

    SBC: Comstock Inc            Topic: N/A

    THIS PROJECT WILL ESTABLISH THE POTENTIAL FOR RAPID RESPONSE, HIGH RESOLUTION DETECTION AND CHARACTERIZATION OF INFRARED (IR) ACTIVE POLLUTANT MOLECULES, SUCH AS S02, N0, AND N02. MINIATURE OPTICAL HEAT PIPES WILL BE CONSTRUCTED AND OPTIMIZED FOR THE GENERATION OF TUNABLE IR LASER LIGHT BY MEANS OF STIMULATED ELECTRON RAMAN SCATTERING (SERS). THE HEAT PIPES WILL USE ALKALI METAL VAPORS AT PRESSURE ...

    SBIR Phase II 1990 Department of Energy
  7. INCREASED SPEED IN DNA SEQUENCING BY UTILIZING LARIS TO LOCALIZE MULTIPLE STABLE ISOTOPE LABELED FRAGMENTS

    SBC: ATOM SCIENCES, INC.            Topic: N/A

    MAPPING AND SEQUENSING THE DNA IN THE HUMAN GENOME IS OF CRUCIAL IMPORTANCE TO FUTURE MEDICAL ADVANCES AND ECONOMIC COMPETITIVENESS. UTILIZATION OF DNA PROBES LABELED WITH DOZENS OF STABLE ISOTOPES INSTEAD OF A SINGLE RADIOISOTOPE COULD INCREASE THE RATE OF SEQUENCE DETERMINATION 100-FOLD OR MORE COMPARED TO CURRENT METHODS. THIS PROJECT INVOLVES A NEW APPROACH, LASER ATOMIZATION RESONANCE IONIZAT ...

    SBIR Phase II 1990 Department of Energy
  8. AN ADVANCED ROBOTIC MANIPULATOR FOR THE INTEGRAL FAST REACTOR FUEL CYCLE FACILITY

    SBC: Remotec Inc.            Topic: N/A

    DEMONSTRATION TESTING OF ADVANCED PROCESS EQUIPMENT IS EXPECTED TO CONFIRM THE FEASIBILITY OF THE INTEGRAL FAST REACTOR (IFR) FUEL CYCLE PROCESS AT THE HOT FUEL EXAMINATION FACILITY - SOUTH (HFEF-S) ON THE ARGONNE-WEST SITE IN IDAHO. TEST RESULTS WILL BE INCORPORATED INTO THE DESIGN OF A COMMERCIAL IFR FUEL CYCLE FACILITY. THIS PROJECT CONTRIBUTES TO DEVELOPMENT OF A CONCEPTUAL DESIGN FOR AN ADVAN ...

    SBIR Phase II 1990 Department of Energy
  9. LOW COST AND IMPROVED CARBON COMPOSITES FOR PHOSPHORIC ACID FUEL CELLS

    SBC: FuelCell Energy, Inc.            Topic: N/A

    CARBON COMPOSITES ARE A MAJOR COMPONENT OF PHOSPHORIC ACID FUEL CELL (PAFC) COST. THESE COMPONENTS ARE MADE BY CARBONIZING RESIN/CARBON COMPOSITES. THE HEAT TREATMENT PROCESS FOR OBTAINING A DEFECT-FREE PART IS LENGTHY (7 TO 30DAYS) AND EXPENSIVE. SHORTER HEAT TREATMENT CYCLES CAN BE DESIGNED IF THE CRITICAL TEMPERATURE ZONES AND HEATING RATES(I.E., THOSE AT WHICH DEFECTS OCCUR) CAN BE IDENTIFIED. ...

    SBIR Phase II 1990 Department of Energy
  10. AN IN-VESSEL AND EX-VESSEL SMALL VOLUME REMOTE MAINTENANCE SYSTEM FOR THE COMPACT IGNITION TOKAMAK

    SBC: Telerobotics International,            Topic: N/A

    REMOTE MAINTENANCE OF THE COMPACT IGNITION TOKAMAK (CIT) POSES FORMIDABLE CHALLENGES BECAUSE OF ITS INTERNAL DIMENSIONAL CONSTRAINTS, DIVERSITY OF MAINTENANCE OPERATIONS, AND GEOMETRICALLY INTRICATE ARRANGEMENT OF EXTERNAL SERVICE EQUIPMENT. THESE CHALLENGES MUST BE ADDRESSED TO SUPPORT FUTURE "HOT" OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) CIT. PHASE I INTRODUCES A SINGLE SOLUTI ...

    SBIR Phase II 1990 Department of Energy
US Flag An Official Website of the United States Government