You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Monitor for Risk of Structural Collapse

    SBC: Sekos, Inc.            Topic: N/A

    The proposal is to develop a system to monitor fire-induced structural vibrations that provide real time data correlating with structural integrity. The system is designed to bridge an "information void" and provide firefighters with information that can warn of impending collapse. The system, based on accelerometer technology, will monitor structural integrity through the algorithmic analysis of ...

    SBIR Phase II 2004 Department of CommerceNational Institute of Standards and Technology
  2. High Performance Signal Processing Tools with Fluctuation-Enhanced Sensing

    SBC: Signal Processing, Inc.            Topic: 9020163R

    We propose a high performance library of signal processing tools that incorporate a newly developed technique known as fluctuation enhanced sensing (FES) to enhance the novel microsensor developed at NIST. Our goal is to improve the performance of the NIST sensor from two angles. One is to apply our existing proven algorithms to the NIST data. The other one is to incorporate advanced FES concept t ...

    SBIR Phase I 2011 Department of CommerceNational Institute of Standards and Technology
  3. Production Methods and Software for NIST Calibration Phantoms

    SBC: SIGMA K CORP            Topic: 9050868TT

    Currently, there are over 10,000 MRI scanners used in the US alone. US citizens today are mobile and many times medical treatments may require MRI scans from several different facilities. Images from MRI scanners can also drift over time. There is a tremendous need for all medical imaging scanners to be on the same level. Sigma-K will develop the commercialization of the ISMRM/NIST MRI Calibration ...

    SBIR Phase I 2011 Department of CommerceNational Institute of Standards and Technology
  4. Enhanced Security Content Automation Protocol Editor

    SBC: G2, INC.            Topic: 9040577R

    G2 proposes to develop an intuitive, interactive SCAP content creation and editing utility that will provide a user-friendly operating environment. The promise of security automation offers the opportunity for great advances in software assurance, security governance/reporting, and ongoing monitoring activities. Hindering that promise is the fact that current data exchange protocols are cumbersome ...

    SBIR Phase I 2011 Department of CommerceNational Institute of Standards and Technology
  5. Novel Technical Approach to Produce III-N Sample Libraries

    SBC: TECHNOLOGIES & DEVICES INTERNATIONAL,            Topic: N/A

    TDI proposes to produce combinatorial GaN and AlGaN samples library having a wide range of doping and fabricated using a variety of surface treatment conditions. These samples will be grown using novel technological approach based on advanced hydride vapor phase epitaxy (HVPE). This method is known to produce bulk GaN materials with low defect density. Recently, TDI has demonstrated high throughpu ...

    SBIR Phase I 2004 Department of CommerceNational Institute of Standards and Technology
  6. Use of a Genetically Modified Organism To Assess Sewer Line Integrity

    SBC: BioTrackers            Topic: N/A

    When sewer exfiltration leaks into the environment, the entry of fecal bacteria into groundwater and surface water increases health risks. Leaking sewers also are suspected sources of fecal contamination in many surface waters designated for total maximum daily load (TMDL) plans. Development of TMDL plans has been hindered by the lack of a reliable and cost-effective method to identify fecal con ...

    SBIR Phase I 2004 Environmental Protection Agency
  7. Wafer Level Supercritical Carbon Bioxide-Based Metal Depositon for Microelectronic Applications

    SBC: MiCell Technologies, Inc.            Topic: N/A

    This proposal describes the application, development and commercial scale-up of a process successfully developed under EPA contract number EP-D-04-042 for the deposition of copper and copper barrier materials such as ruthenium, titanium and other metals. This process could replace CU electroplating currently used to fill deep trenches and thin film deposition in microelectronic circuit manufactur ...

    SBIR Phase I 2004 Environmental Protection Agency
  8. Wireless Underwater Telemetry System for Surface Water Quality Monitoring

    SBC: VORTANT TECHNOLOGIES LLC            Topic: C3NCERB1

    The goal of this Phase I research project is to create a product to revolutionize the planning, installation, damage resistance, and cost effectiveness of in situ, real-time water quality monitoring systems. The proposed project will develop a water quality telemetry system that eliminates the wires, cables, and above-water electronics currently needed for real-time monitoring. Using ...

    SBIR Phase I 2004 Environmental Protection Agency
  9. Metal Deposition for Microelectronics Using CO2 as a Solvent

    SBC: MiCell Technologies, Inc.            Topic: C3NCERA1

    MiCell Technologies, Inc., proposes a new process for the deposition of metallic thin films of copper, ruthenium, titanium, and other metals used as barrier layers, seed layers, and interconnects. This process would replace the current electroplating approach used in filling deep trenches and forming thin films in microelectronic circuit manufacturing. The electroplating process genera ...

    SBIR Phase I 2004 Environmental Protection Agency
  10. Wireless Underwater Telemetry System for Surface Water Quality Monitoring

    SBC: VORTANT TECHNOLOGIES LLC            Topic: N/A

    The goal of this Phase I research project is to create a product to revolutionize the planning, installation, damage resistance, and cost effectiveness of in situ, real-time water quality monitoring systems. The proposed project will develop a water quality telemetry system that eliminates the wires, cables, and above-water electronics currently needed for real-time monitoring. Using an innovati ...

    SBIR Phase I 2004 Environmental Protection Agency
US Flag An Official Website of the United States Government