You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
COMPOSITE PLASMA-POLYMER MEMBRANES
SBC: BEND RESEARCH, INC. Topic: N/ATHE POTENTIAL ADVANTAGES OF MEMBRANE PROCESSES FOR SEPARATIONS ARE WELL KNOWN. HOWEVER, CURRENT MEMBRANE SYSTEMS HAVE CAPTURED ONLY A SMALL FRACTION OF THE POTENTIAL MARKET, PRIMARILY BECAUSE THEY ARE MADE FROM POLYMERS THAT ARE NOT DURABLE ENOUGH FOR MANY APPLICATIONS, AND THEY DO NOT HAVE SUFFICIENT SELECTIVITY FOR CLEAN SEPARATIONS. PLASMA-POLYMER MEMBRANES OFFER A SOLUTION TO BOTH PROBLEMS. TH ...
SBIR Phase II 1994 Department of Energy -
A NOVEL PROCESS FOR THE REMOVAL OF NITROGEN FROM NITROGEN-CONTAININGNATURAL GAS: DEVELOPMENT OF WATER-BASED ABSORBENTS
SBC: BEND RESEARCH, INC. Topic: N/ADOMESTIC NATURAL GAS PROVIDES AN INCREASINGLY IMPORTANT PORTION OF THE U.S. ENERGY SUPPLY. ESTIMATED U.S. GAS RESERVES ARE ABOUT 1000 TRILLON STANDARD CUBIN FEET (SCF)--OR ABOUT 1000 QUADS. FULLY 25% OF THE ESTIMATED U.S. NATURAL GAS RESERVES ARE CONTAMINATED WITH NITROGEN (N2) TO THE EXTENT THAT THE GAS CANNOT BE USED WITHOUT PROCESSING TO REDUCE THE N2 CONCENTRATION. NO TECHNOLOGY EXISTS TODAY F ...
SBIR Phase II 1994 Department of Energy -
A LARGE TARGET RCS SIMULATOR WITH ANTENNA SCATTERING AND HIGH-ORDER EDGE DIFFRACTION CAPABILITY
SBC: DEMACO, INC. Topic: N/AWe propose to develop a general purpose computer code for calculating the scattering from antennas on an aircraft, which is described by a CAD file. The scattering contribution will include both the passive structure mode and active irradiation mode, calculcated by a hybrid of a high-frequency ray technique and a rigorous finite element technique. The proposed code will be made compatible with the ...
SBIR Phase II 1994 Department of DefenseAir Force -
SCRAP TIRE PYROLYSIS-- PRODUCTION OF HIGHLY ENHANCED MARKETABLE PRODUCTS
SBC: Hichem Corp. Topic: N/ARESEARCH WILL BE CONDUCTED BY HICHEM CORPORATION, TO DEVELOP A NEW TECHNOLOGY FOR PYROLYSIS OF SCRAP TIRES. DISPOSAL OF USED TIRES IS A BIG PROBLEM IN THE WORLD, ESPECIALLY USA, SINCE MORE THAN 2.5 MILLION TIRES ARE DISCARDED EACH YEAR. MOST OF THESE TIRES ARE DISPOSED IN LANDFILLS. PYROLYSIS OF SCRAP TIRES HELPS TO RECOVER AND REUSE MOST OF THE VALUABLE CHEMICAL AVAILABLE IN TIRES. PYROLYSIS OF S ...
SBIR Phase II 1994 Environmental Protection Agency -
Liquid Crystal Displays within Image Intensifier Systems
SBC: Night Vision Corp Topic: N/AThe ability to display critical information within the optical train of a night vision device has become a requirement in the aviation community. The current display approaches rely on CRT's, optical combiners, lenses, and fiber optic cable to inject the symbology within the optical train of the night vision device. Besides decreased image tube life, bulkiness, and additional weight, the performan ...
SBIR Phase II 1994 Department of DefenseAir Force -
A PRESSURE SWING ADSORPTION/TEMPERATURE SWING ADSORPTION PROCESS FOR NITROGEN REJECTION FROM NATURAL GAS
SBC: Northwest Fuel Development, In Topic: N/AA COMBINATION PRESSURE SWING ADSORPTION (PSA)/TEMPERATURE SWING ADSORPTION (TSA) PROCESS WILL BE DEVELOPED FOR REMOVING NITROGEN FROM LOW-QUALITY NATURAL GAS IN ORDER TO PRODUCE PIPELINE QUALITY NATURAL GAS ON A SMALL SCALE. NITROGEN REJECTION REMAINS THE MAJOR TECHNOECONOMIC HURDLE FOR UTILIZING MAJOR RESOURCES OF LOW-QUALITY NATURAL GAS. THIS WILL PROVIDE A METHODOLOGY FOR PRODUCING A VALUABLE F ...
SBIR Phase II 1994 Department of Energy -
Novel Synthesis of Cubane Precursor
SBC: Steroids Ltd. Topic: N/ACubane C8H8 is potentially an extremely valuable fuel substitute for the kerosene-based rocket propellant RP-1. The classical Eaton synthesis to yield cubane 1,4-dicarboxylic acid in five steps involves a key photochemical reaction. The steps before and after the critical 2+2 cycloaddition are standardized and readily scalable. However, this steps alone prevents scale-up. We will develop a non-pho ...
SBIR Phase II 1994 Department of DefenseAir Force -
AN OCEANOGRAPHIC CARBON DIOXIDE SENSOR
SBC: UMPQUA RESEARCH COMPANY Topic: N/ATHE FEASIBILITY OF A SIMPLE ATMOSPHERIC CARBON DIOXIDE (CO2) SENSOR FOR OCEANOGRAPHIC DEPLOYMENT WILL BE EXPLORED IN THIS PHASE I PROJECT. THREE BASIC STEPS ARE REQUIRED FOR SENSOR OPERATION: MEMBRANE EQUILIBRATION OF GASEOUS AND AQUEOUS CO2, CHEMICAL AMPLIFICATION OF THE CONCENTRATION OF THE IONIZED BYPRODUCTS OF CO2 DISSOLUTION, AND SPECIFIC CONDUCTANCE DETECTION. ATMOSPHERIC CO2 EQUILBRATES ACR ...
SBIR Phase II 1994 Department of Energy -
Compact and Integrated IMU for GPS Denied Navigation Using Fast-Light Gyroscopes and Accelerometers
SBC: DIGITAL OPTICS TECHNOLOGIES INC Topic: AF112100ABSTRACT:For GPS denied navigation, there is a need for developing inertial measurement units (IMU), employing gyroscopes and accelerometers, with better accuracy and/or smaller volume and weight than the state of the art.Under Phase I, we have established the feasibility of realizing a superluminal ring laser gyroscope (SRLG) and a superluminal ring laser accelerometer (SRLA), based on diode-pump ...
SBIR Phase II 2014 Department of DefenseAir Force -
High-Power Vertical-Junction Field-Effect Transistors Fabricated on Low-Dislocation-Density GaN by Epitaxial Lift-Off [Phase IIS]
SBC: MICROLINK DEVICES INC Topic: 1In this program, we will develop a breakthrough technology that will enable wafer-scale epitaxial lift-off (ELO) of GaN power device heterostructures from low-dislocation-density bulk GaN substrates. This technology will be used to provide a low-cost vertical junction field effect transistors (VJFETs) with high breakdown voltage (greater than 1,200 V) and high current capability (greater than 100 ...
SBIR Phase II 2014 Department of EnergyARPA-E