You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Project NumberShire: A Game-Based Integrated Learning and Assessment System to Target Whole Number Concepts

    SBC: Thought Cycle            Topic: N/A

    Purpose: Prior research points to several features of technology-based math games that may be important for supporting the learning needs of students with or at-risk for disabilities. These include games that engage students in highly motivating narratives, provide focused foundational knowledge and scaffolding of learning whole numbers concepts, and provide performance monitoring capabilities. Th ...

    SBIR Phase II 2012 Department of Education
  2. Numbershire II: Math Games for 2nd graders With or At Risk for LD

    SBC: Thought Cycle            Topic: N/A

    This project team is developing a prototype of Numbershire II, a web-based suite of mini math games for second graders with or at-risk for disabilities. The games will be set in the context of a fantasy-themed village and will adapt the level of difficulty based on individual student needs. Additionally, the project will support students in learning numbers and operations in base 10, operations, a ...

    SBIR Phase I 2012 Department of Education
  3. Recycling Rare Earth Metals from Nickel Metal Hydride Batteries

    SBC: ONTO TECHNOLOGY, LLC            Topic: C

    This Phase I Small Business Innovation Research Project develops methods of recycling rare earth alloys from used nickel metal hydride batteries. Alloys of rare earth metal, nickel and other metals provide functional hydride storage materials that are critical to the operation of nickel metal hydride batteries and their applications. The current fleet of hybrid electric vehicles relies upon nick ...

    SBIR Phase I 2012 Environmental Protection Agency
  4. A 10 Kilowatt, Rankine Cycle Agricultural Waste to Energy Conversion Module Utilizing Ultra Micro Turbo-Alternators

    SBC: Fluidic microControls, Inc.            Topic: H

    Current anaerobic digester systems are designed for capturing energy from waste from large heads of farm animals. GHD, Inc., a leading manufacturer of anaerobic digesters, has stated that a minimum dairy heard size for economical implementation of a biogas system as 800 cows. These require turbine or diesel generator sets of 100 Kilowatt size and larger, a limiting factor in economically scaling ...

    SBIR Phase I 2012 Environmental Protection Agency
  5. A NOVEL MEMBRANE SYSTEM FOR RECOVERING VOLATILE ORGANIC CONTAMINANTS FROM AIR

    SBC: BEND RESEARCH, INC.            Topic: N/A

    THE CONTROL OF VOLATILE ORGANIC CONTAMINANT (VOC) EMISSIONS FROM INDUSTRIAL PROCESSES AND FUEL SOURCES IS AN IMPORTANT ENVIRONMENTAL PROBLEM. STRINGENT REGULATIONS HAVE BEEN ENACTED THAT WILL LIMIT SUCH EMISSIONS, HEIGHTENING THE NEED FOR SMALL, SIMPLE UNITS THAT CAN RECOVER VOCS AND RETURN THEM AS REUSABLE COMPOUNDS. CURRENT VOC-REMOVAL TECHNOLOGIES, SUCH AS INCINERATION, CARBON ADSORPTION, AND C ...

    SBIR Phase II 1993 Environmental Protection Agency
  6. SCRAP TIRE PYROLYSIS-- PRODUCTION OF HIGHLY ENHANCED MARKETABLE PRODUCTS

    SBC: Hichem Corp.            Topic: N/A

    N/A

    SBIR Phase I 1993 Environmental Protection Agency
US Flag An Official Website of the United States Government