You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. An automated system for honey bee husbandry that enable high-throughput biological assays

    SBC: Forgebee, LLC            Topic: 813

    Project SummaryTitle: An automated system for honey bee husbandry that enables high-throughput biologicalassaysPD/PI: Dr. Adam Hamiton; ForgeBeeSubaward PD/PI: Dr. Gene Robinson; University of Illinois at Urbana ChampaignHoney bees are crucial for agriculture and serve as a model system for insect pollinatorecotoxicology. At the heart of a honey bee colony's health and productivity is a set of com ...

    SBIR Phase I 2023 Department of Agriculture
  2. Digital Twin-based Machine Control for Laser Powder Bed Fusion of Metallic Aerospace Components

    SBC: HIDENN-AI LLC            Topic: N23AT004

    Additive manufacturing (AM) processes such as laser powder bed fusion (LPBF) have received a great deal of attention due to their unique capability in producing parts with complex geometries. However, a major challenge limiting the application of LPBF today is the high variability in the quality of finished components. To address this challenge, HIDENN-AI, LLC and Northwestern University (NU) prop ...

    STTR Phase I 2023 Department of DefenseNavy
  3. Physics-enhanced AI/ML tool for additive manufacturing defect detection and prediction

    SBC: QUESTEK INNOVATIONS LLC            Topic: N222117

    Through this proposed SBIR effort, QuesTek Innovations LLC will develop a physics-enhanced machine learning (ML) software to reduce exhaustive typical on-destructive testing or enable feed forward control methodologies for fabrication of high-quality additive manufacturing (AM) component. Process induced defects like keyholing and lack of fusion porosity are shown to be strongly correlated with AM ...

    SBIR Phase I 2023 Department of DefenseNavy
  4. Submarine Atmospheric Contaminant Scrubbing Technology

    SBC: NUMAT TECHNOLOGIES INC            Topic: N211034

    Metal-organic frameworks (MOFs) are advanced adsorbents with applicability to military and civilian applications including but not limited to chemical biological protection, chemical warfare agent decontamination, toxic industrial chemical remediation, medical oxygen delivery, and energy storage. These materials have been produced in ton-scale quantities and have seen commercial use in the electro ...

    SBIR Phase II 2023 Department of DefenseNavy
  5. MWIR TPA Notch Filter

    SBC: EPIR, INC.            Topic: N231065

    EPIR proposes to develop a HgCdTe (MCT)-based notch filter that is capable of autonomously attenuating pulses from an incoming mid-wavelength infrared (MWIR) laser threat while simultaneously transmitting scene energy critical to the normal operation of the imaging system. This filter uses two-photon absorption (TPA) nonlinear response of narrow bandgap semiconductor materials to attenuate high la ...

    SBIR Phase I 2023 Department of DefenseNavy
  6. Qualification of Aircraft Accelerometer NSN 6610-00-151-6684 & Torque Motor NSN 6105-01-326-8652

    SBC: Kaney Aerospace, Inc.            Topic: DLA213001

    The objective of this Phase II SBIR proposal is to continue the design and qualification efforts for a single-axis accelerometer (NSN 6610-00-151-6684) and perform detailed design and qualification activities for a Torque Motor (NSN 6105-01-326-8652). During Phase II, Kaney will utilize in-house manufacturing and analysis capabilities to produce drawings and manufacturing/qualification plans for t ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  7. Source Approval Request (SAR) Package and Development Plan for Battery Connector Assembly NSN 6150-01-629-3728

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 6150-01-629-3728, a Battery Connector Assembly. This battery connector assembly is out of stock at two different suppliers (but available at a third supplier, please see below in Figure 6-1), and the NSN pertains to F-15C and F-15D based platforms including variants currently flown by some ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  8. Source Approval Request (SAR) Package and Development Plan for Radio Cable Assembly NSN 5995-11-959-918

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 5995-01-195-9918, a Radio Cable Assembly for the B-1 platform. During Phase I, Kaney will utilize our in-house manufacturing and analysis capabilities to develop Kaney drawings and a manufacturing/qualification plan for this part. Kaney has extensive domain knowledge and capabilities rela ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  9. Source Approval Request (SAR) Package and Development Plan for Generator Rack NSN 6110-10-733-343

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 6110-01-073-3343, a Generator Rack for the C-130 platform. During Phase I, Kaney will utilize our in-house manufacturing and analysis capabilities to develop Kaney drawings and a manufacturing/qualification plan for this part. Kaney has extensive domain knowledge and capabilities related ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  10. Multimode IR/RF Surrogate Seeker

    SBC: EPISENSORS INC            Topic: N232088

    A passive multimode IR and RF sensor fusion platform in a missile seeker guidance system would greatly benefit a missile’s capabilities in tracking and locking to a target. The strengths of RF and IR somewhat complement each other and the use of both can greatly increase the system’s ability to react to current countermeasures by independently selecting a disaffected sensor’s data to follow. ...

    SBIR Phase I 2023 Department of DefenseNavy
US Flag An Official Website of the United States Government