You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Outdoor Biomass Gasifier Hydronic Heater (OBGHH)

    SBC: Chip Energy            Topic: N/A

    America needs a clean, affordable, reliable and sustainable product or system to obtain heat for residences in cold climates using renewable, carbon-neutral, plentiful, low-cost biomass fuels of diverse types found close to the location of usage. The available biomass could heat hundreds of thousands of homes, and costly natural gas could be directed to higher-value usage. Gasifiers are devices t ...

    SBIR Phase I 2008 Environmental Protection Agency
  2. RF Breakdown Studies using Pressurized Cavities

    SBC: MUONS INC            Topic: 50a

    Many present and future particle accelerators are limited by the maximum electric gradient and peak surface fields that can be realized in RF cavities. Despite considerable effort, a comprehensive theory of RF breakdown has not been achieved and mitigation techniques to improve practical maximum accelerating gradients have had only limited success. Part of the problem is that RF breakdown in an ...

    STTR Phase I 2008 Department of Energy
  3. Pulsed Focusing Recirculating Linacs for Muon Acceleration

    SBC: MUONS INC            Topic: 49a

    Neutrino Factories and Muon Colliders require the rapid acceleration of short-lived muons to multi-GeV and TeV energies. A Recirculating Linear Accelerator (RLA) that uses International Linear Collider (ILC) RF structures can provide the exceptionally fast acceleration needed to enable each muon to pass several times through each high-gradient cavity. However, the technical feasibility, ultimate ...

    STTR Phase I 2008 Department of Energy
  4. Hydrogen Filled RF Cavities for Muon Beam Cooling

    SBC: MUONS INC            Topic: 50a

    Muon beams used in high energy physics research must be cooled as quickly as the short muon lifetime requires. This cooling is accomplished by ionization cooling, which requires low-Z energy absorbers immersed in a strong magnetic field and high-gradient, large-aperture RF cavities. However, RF cavities that operate in vacuum are vulnerable to dark-current-generated breakdown, which is exacerbat ...

    STTR Phase I 2008 Department of Energy
  5. Magnets for Muon 6D Helical Cooling Channels

    SBC: MUONS INC            Topic: 31

    This project will develop the magnets needed to create bright muon beams for many applications ranging from scientific accelerators and storage rings, to beams to study material properties and new sources of energy. The Helical Cooling Channel (HCC), a new technique for six-dimensional (6D) cooling of muon beams using a continuous absorber inside superconducting magnets, has shown considerable pro ...

    SBIR Phase II 2008 Department of Energy
  6. Stopping Muon Beams

    SBC: MUONS INC            Topic: 31

    Physics experiments often use low-energy beams of unstable particles that stop in a target in order to provide high sensitivity to rare processes with reduced backgrounds. However, the stopping rate in the target is limited by the dynamics of the production process and by multiple scattering and energy straggling in the material used to slow the particles. As a result, the event rates and sensiti ...

    SBIR Phase II 2008 Department of Energy
  7. Rugged Ceramic Window for RF Applications

    SBC: MUONS INC            Topic: 36a

    The high-current RF cavities needed for many accelerator applications often are limited by the power transmission capability of the pressure barriers (windows) that separate the cavity from the power source. Most efforts to improve RF window design have focused on alumina ceramic, the most popular historical choice, and have not taken advantage of new materials. In this project, alternative window ...

    SBIR Phase I 2008 Department of Energy
  8. Multi-Purpose Fiber Optic Sensors for HTS Magnets

    SBC: MUONS INC            Topic: 51b

    Magnets using new high temperature superconductor (HTS) materials are showing great promise for high magnetic field applications such as particle accelerators and the plasma-confinement systems for fusion reactors. However, the development and operation of these magnets is limited because appropriate sensors and diagnostic systems are not yet available to monitor the manufacturing and operational ...

    SBIR Phase I 2008 Department of Energy
  9. Compact, Achromatic Non-Scaling FFAG Accelerator for HEP, Commercial and Medical Applications

    SBC: Particle Accelerator Corporation            Topic: 49a

    Proton and light-ion accelerators have many research and medical applications, but the current state of technology in accelerators severely limits their widespread use: (1) synchrotrons have an intrinsic low duty cycle and become quite large for light ions; and (2) cyclotrons do not have energy variability and require complex superconducting magnets for high energy. A new concept in non-scaling Fi ...

    SBIR Phase I 2008 Department of Energy
  10. Novel Attrition-Resistant Fischer Tropsch Catalyst

    SBC: Rbr@vision            Topic: 04a

    Liquid fuels derived from coal can be made from a synthesis gas by the Fischer Tropsch catalytic process, which uses metal catalysts supported on inert alumina or silica particles. These catalysts are subject to physical breakdown, which shortens their useful lives, fouls the chemical process, and necessitates frequent catalyst replacement. The time and capital required for replacing broken-down ...

    STTR Phase I 2008 Department of Energy
US Flag An Official Website of the United States Government