You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Quasi-Conformal Ionized PVD Coatings Using HiPIMS Deposition And Etching For Complex 3D Additive Manufacturing Refractory Alloys
SBC: STARFIRE INDUSTRIES LLC Topic: AF224D014This D2P2 program plans to explore a new refractory coating technology to successfully coat additively manufactured (AM) C103 components that exhibit variability in surface roughness, 3D geometrical complexity and build orientation with precision-engineer
SBIR Phase II 2023 Department of DefenseAir Force -
Human-Interpretable ML for Certification and Sustainment of Fatigue-Critical AM Components
SBC: QUESTEK INNOVATIONS LLC Topic: AF21ATCSO2To aid in Air Force design and sustainment activities of additively manufactured components, QuesTek Innovations LLC, in collaboration with the University of Utah, will further develop and mature an accurate, efficient, and comprehensive fatigue life mode
STTR Phase II 2023 Department of DefenseAir Force -
Epitaxial Growth of Galium Oxide for Next-Gen Microwave Electronics
SBC: SYNERGY RESEARCH LABS, LLC Topic: AF224D029Current production methods of next-generation high critical field strength solid state electronic materials like the emerging UWBG Ga2O3 are too slow, yields are too low, electricity costs are too high, and defects plague the realization of an energy-effi
SBIR Phase II 2023 Department of DefenseAir Force -
Qualification of Aircraft Accelerometer NSN 6610-00-151-6684 & Torque Motor NSN 6105-01-326-8652
SBC: Kaney Aerospace, Inc. Topic: DLA213001The objective of this Phase II SBIR proposal is to continue the design and qualification efforts for a single-axis accelerometer (NSN 6610-00-151-6684) and perform detailed design and qualification activities for a Torque Motor (NSN 6105-01-326-8652). During Phase II, Kaney will utilize in-house manufacturing and analysis capabilities to produce drawings and manufacturing/qualification plans for t ...
SBIR Phase II 2023 Department of DefenseDefense Logistics Agency -
SiGeSn LADAR Receiver
SBC: ARKTONICS LLC Topic: AF222D033In this project, Arktonics will develop a revolutionary infrared sensor technology platform offering monolithic integration of Complementary Metal–Oxide–Semiconductor (CMOS) circuits with a high-performance detector array made from an emerging group-IV al
SBIR Phase II 2023 Department of DefenseAir Force -
REPLACING PLASTIC WITH BIODEGRADABLE PACKGING IN FOOD SERVICE
SBC: Biomass Energy Systems, Inc. Topic: DLA211003This proposal follows the DLA SBIR Phase 1 Contract SP4701-21-P-0075. It seeks resources to move to Phase 2 so that the lessons learned and data developed in Phase 1 will further expand on the solution, including the field demonstration for replacing the plastic packaging in food service with the biodegradable Cellulosic Bio-Polymer (CBP) packaging to address military needs. Phase 1 was a great le ...
SBIR Phase II 2023 Department of DefenseDefense Logistics Agency -
Composite Based Additive Manufacturing Scaling of Throughput, Volume, and Speed
SBC: IMPOSSIBLE OBJECTS, INC. Topic: AF21ATCSO1The current Phase II project is expanding the CBAM material offerings to include uniaxial carbon-fiber substrates into the CBAM process. It has already been shown that the strength and stiffness have improved by at least 250-300% (3.5-4x stronger and sti
STTR Phase II 2023 Department of DefenseAir Force -
A Disruptive Battery Technology
SBC: Vissers Battery Corporation Topic: AFX236DPCSO1The proposed project intends to reduce the technical and financial risks associated with a disruptive battery technology so that DoD program executive officers and private investors are inclined to finance the commercialization of the technology. The proj
SBIR Phase II 2023 Department of DefenseAir Force -
Accelerating Additive Manufacturing Materials Development for Enhanced Munitions
SBC: 3DEGREES, LLC Topic: AFX234DCSO23Degrees’ TraceAM software is a streamlined platform designed to effectively organize, analyze, and deploy critical technical data packages related to Additive Manufactured parts. It is a secure and customizable interface ideal for use in munitions develo
SBIR Phase II 2023 Department of DefenseAir Force -
Qualification of Aircraft Current Transformer Assembly
SBC: Kaney Aerospace, Inc. Topic: DLA203001The focus of this SBIR project is to design, develop and deliver a manufacturable current transformer to replace the obsolete legacy transformer that is currently in use in the B-52. During the Phase I and Phase I Option periods of the project, Kaney successfully reverse-engineered the legacy transformer and designed and built a demonstration replacement transformer to meet form, fit and function ...
SBIR Phase II 2022 Department of DefenseDefense Logistics Agency