You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Low Cost Carbon Fluoride Active Materials for BA-5790/U Lithium Batteries
SBC: AMERICAN ENERGY TECHNOLOGIES CO Topic: DLA152001American Energy Technologies Co. will partner with Eagle Picher Technologies in order to develop a lean and efficient method for synthesis of Lithium battery grade carbon monofluoride (CFx). The focus of the development / prototyping work will be on continuous processing, application of domestic raw materials and use of modern material de-aggregation techniques for particles of the end-product. Pr ...
SBIR Phase II 2017 Department of DefenseDefense Logistics Agency -
ExtruMach-Mill
SBC: FAIRMOUNT TECHNOLOGIES LLC Topic: DLA152001Fairmount Technologies (FT) has demonstrated that ExtruMach is a disruptive technology for drilling curved extrusions and proposes to further develop this during Phase II for milling extrusions. ExtruMach-PoCM (proof of concept machine) is a flow-type multi-axis CNC machine with a small footprint, which is more capable than existing machines in that it has no limit on the length of parts it can ha ...
SBIR Phase II 2017 Department of DefenseDefense Logistics Agency -
Aircraft Alternative Braking System for Reduced Cost of Sustainment
SBC: AMERICAN MAGLEV TECHNOLOGY OF FLORIDA, INC. Topic: DLA161002This proposal provides a detailed account of the Teams work through Phase 1 of the Magnetic Braking and Electric Taxiing SBIR as well as provides a pathway for building and testing a brake system in Phase 2. Having competed the effort of designing the magnetic braking and electric taxiing system in Phase 1, the Team is able to look back and take account the Program goals, accomplishments, and nece ...
SBIR Phase II 2017 Department of DefenseDefense Logistics Agency