You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Ultrahigh Efficacy Air Purifier for Airborne Pathogens

    SBC: Sonata Scientific            Topic: 3A

    The COVID-19 pandemic has heightened awareness of airborne pathogens and their role in transmitting infection throughout the population. The threat of airborne pathogens extends beyond SARS-CoV-2. Diseases caused by airborne viruses (Influenza), bacteria (Legionnaires’ disease and Tuberculosis), and fungi (aspergillosis) are also prevalent, with Influenza estimated to cause 200,000–500,000 wor ...

    SBIR Phase II 2023 Environmental Protection Agency
  2. Qualification of Aircraft Accelerometer NSN 6610-00-151-6684 & Torque Motor NSN 6105-01-326-8652

    SBC: Kaney Aerospace, Inc.            Topic: DLA213001

    The objective of this Phase II SBIR proposal is to continue the design and qualification efforts for a single-axis accelerometer (NSN 6610-00-151-6684) and perform detailed design and qualification activities for a Torque Motor (NSN 6105-01-326-8652). During Phase II, Kaney will utilize in-house manufacturing and analysis capabilities to produce drawings and manufacturing/qualification plans for t ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  3. REPLACING PLASTIC WITH BIODEGRADABLE PACKGING IN FOOD SERVICE

    SBC: Biomass Energy Systems, Inc.            Topic: DLA211003

    This proposal follows the DLA SBIR Phase 1 Contract SP4701-21-P-0075. It seeks resources to move to Phase 2 so that the lessons learned and data developed in Phase 1 will further expand on the solution, including the field demonstration for replacing the plastic packaging in food service with the biodegradable Cellulosic Bio-Polymer (CBP) packaging to address military needs. Phase 1 was a great le ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  4. EdscapeXR

    SBC: MNDTRST Inc.            Topic: 91990023R0016

    Not available

    SBIR Phase II 2023 Department of EducationInstitute of Education Sciences
  5. Reverse Engineering the Legacy Technology Transferred from the EOM- GASKET

    SBC: AMERICAN ENERGY TECHNOLOGIES CO            Topic: DLA202001

    The project focuses on supporting the US Navy’s fleet of critical assets containing components that are either no longer readily available or produced by the US Government molding shops at high cost. American Energy Technologies Co. (AETC) of Arlington Heights, Illinois, will re-design, modernize, and manufacture several of these parts in-house by reverse-engineering the legacy technology transf ...

    SBIR Phase II 2022 Department of DefenseDefense Logistics Agency
  6. SEL Quest Digital Platform to Modernize and Advance Assessment of Student Social Emotional Compentencies

    SBC: XSEL LABS INC            Topic: 91990022R0005

    Not available

    SBIR Phase II 2022 Department of EducationInstitute of Education Sciences
  7. Efficient fabrication of components for air and space systems through thermoplastic forming of bulk metallic glasses

    SBC: SUPERCOOL METALS LLC            Topic: DLA212003

    Manufacturing of complex metallic components for air and space systems is fundamentally challenging. Traditional processing requires multiple steps, has a high cost and a long production time. Bulk metallic glasses (BMGs) are the only metals that can be processed through thermoplastic forming (TPF) like plastics. In addition, BMGs have properties that are superior to conventional materials, includ ...

    SBIR Phase II 2022 Department of DefenseDefense Logistics Agency
  8. Qualification of Aircraft Current Transformer Assembly

    SBC: Kaney Aerospace, Inc.            Topic: DLA203001

    The focus of this SBIR project is to design, develop and deliver a manufacturable current transformer to replace the obsolete legacy transformer that is currently in use in the B-52. During the Phase I and Phase I Option periods of the project, Kaney successfully reverse-engineered the legacy transformer and designed and built a demonstration replacement transformer to meet form, fit and function ...

    SBIR Phase II 2022 Department of DefenseDefense Logistics Agency
  9. Auxiliary Power Supply for Aerospace Hydraulic Systems

    SBC: Kaney Aerospace, Inc.            Topic: DLA203001

    The Defense Logistics Agency (DLA) and the United States Air Force (USAF) are interested in a new design that overcomes obsolescence and repair issues associated with Auxiliary Power Supply (APS) units used in aerospace hydraulic systems. The need for alternative suppliers for aftermarket and obsolete components is critical to maintaining mission readiness and capability for several legacy weapons ...

    SBIR Phase II 2022 Department of DefenseDefense Logistics Agency
  10. Domestic Manufacturing of Isostatically Molded Graphite

    SBC: Petrus J Barnard            Topic: DLA203D06

    PJB Consulting along with its collaborators, Amsted Graphite Materials, LLC and HKM Consulting LLC will reestablish domestic production capability of legacy ATJ isostatically molded graphite using a US supply chain and US manufacturing facility.  ATJ, the performance standard in solid fuel rocket nozzles and ablative technologies employed by the US Department of Defense, was last produced in 2010 ...

    SBIR Phase II 2021 Department of DefenseDefense Logistics Agency
US Flag An Official Website of the United States Government