You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
A compact, modular treatment system for non-potable re-use of residential and commercial greywater
SBC: Triangle Environmental Health Initiative LLC Topic: 1AA 40% shortfall in the global freshwater supply is expected by 2030, which makes using potable water forall household applications unsustainable. Using safe, non-potable alternative water sources for usesincluding toilet flushing, irrigation, and laundry can significantly reduce the stress on the potable watersupply.Our system supports the effort to conserve potable water by offering a product tha ...
SBIR Phase II 2023 Environmental Protection Agency -
SprayCast: Mitigating Pesticide Drift through High Resolution Forecasting, Modeling, and Optimization
SBC: GEOMETRIC DATA ANALYTICS INC. Topic: 5BOff target pesticide spray drift is an economically and environmentally significant problem. Off target drift can damage susceptible crops, orchards, and apiaries, induce herbicide resistant weed development, damage native pollinator habitats, create human-health related pesticide exposure hazards, and create social and legal strife as a result of adjudicating exposure incidents. SprayCast uses ma ...
SBIR Phase II 2023 Environmental Protection Agency -
Qualification of Aircraft Accelerometer NSN 6610-00-151-6684 & Torque Motor NSN 6105-01-326-8652
SBC: Kaney Aerospace, Inc. Topic: DLA213001The objective of this Phase II SBIR proposal is to continue the design and qualification efforts for a single-axis accelerometer (NSN 6610-00-151-6684) and perform detailed design and qualification activities for a Torque Motor (NSN 6105-01-326-8652). During Phase II, Kaney will utilize in-house manufacturing and analysis capabilities to produce drawings and manufacturing/qualification plans for t ...
SBIR Phase II 2023 Department of DefenseDefense Logistics Agency -
REPLACING PLASTIC WITH BIODEGRADABLE PACKGING IN FOOD SERVICE
SBC: Biomass Energy Systems, Inc. Topic: DLA211003This proposal follows the DLA SBIR Phase 1 Contract SP4701-21-P-0075. It seeks resources to move to Phase 2 so that the lessons learned and data developed in Phase 1 will further expand on the solution, including the field demonstration for replacing the plastic packaging in food service with the biodegradable Cellulosic Bio-Polymer (CBP) packaging to address military needs. Phase 1 was a great le ...
SBIR Phase II 2023 Department of DefenseDefense Logistics Agency -
Dear Smart Girl: Game Based STEM Career Exploration For Elementary Aged Girls
SBC: SMART GIRLS HQ LLC Topic: 91990023R0016Not available
SBIR Phase II 2023 Department of EducationInstitute of Education Sciences -
Reverse Engineering the Legacy Technology Transferred from the EOM- GASKET
SBC: AMERICAN ENERGY TECHNOLOGIES CO Topic: DLA202001The project focuses on supporting the US Navy’s fleet of critical assets containing components that are either no longer readily available or produced by the US Government molding shops at high cost. American Energy Technologies Co. (AETC) of Arlington Heights, Illinois, will re-design, modernize, and manufacture several of these parts in-house by reverse-engineering the legacy technology transf ...
SBIR Phase II 2022 Department of DefenseDefense Logistics Agency -
Zero-Waste (ZeWa) water and energy recovery system
SBC: Triangle Environmental Health Initiative LLC Topic: 1BThe Zero-Waste (ZeWa) system is an onsite black- and greywater treatment technology that maximizes the chemical energy potential contained in wastewater to produce zero-waste and three valuable reuse output streams: A) clean water for non-potable reuse, B) concentrated fertilizer for local nutrient supply, and C) Class A biosolids for local soil amendment. Over the course of Phase I, a lab-scale Z ...
SBIR Phase II 2022 Environmental Protection Agency -
SEL Quest Digital Platform to Modernize and Advance Assessment of Student Social Emotional Compentencies
SBC: XSEL LABS INC Topic: 91990022R0005Not available
SBIR Phase II 2022 Department of EducationInstitute of Education Sciences -
MULTI NSN PACKAGE
SBC: AMG ENGINEERING AND MACHINING, INC. Topic: DLA202001The primary objective of this Phase II proposal is to perform the tasks necessary to develop TDP’s via RE techniques and SAR packages to maintain these critical components to meet the needs of our Warfighters. The overall objective of this effort is to improve product availability for current and legacy weapons systems, provide competition for reduced lead times and costs, and address lifecycle ...
SBIR Phase II 2022 Department of DefenseDefense Logistics Agency -
Qualification of Aircraft Current Transformer Assembly
SBC: Kaney Aerospace, Inc. Topic: DLA203001The focus of this SBIR project is to design, develop and deliver a manufacturable current transformer to replace the obsolete legacy transformer that is currently in use in the B-52. During the Phase I and Phase I Option periods of the project, Kaney successfully reverse-engineered the legacy transformer and designed and built a demonstration replacement transformer to meet form, fit and function ...
SBIR Phase II 2022 Department of DefenseDefense Logistics Agency