You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Qualification of Aircraft Accelerometer NSN 6610-00-151-6684 & Torque Motor NSN 6105-01-326-8652

    SBC: Kaney Aerospace, Inc.            Topic: DLA213001

    The objective of this Phase II SBIR proposal is to continue the design and qualification efforts for a single-axis accelerometer (NSN 6610-00-151-6684) and perform detailed design and qualification activities for a Torque Motor (NSN 6105-01-326-8652). During Phase II, Kaney will utilize in-house manufacturing and analysis capabilities to produce drawings and manufacturing/qualification plans for t ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  2. FlyBall

    SBC: ALLUVIONIC INC.            Topic: DLA222002

    To meet the Defense Logistics Agency’s need for new and qualified sources of technology that will improve products for electrified systems in military and commercial aircraft, Alluvionic proposes a non-chemical battery, electric storage technology named FlyBall. This research will analyze how a disruptive mechanical kinetic energy storage feature set, such as FlyBall’s, would enable multiple e ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  3. ADVANCED RECOVERY AND REUSE TECHNOLOGY OF METAL POWDER FOR HIGH PART QUALITY IN ADDITIVE MANUFACTURING

    SBC: Solve Technology and Research, Inc.            Topic: DLA211005

    The proposed innovation delivers a product quality assurance approach that integrates an automated particle shape, size and color measurement tool with a machine learning architecture, that enables use of recycled powder without compromising fatigue life. The machine learning algorithm consists of a two-fold module – first, imaging the particle size, shape and color and correlate to the recycled ...

    SBIR Phase II 2022 Department of DefenseDefense Logistics Agency
  4. REPLACING PLASTIC WITH BIODEGRADABLE PACKGING IN FOOD SERVICE

    SBC: Biomass Energy Systems, Inc.            Topic: DLA211003

    This proposal follows the DLA SBIR Phase 1 Contract SP4701-21-P-0075. It seeks resources to move to Phase 2 so that the lessons learned and data developed in Phase 1 will further expand on the solution, including the field demonstration for replacing the plastic packaging in food service with the biodegradable Cellulosic Bio-Polymer (CBP) packaging to address military needs. Phase 1 was a great le ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  5. DLA212-001_Check Valve_SBIR_Phase II

    SBC: SINTAVIA, LLC            Topic: DLA212001

    SNVY has requested its supplier base to produce three copies of the referenced 8-inch stainless steel swing check valve body using LPBF AM technology.  Successful component fabrication of the item, named the 748 Body, in 316L Stainless Steel and satisfactory testing of material specimens (and component testing) will support qualification of the machine and procedure. Witness specimens will be fab ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  6. Qualification of Aircraft Current Transformer Assembly

    SBC: Kaney Aerospace, Inc.            Topic: DLA203001

    The focus of this SBIR project is to design, develop and deliver a manufacturable current transformer to replace the obsolete legacy transformer that is currently in use in the B-52. During the Phase I and Phase I Option periods of the project, Kaney successfully reverse-engineered the legacy transformer and designed and built a demonstration replacement transformer to meet form, fit and function ...

    SBIR Phase II 2022 Department of DefenseDefense Logistics Agency
  7. Source Approval Request (SAR) Package and Development Plan for Radio Cable Assembly NSN 5995-11-959-918

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 5995-01-195-9918, a Radio Cable Assembly for the B-1 platform. During Phase I, Kaney will utilize our in-house manufacturing and analysis capabilities to develop Kaney drawings and a manufacturing/qualification plan for this part. Kaney has extensive domain knowledge and capabilities rela ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  8. Source Approval Request (SAR) Package and Development Plan for Generator Rack NSN 6110-10-733-343

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 6110-01-073-3343, a Generator Rack for the C-130 platform. During Phase I, Kaney will utilize our in-house manufacturing and analysis capabilities to develop Kaney drawings and a manufacturing/qualification plan for this part. Kaney has extensive domain knowledge and capabilities related ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  9. Source Approval Request (SAR) Package and Development Plan for Battery Connector Assembly NSN 6150-01-629-3728

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 6150-01-629-3728, a Battery Connector Assembly. This battery connector assembly is out of stock at two different suppliers (but available at a third supplier, please see below in Figure 6-1), and the NSN pertains to F-15C and F-15D based platforms including variants currently flown by some ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  10. Auxiliary Power Supply for Aerospace Hydraulic Systems

    SBC: Kaney Aerospace, Inc.            Topic: DLA203001

    The Defense Logistics Agency (DLA) and the United States Air Force (USAF) are interested in a new design that overcomes obsolescence and repair issues associated with Auxiliary Power Supply (APS) units used in aerospace hydraulic systems. The need for alternative suppliers for aftermarket and obsolete components is critical to maintaining mission readiness and capability for several legacy weapons ...

    SBIR Phase II 2022 Department of DefenseDefense Logistics Agency
US Flag An Official Website of the United States Government