You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Development of a Standardization Method for Isotopic Tracing of Fugitive Sources of Methane in Atmospheric Gas Mixtures using 14C,?13C, and?2H.
SBC: BETA ANALYTIC, INC. Topic: 2CThe Small Business Innovation Research Phase I project will develop new standardization protocols and methodology for preconcentration, preparative-scale separation, and catalytic conversion of CH4 contained in mixtures of atmospheric gases for carbon-14 (14CCH4), carbon-13 (?13CCH4), and hydrogen-2 (?2HCH4) isotopic tracing. The approach addresses challenges with safely performing gas conversion ...
SBIR Phase I 2023 Environmental Protection Agency -
Remote sensing of fugitive methane using retroreflector-based Differential Laser Absorption Spectroscopy (DLAS) system on a UAV pair
SBC: CENSYS TECHNOLOGIES CORPORATION Topic: 2CMethane is one of the most potent greenhouse gases in our atmosphere, with various anthropogenic factors increasing its prevalence. Methane has 28 times greater heating capacity than carbon dioxide and its atmospheric concentration has increased roughly from 800 parts-per-billion (ppb) in the early 1900s to an alarming 1800 ppb in 2016. With approximately 3.2 million abandoned wells in the US, mit ...
SBIR Phase I 2023 Environmental Protection Agency -
Monitoring network for methane emissions
SBC: MESA PHOTONICS LLC Topic: 2CMethane (CH4) is the second most important greenhouse gas after carbon dioxide (CO2). Human activity related radiative forcing by methane accounts for about half of that caused by CO2. In the U.S., the largest industrial source of CH4 is oil and gas systems. Fugitive sources are often identified as potentially large sources of CH4 emissions; however, multiple measurement challenges inhibit more co ...
SBIR Phase I 2023 Environmental Protection Agency -
FlyBall
SBC: ALLUVIONIC INC. Topic: DLA222002To meet the Defense Logistics Agency’s need for new and qualified sources of technology that will improve products for electrified systems in military and commercial aircraft, Alluvionic proposes a non-chemical battery, electric storage technology named FlyBall. This research will analyze how a disruptive mechanical kinetic energy storage feature set, such as FlyBall’s, would enable multiple e ...
SBIR Phase II 2023 Department of DefenseDefense Logistics Agency -
DLA212-001_Check Valve_SBIR_Phase II
SBC: SINTAVIA, LLC Topic: DLA212001SNVY has requested its supplier base to produce three copies of the referenced 8-inch stainless steel swing check valve body using LPBF AM technology. Successful component fabrication of the item, named the 748 Body, in 316L Stainless Steel and satisfactory testing of material specimens (and component testing) will support qualification of the machine and procedure. Witness specimens will be fab ...
SBIR Phase II 2023 Department of DefenseDefense Logistics Agency -
Qualification of Aircraft Accelerometer NSN 6610-00-151-6684 & Torque Motor NSN 6105-01-326-8652
SBC: Kaney Aerospace, Inc. Topic: DLA213001The objective of this Phase II SBIR proposal is to continue the design and qualification efforts for a single-axis accelerometer (NSN 6610-00-151-6684) and perform detailed design and qualification activities for a Torque Motor (NSN 6105-01-326-8652). During Phase II, Kaney will utilize in-house manufacturing and analysis capabilities to produce drawings and manufacturing/qualification plans for t ...
SBIR Phase II 2023 Department of DefenseDefense Logistics Agency -
Source Approval Request (SAR) Package and Development Plan for Battery Connector Assembly NSN 6150-01-629-3728
SBC: Kaney Aerospace, Inc. Topic: DLA231001Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 6150-01-629-3728, a Battery Connector Assembly. This battery connector assembly is out of stock at two different suppliers (but available at a third supplier, please see below in Figure 6-1), and the NSN pertains to F-15C and F-15D based platforms including variants currently flown by some ...
SBIR Phase I 2023 Department of DefenseDefense Logistics Agency -
Source Approval Request (SAR) Package and Development Plan for Radio Cable Assembly NSN 5995-11-959-918
SBC: Kaney Aerospace, Inc. Topic: DLA231001Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 5995-01-195-9918, a Radio Cable Assembly for the B-1 platform. During Phase I, Kaney will utilize our in-house manufacturing and analysis capabilities to develop Kaney drawings and a manufacturing/qualification plan for this part. Kaney has extensive domain knowledge and capabilities rela ...
SBIR Phase I 2023 Department of DefenseDefense Logistics Agency -
Source Approval Request (SAR) Package and Development Plan for Generator Rack NSN 6110-10-733-343
SBC: Kaney Aerospace, Inc. Topic: DLA231001Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 6110-01-073-3343, a Generator Rack for the C-130 platform. During Phase I, Kaney will utilize our in-house manufacturing and analysis capabilities to develop Kaney drawings and a manufacturing/qualification plan for this part. Kaney has extensive domain knowledge and capabilities related ...
SBIR Phase I 2023 Department of DefenseDefense Logistics Agency -
REPLACING PLASTIC WITH BIODEGRADABLE PACKGING IN FOOD SERVICE
SBC: Biomass Energy Systems, Inc. Topic: DLA211003This proposal follows the DLA SBIR Phase 1 Contract SP4701-21-P-0075. It seeks resources to move to Phase 2 so that the lessons learned and data developed in Phase 1 will further expand on the solution, including the field demonstration for replacing the plastic packaging in food service with the biodegradable Cellulosic Bio-Polymer (CBP) packaging to address military needs. Phase 1 was a great le ...
SBIR Phase II 2023 Department of DefenseDefense Logistics Agency