You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Materials Recovery Platform: A geospatial software approach to the circular economy

    SBC: CAN I RECYCLE THIS INC            Topic: 4B

    The Can I Recycle This (CIRT) Materials Recovery Platform is a tech-enabled circular economy solution that aggregates decentralized waste, recycling, recovery and reuse schemes across the U.S. MSW recycling system currently faces a number of challenges, including confusion about what materials can be recycled, recycling infrastructure that has not kept pace with today's diverse and changing waste ...

    SBIR Phase I 2023 Environmental Protection Agency
  2. Novel Mold Technology for Scaled Manufacturing of High Performance Composite Hypersonic Thermal Protection Systems

    SBC: Atomic-6, Inc.            Topic: DLA23A003

    The Defense Department is working hard on developing both hypersonic offensive and defensive capabilities. But in the immediate future, one of the most important areas to be developed is increasing the capacity at which such systems can be produced, said Gillian Bussey, director of the Joint Hypersonics Transition Office.                Atomic-6 was founded to solve a problem that the ...

    STTR Phase I 2023 Department of DefenseDefense Logistics Agency
  3. Innovative Approaches for the Electrification of Aircraft-Magnetic Braking Systems for Navy Aircraft

    SBC: INDUCTIVE VENTURES, INC.            Topic: DLA222002

    This proposal provides a detailed account of our Team’s previous work through the Magnetic Braking and Electric Taxiing Program and provides a pathway for building and testing a brake system that has been designed and developed for the F-35 Lightening II aircraft platform.  Having competed the effort of designing the magnetic braking and electric taxiing system for a commercial Airbus A320, C-1 ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  4. Innovative Approaches for the Electrification of Aircraft-Magnetic Braking Systems for Air Force Aircraft

    SBC: INDUCTIVE VENTURES, INC.            Topic: DLA222002

    This proposal provides a detailed account of our Team’s previous work through the Magnetic Braking and Electric Taxiing Program and provides a pathway for building and testing a brake system that has been designed and developed for the F-16 aircraft platform.  Having competed the effort of designing the magnetic braking and electric taxiing system for a commercial Airbus A320, C-17, U-2 in prev ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  5. Qualification of Aircraft Accelerometer NSN 6610-00-151-6684 & Torque Motor NSN 6105-01-326-8652

    SBC: Kaney Aerospace, Inc.            Topic: DLA213001

    The objective of this Phase II SBIR proposal is to continue the design and qualification efforts for a single-axis accelerometer (NSN 6610-00-151-6684) and perform detailed design and qualification activities for a Torque Motor (NSN 6105-01-326-8652). During Phase II, Kaney will utilize in-house manufacturing and analysis capabilities to produce drawings and manufacturing/qualification plans for t ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  6. Source Approval Request (SAR) Package and Development Plan for Battery Connector Assembly NSN 6150-01-629-3728

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 6150-01-629-3728, a Battery Connector Assembly. This battery connector assembly is out of stock at two different suppliers (but available at a third supplier, please see below in Figure 6-1), and the NSN pertains to F-15C and F-15D based platforms including variants currently flown by some ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  7. Source Approval Request (SAR) Package and Development Plan for Radio Cable Assembly NSN 5995-11-959-918

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 5995-01-195-9918, a Radio Cable Assembly for the B-1 platform. During Phase I, Kaney will utilize our in-house manufacturing and analysis capabilities to develop Kaney drawings and a manufacturing/qualification plan for this part. Kaney has extensive domain knowledge and capabilities rela ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  8. Source Approval Request (SAR) Package and Development Plan for Generator Rack NSN 6110-10-733-343

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 6110-01-073-3343, a Generator Rack for the C-130 platform. During Phase I, Kaney will utilize our in-house manufacturing and analysis capabilities to develop Kaney drawings and a manufacturing/qualification plan for this part. Kaney has extensive domain knowledge and capabilities related ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  9. REPLACING PLASTIC WITH BIODEGRADABLE PACKGING IN FOOD SERVICE

    SBC: Biomass Energy Systems, Inc.            Topic: DLA211003

    This proposal follows the DLA SBIR Phase 1 Contract SP4701-21-P-0075. It seeks resources to move to Phase 2 so that the lessons learned and data developed in Phase 1 will further expand on the solution, including the field demonstration for replacing the plastic packaging in food service with the biodegradable Cellulosic Bio-Polymer (CBP) packaging to address military needs. Phase 1 was a great le ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  10. LocatorX Automated Inventory Tracking for the Defense Logistics Agency

    SBC: LOCATORX INC            Topic: DLA232005

    LocatorX offers a broad range of capabilities built on the core of its LXConnect™ Application Server, an open Internet of Things (IoT) platform that encompasses many industry 4.0 concepts. From the digitization of complex, industrial, and material-focused processes often found in manufacturing and supply chain industries, a modern, API-driven interface maximizing interoperability with current an ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
US Flag An Official Website of the United States Government