You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Qualification of Aircraft Accelerometer NSN 6610-00-151-6684 & Torque Motor NSN 6105-01-326-8652

    SBC: Kaney Aerospace, Inc.            Topic: DLA213001

    The objective of this Phase II SBIR proposal is to continue the design and qualification efforts for a single-axis accelerometer (NSN 6610-00-151-6684) and perform detailed design and qualification activities for a Torque Motor (NSN 6105-01-326-8652). During Phase II, Kaney will utilize in-house manufacturing and analysis capabilities to produce drawings and manufacturing/qualification plans for t ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  2. REPLACING PLASTIC WITH BIODEGRADABLE PACKGING IN FOOD SERVICE

    SBC: Biomass Energy Systems, Inc.            Topic: DLA211003

    This proposal follows the DLA SBIR Phase 1 Contract SP4701-21-P-0075. It seeks resources to move to Phase 2 so that the lessons learned and data developed in Phase 1 will further expand on the solution, including the field demonstration for replacing the plastic packaging in food service with the biodegradable Cellulosic Bio-Polymer (CBP) packaging to address military needs. Phase 1 was a great le ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  3. Reverse Engineering the Legacy Technology Transferred from the EOM- GASKET

    SBC: AMERICAN ENERGY TECHNOLOGIES CO            Topic: DLA202001

    The project focuses on supporting the US Navy’s fleet of critical assets containing components that are either no longer readily available or produced by the US Government molding shops at high cost. American Energy Technologies Co. (AETC) of Arlington Heights, Illinois, will re-design, modernize, and manufacture several of these parts in-house by reverse-engineering the legacy technology transf ...

    SBIR Phase II 2022 Department of DefenseDefense Logistics Agency
  4. MULTI NSN PACKAGE

    SBC: AMG ENGINEERING AND MACHINING, INC.            Topic: DLA202001

    The primary objective of this Phase II proposal is to perform the tasks necessary to develop TDP’s via RE techniques and SAR packages to maintain these critical components to meet the needs of our Warfighters. The overall objective of this effort is to improve product availability for current and legacy weapons systems, provide competition for reduced lead times and costs, and address lifecycle ...

    SBIR Phase II 2022 Department of DefenseDefense Logistics Agency
  5. Qualification of Aircraft Current Transformer Assembly

    SBC: Kaney Aerospace, Inc.            Topic: DLA203001

    The focus of this SBIR project is to design, develop and deliver a manufacturable current transformer to replace the obsolete legacy transformer that is currently in use in the B-52. During the Phase I and Phase I Option periods of the project, Kaney successfully reverse-engineered the legacy transformer and designed and built a demonstration replacement transformer to meet form, fit and function ...

    SBIR Phase II 2022 Department of DefenseDefense Logistics Agency
  6. Auxiliary Power Supply for Aerospace Hydraulic Systems

    SBC: Kaney Aerospace, Inc.            Topic: DLA203001

    The Defense Logistics Agency (DLA) and the United States Air Force (USAF) are interested in a new design that overcomes obsolescence and repair issues associated with Auxiliary Power Supply (APS) units used in aerospace hydraulic systems. The need for alternative suppliers for aftermarket and obsolete components is critical to maintaining mission readiness and capability for several legacy weapons ...

    SBIR Phase II 2022 Department of DefenseDefense Logistics Agency
  7. Improved Propellers for Light Torpedo

    SBC: CANDENT TECHNOLOGIES INCORPORATED            Topic: DLA202D014

    Candent Technologies is proposing to develop an improved propeller design for the light torpedo, based on analysis and verification of the current system, and applying the experience and expertise of the Candent team in order to provide a lower cost, more durable propeller set with equal or better performance than the current system, made possible by optimized blade profiles that minimize blade ca ...

    SBIR Phase II 2021 Department of DefenseDefense Logistics Agency
  8. Low Cost Carbon Fluoride Active Materials for BA-5790/U and Conformal Wearable Lithium Batteries

    SBC: AMERICAN ENERGY TECHNOLOGIES CO            Topic: DLA152001

    American Energy Technologies Co. will partner with Eagle Picher Technologies in order to develop a lean and efficient method for synthesis of Lithium battery grade carbon monofluoride (CFx). The focus of the development / prototyping work will be on continuous processing, application of domestic raw materials and use of modern material de-aggregation techniques for particles of the end-product. Th ...

    SBIR Phase II 2020 Department of DefenseDefense Logistics Agency
  9. Low Cost Carbon Fluoride Active Materials for BA-5790/U Lithium Batteries

    SBC: AMERICAN ENERGY TECHNOLOGIES CO            Topic: DLA152001

    American Energy Technologies Co. will partner with Eagle Picher Technologies in order to develop a lean and efficient method for synthesis of Lithium battery grade carbon monofluoride (CFx). The focus of the development / prototyping work will be on continuous processing, application of domestic raw materials and use of modern material de-aggregation techniques for particles of the end-product. Pr ...

    SBIR Phase II 2017 Department of DefenseDefense Logistics Agency
  10. Low Cost, Efficient Microchannel Plasma Ozone System for Point of Use Water Treatment

    SBC: EP Purification, Inc.            Topic: A

    A team at EP Purification has performed research for the development and commercialization of low-cost microchannel plasma reactor modules capable of efficiently producing ozone for water treatment and other environmental applications in a slim form factor and size. The conservation of water resources for human consumption is a growing national priority. Ozone is a unique purification agent as it ...

    SBIR Phase II 2014 Environmental Protection Agency
US Flag An Official Website of the United States Government