You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Rapid, Field-Deployable Water Sampling Device to Facilitate On-Site Total PFAS Measurement

    SBC: FOREVER ANALYTICAL SERVICES, INC.            Topic: 1D

    a. Innovativeness of the proposed technology Forever Analytical Services (FAS) has developed particle-induced gamma-ray emissions (PIGE) spectroscopy for the high-throughput screening of per- and poly-fluoroalkyl substances (PFAS) in water. This proposal seeks to extend the utility of this technique to the field by developing a field-deployable solid phase extraction (SPE) device containing a filt ...

    SBIR Phase I 2023 Environmental Protection Agency
  2. Component Optimization for Improved Refrigerant Recovery

    SBC: Optimized Thermal Systems, Inc.            Topic: 2E

    Refrigerants are known to have harmful impacts on the environment. It is essential that those that are particularly harmful with a high global warming potential (GWP) are recovered correctly for proper recycling or disposal. Unfortunately, all too often, refrigerant is not properly recovered either due to system failure, technician error, or unincentivized industry practice. With implementation of ...

    SBIR Phase I 2023 Environmental Protection Agency
  3. Qualification of Aircraft Accelerometer NSN 6610-00-151-6684 & Torque Motor NSN 6105-01-326-8652

    SBC: Kaney Aerospace, Inc.            Topic: DLA213001

    The objective of this Phase II SBIR proposal is to continue the design and qualification efforts for a single-axis accelerometer (NSN 6610-00-151-6684) and perform detailed design and qualification activities for a Torque Motor (NSN 6105-01-326-8652). During Phase II, Kaney will utilize in-house manufacturing and analysis capabilities to produce drawings and manufacturing/qualification plans for t ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  4. Source Approval Request (SAR) Package and Development Plan for Battery Connector Assembly NSN 6150-01-629-3728

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 6150-01-629-3728, a Battery Connector Assembly. This battery connector assembly is out of stock at two different suppliers (but available at a third supplier, please see below in Figure 6-1), and the NSN pertains to F-15C and F-15D based platforms including variants currently flown by some ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  5. Source Approval Request (SAR) Package and Development Plan for Radio Cable Assembly NSN 5995-11-959-918

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 5995-01-195-9918, a Radio Cable Assembly for the B-1 platform. During Phase I, Kaney will utilize our in-house manufacturing and analysis capabilities to develop Kaney drawings and a manufacturing/qualification plan for this part. Kaney has extensive domain knowledge and capabilities rela ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  6. Source Approval Request (SAR) Package and Development Plan for Generator Rack NSN 6110-10-733-343

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 6110-01-073-3343, a Generator Rack for the C-130 platform. During Phase I, Kaney will utilize our in-house manufacturing and analysis capabilities to develop Kaney drawings and a manufacturing/qualification plan for this part. Kaney has extensive domain knowledge and capabilities related ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  7. Production of Pure Magnesium with Green technology from ore Materials-Dolomite and Magnesite

    SBC: CROWN MAGNESIUM INC            Topic: DLA232003

    Magnesium metal, sometimes referred to as the “Green Metal” is important for defense and industrial use, as it is the lightest of all the structural and engineering metals. Magnesium also has superior mechanical properties such as high dampening capacity, heat dissipation, and shock absorbing capacity. Magnesium is 100% recyclable. Due to these factors, magnesium metal is in high demand in the ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  8. REPLACING PLASTIC WITH BIODEGRADABLE PACKGING IN FOOD SERVICE

    SBC: Biomass Energy Systems, Inc.            Topic: DLA211003

    This proposal follows the DLA SBIR Phase 1 Contract SP4701-21-P-0075. It seeks resources to move to Phase 2 so that the lessons learned and data developed in Phase 1 will further expand on the solution, including the field demonstration for replacing the plastic packaging in food service with the biodegradable Cellulosic Bio-Polymer (CBP) packaging to address military needs. Phase 1 was a great le ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  9. Source Approval Request (SAR) Package and Development Plan for Accelerometer NSN 6610-00-151-6684

    SBC: Kaney Aerospace, Inc.            Topic: DLA213001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for NSN 6610-00-151-6684, a high-reliability accelerometer for flight data recording systems onboard the B-1 platform. Due to the critical nature of the component, our SAR will be elevated to an engineering services activity (ESA). Kaney has extensive domain knowledge and capabilities related to this part. Through our re ...

    SBIR Phase I 2022 Department of DefenseDefense Logistics Agency
  10. Reverse Engineering the Legacy Technology Transferred from the EOM- GASKET

    SBC: AMERICAN ENERGY TECHNOLOGIES CO            Topic: DLA202001

    The project focuses on supporting the US Navy’s fleet of critical assets containing components that are either no longer readily available or produced by the US Government molding shops at high cost. American Energy Technologies Co. (AETC) of Arlington Heights, Illinois, will re-design, modernize, and manufacture several of these parts in-house by reverse-engineering the legacy technology transf ...

    SBIR Phase II 2022 Department of DefenseDefense Logistics Agency
US Flag An Official Website of the United States Government