You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Design and Alpha Test of In-water Collection and Removal of Floating Debris System

    SBC: D & D Products Incorporated            Topic: 1C

    D&D Products Inc. will design and develop an in-situ floating debris capture device. The device will be located at the edge of a stream, canal or similar waterbody. Floating booms will be attached to the device, and the waterway current will guide debris along the booms into the gathering head. The gathering head will direct debris into the hopper and feed it onto a conveying mechanism. The convey ...

    SBIR Phase I 2023 Environmental Protection Agency
  2. Qualification of Aircraft Accelerometer NSN 6610-00-151-6684 & Torque Motor NSN 6105-01-326-8652

    SBC: Kaney Aerospace, Inc.            Topic: DLA213001

    The objective of this Phase II SBIR proposal is to continue the design and qualification efforts for a single-axis accelerometer (NSN 6610-00-151-6684) and perform detailed design and qualification activities for a Torque Motor (NSN 6105-01-326-8652). During Phase II, Kaney will utilize in-house manufacturing and analysis capabilities to produce drawings and manufacturing/qualification plans for t ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  3. Source Approval Request (SAR) Package and Development Plan for Battery Connector Assembly NSN 6150-01-629-3728

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 6150-01-629-3728, a Battery Connector Assembly. This battery connector assembly is out of stock at two different suppliers (but available at a third supplier, please see below in Figure 6-1), and the NSN pertains to F-15C and F-15D based platforms including variants currently flown by some ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  4. Source Approval Request (SAR) Package and Development Plan for Radio Cable Assembly NSN 5995-11-959-918

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 5995-01-195-9918, a Radio Cable Assembly for the B-1 platform. During Phase I, Kaney will utilize our in-house manufacturing and analysis capabilities to develop Kaney drawings and a manufacturing/qualification plan for this part. Kaney has extensive domain knowledge and capabilities rela ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  5. Source Approval Request (SAR) Package and Development Plan for Generator Rack NSN 6110-10-733-343

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 6110-01-073-3343, a Generator Rack for the C-130 platform. During Phase I, Kaney will utilize our in-house manufacturing and analysis capabilities to develop Kaney drawings and a manufacturing/qualification plan for this part. Kaney has extensive domain knowledge and capabilities related ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  6. REPLACING PLASTIC WITH BIODEGRADABLE PACKGING IN FOOD SERVICE

    SBC: Biomass Energy Systems, Inc.            Topic: DLA211003

    This proposal follows the DLA SBIR Phase 1 Contract SP4701-21-P-0075. It seeks resources to move to Phase 2 so that the lessons learned and data developed in Phase 1 will further expand on the solution, including the field demonstration for replacing the plastic packaging in food service with the biodegradable Cellulosic Bio-Polymer (CBP) packaging to address military needs. Phase 1 was a great le ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  7. Source Approval Request (SAR) Package and Development Plan for Accelerometer NSN 6610-00-151-6684

    SBC: Kaney Aerospace, Inc.            Topic: DLA213001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for NSN 6610-00-151-6684, a high-reliability accelerometer for flight data recording systems onboard the B-1 platform. Due to the critical nature of the component, our SAR will be elevated to an engineering services activity (ESA). Kaney has extensive domain knowledge and capabilities related to this part. Through our re ...

    SBIR Phase I 2022 Department of DefenseDefense Logistics Agency
  8. Reverse Engineering the Legacy Technology Transferred from the EOM- GASKET

    SBC: AMERICAN ENERGY TECHNOLOGIES CO            Topic: DLA202001

    The project focuses on supporting the US Navy’s fleet of critical assets containing components that are either no longer readily available or produced by the US Government molding shops at high cost. American Energy Technologies Co. (AETC) of Arlington Heights, Illinois, will re-design, modernize, and manufacture several of these parts in-house by reverse-engineering the legacy technology transf ...

    SBIR Phase II 2022 Department of DefenseDefense Logistics Agency
  9. Improved Processing For Direct Reduction of Cerium Precursors for the Production of Al-Ce Alloys

    SBC: ECK INDUSTRIES, INC.            Topic: DLA202008

    This project seeks to build on a Phase 1 effort to reduce the cost and supply barriers to the implementation of Al-Ce alloys in defense and commercial applications using direct reduction of cerium precursors in molten aluminum. A successful project will eliminate the need for foreign sources of cerium metal and exploit the cost differences between pure cerium and its oxide, currently a factor of t ...

    SBIR Phase II 2022 Department of DefenseDefense Logistics Agency
  10. Levaraging AxM Software Technology to Empower Material Reuse and Embodied Carbon Reporting in the Built Environment

    SBC: RHEAPLY INC            Topic: 4D

    As the single largest consumer of materials and energy use worldwide, the construction sector remains a prime target for materials reuse reform. (Krausmann et al., 2009; De Ia Rue du Can & Price, 2008). Construction and ongoing operation of the built environment extracts a significant amount of resources -- and on an ongoing basis. According to the U.S. Green Building Council (USGBC), buildings ac ...

    SBIR Phase I 2022 Environmental Protection Agency
US Flag An Official Website of the United States Government