You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. REPLACING PLASTIC WITH BIODEGRADABLE PACKGING IN FOOD SERVICE

    SBC: Biomass Energy Systems, Inc.            Topic: DLA211003

    This proposal follows the DLA SBIR Phase 1 Contract SP4701-21-P-0075. It seeks resources to move to Phase 2 so that the lessons learned and data developed in Phase 1 will further expand on the solution, including the field demonstration for replacing the plastic packaging in food service with the biodegradable Cellulosic Bio-Polymer (CBP) packaging to address military needs. Phase 1 was a great le ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  2. Accelerated Processing with Geometry-Specific Pyrolysis Heating Profiles for Production of C-C Hot Structures

    SBC: Carbon Carbon Advanced Technologies, Inc.            Topic: DLA231D07

    The highest-risk processing step in manufacturing C-CAT’s ACC material is the initial carbonization cycle, during which a C/Ph composite preform is carbonized to produce a low-density C/C part to be subsequently densified using a Polymer Infiltration and Pyrolysis (PIP) process. Though the carbonization steps of the PIP densification cycles also present a risk, it is during the initial cycle tha ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  3. Source Approval Request (SAR) Package and Development Plan for Radio Cable Assembly NSN 5995-11-959-918

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 5995-01-195-9918, a Radio Cable Assembly for the B-1 platform. During Phase I, Kaney will utilize our in-house manufacturing and analysis capabilities to develop Kaney drawings and a manufacturing/qualification plan for this part. Kaney has extensive domain knowledge and capabilities rela ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  4. Source Approval Request (SAR) Package and Development Plan for Generator Rack NSN 6110-10-733-343

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 6110-01-073-3343, a Generator Rack for the C-130 platform. During Phase I, Kaney will utilize our in-house manufacturing and analysis capabilities to develop Kaney drawings and a manufacturing/qualification plan for this part. Kaney has extensive domain knowledge and capabilities related ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  5. Qualification of Aircraft Accelerometer NSN 6610-00-151-6684 & Torque Motor NSN 6105-01-326-8652

    SBC: Kaney Aerospace, Inc.            Topic: DLA213001

    The objective of this Phase II SBIR proposal is to continue the design and qualification efforts for a single-axis accelerometer (NSN 6610-00-151-6684) and perform detailed design and qualification activities for a Torque Motor (NSN 6105-01-326-8652). During Phase II, Kaney will utilize in-house manufacturing and analysis capabilities to produce drawings and manufacturing/qualification plans for t ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  6. Source Approval Request (SAR) Package and Development Plan for Battery Connector Assembly NSN 6150-01-629-3728

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 6150-01-629-3728, a Battery Connector Assembly. This battery connector assembly is out of stock at two different suppliers (but available at a third supplier, please see below in Figure 6-1), and the NSN pertains to F-15C and F-15D based platforms including variants currently flown by some ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  7. Advanced Low Volume Semiconductor Manufacturing

    SBC: SECUREFOUNDRY INC            Topic: DLA231001

    Scope The Scope of the project exclusively pertains upon building a starting point to reconstitute a successful low volume lithography system which provides significant potential to produce cost effective and rapid prototyping of advanced microelectronics. The scope of the project is limited to the tool evaluation by producing imaging data of various shapes and patterns.  Assess and Install Mach ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  8. New Source Development for ALRE Item

    SBC: SUNBELT DESIGN & DEVELOPMENT, INC.            Topic: DLA222001

    Sunbelt proposes to expand the Small Business Manufacturer (SBM) base for Aircraft Launch & Recovery Equipment (ALRE) managed by the DLA, by becoming a qualified source for NSN 1720-01-116-8539, Parts Kit, Holdback, P/N 218334.  Sunbelt has researched all 35 NSNs associated with this topic, and this NSN is similar to parts Sunbelt has manufacturing experience with.  Sunbelt has built Holdback A ...

    SBIR Phase I 2022 Department of DefenseDefense Logistics Agency
  9. Sustainability Analysis and New Source Development for C-5 Ductwork

    SBC: SUNBELT DESIGN & DEVELOPMENT, INC.            Topic: DLA222001

    Sunbelt proposes to expand the Small Business Manufacturer (SBM) base for C-5 Ductwork items managed by the DLA.  There are currently only limited sources for these items. Sunbelt will research the manufacturing processes and materials for the subset of 12 items in the NSN list for this SBIR.  Sunbelt will develop models and drawings for the items, price the materials and processes, and determi ...

    SBIR Phase I 2022 Department of DefenseDefense Logistics Agency
  10. Reverse Engineering and New Source Development for various RPPOB Items

    SBC: SUNBELT DESIGN & DEVELOPMENT, INC.            Topic: DLA222001

    Sunbelt proposes to expand the Small Business Manufacturer (SBM) base for various items without drawings managed by the DLA. Sunbelt will leverage the DLA RPPOB program to reverse engineer sample parts. Sunbelt will research the manufacturing processes and materials for the subset of 7 items in the NSN list for this SBIR. Sunbelt will develop models and drawings for the items, price the material ...

    SBIR Phase I 2022 Department of DefenseDefense Logistics Agency
US Flag An Official Website of the United States Government