You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
REPLACING PLASTIC WITH BIODEGRADABLE PACKGING IN FOOD SERVICE
SBC: Biomass Energy Systems, Inc. Topic: DLA211003This proposal follows the DLA SBIR Phase 1 Contract SP4701-21-P-0075. It seeks resources to move to Phase 2 so that the lessons learned and data developed in Phase 1 will further expand on the solution, including the field demonstration for replacing the plastic packaging in food service with the biodegradable Cellulosic Bio-Polymer (CBP) packaging to address military needs. Phase 1 was a great le ...
SBIR Phase II 2023 Department of DefenseDefense Logistics Agency -
Accelerated Processing with Geometry-Specific Pyrolysis Heating Profiles for Production of C-C Hot Structures
SBC: Carbon Carbon Advanced Technologies, Inc. Topic: DLA231D07The highest-risk processing step in manufacturing C-CAT’s ACC material is the initial carbonization cycle, during which a C/Ph composite preform is carbonized to produce a low-density C/C part to be subsequently densified using a Polymer Infiltration and Pyrolysis (PIP) process. Though the carbonization steps of the PIP densification cycles also present a risk, it is during the initial cycle tha ...
SBIR Phase II 2023 Department of DefenseDefense Logistics Agency -
Proposed Project Title Atlantis AI Based Long Range Space Weather Prediction System
SBC: Atlantis Industries, Inc. Topic: 95To date, no realizable method of predicting the occurrence or magnitude of a Solar Energetic Particle (SEP) event has been developed. There are multiple models currently available in the Community Coordinated Modeling Center (CCMC) through Goddard Space Flight Center that attempt to provide timely and accurate event propagation (e.g.MAG4, Enlil, and SEPMOD). None of these have yet achieved the goa ...
SBIR Phase I 2023 Department of CommerceNational Oceanic and Atmospheric Administration -
AeroLite Sense: Atmospheric Aerosols and Particulates Observations from the Stratosphere
SBC: STRATOSOLUTIONS INC Topic: 91The long endurance “StratoSonde” lighter-than-air, uncrewed system combines a low-cost, 5day endurance StratoSonde supports up to 10 micro-dropsondes, which when released from the HAB, descend safely through the entire atmospheric column under a ribbon drogue while reporting observations directly back to the HAB. This project will assess the feasibility of integrating a disposable miniature ae ...
SBIR Phase I 2023 Department of CommerceNational Oceanic and Atmospheric Administration -
Source Approval Request (SAR) Package and Development Plan for Radio Cable Assembly NSN 5995-11-959-918
SBC: Kaney Aerospace, Inc. Topic: DLA231001Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 5995-01-195-9918, a Radio Cable Assembly for the B-1 platform. During Phase I, Kaney will utilize our in-house manufacturing and analysis capabilities to develop Kaney drawings and a manufacturing/qualification plan for this part. Kaney has extensive domain knowledge and capabilities rela ...
SBIR Phase I 2023 Department of DefenseDefense Logistics Agency -
Source Approval Request (SAR) Package and Development Plan for Generator Rack NSN 6110-10-733-343
SBC: Kaney Aerospace, Inc. Topic: DLA231001Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 6110-01-073-3343, a Generator Rack for the C-130 platform. During Phase I, Kaney will utilize our in-house manufacturing and analysis capabilities to develop Kaney drawings and a manufacturing/qualification plan for this part. Kaney has extensive domain knowledge and capabilities related ...
SBIR Phase I 2023 Department of DefenseDefense Logistics Agency -
Qualification of Aircraft Accelerometer NSN 6610-00-151-6684 & Torque Motor NSN 6105-01-326-8652
SBC: Kaney Aerospace, Inc. Topic: DLA213001The objective of this Phase II SBIR proposal is to continue the design and qualification efforts for a single-axis accelerometer (NSN 6610-00-151-6684) and perform detailed design and qualification activities for a Torque Motor (NSN 6105-01-326-8652). During Phase II, Kaney will utilize in-house manufacturing and analysis capabilities to produce drawings and manufacturing/qualification plans for t ...
SBIR Phase II 2023 Department of DefenseDefense Logistics Agency -
Source Approval Request (SAR) Package and Development Plan for Battery Connector Assembly NSN 6150-01-629-3728
SBC: Kaney Aerospace, Inc. Topic: DLA231001Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 6150-01-629-3728, a Battery Connector Assembly. This battery connector assembly is out of stock at two different suppliers (but available at a third supplier, please see below in Figure 6-1), and the NSN pertains to F-15C and F-15D based platforms including variants currently flown by some ...
SBIR Phase I 2023 Department of DefenseDefense Logistics Agency -
Accelerated in-storage analysis of multi-dimensional data
SBC: AIRMETTLE INC Topic: 91AirMettle Inc. is transforming big data analytics for NOAA and the broader scientific community with a real-time smart data lake solution. Our innovative method utilizes massively parallel in-storage data processing within a versatile software defined storage framework, deployable on-premises or as a cloudbased service. Building upon our successful NOAA SBIR Phase I project, we strive to improve t ...
SBIR Phase II 2023 Department of CommerceNational Oceanic and Atmospheric Administration -
Advanced Low Volume Semiconductor Manufacturing
SBC: SECUREFOUNDRY INC Topic: DLA231001Scope The Scope of the project exclusively pertains upon building a starting point to reconstitute a successful low volume lithography system which provides significant potential to produce cost effective and rapid prototyping of advanced microelectronics. The scope of the project is limited to the tool evaluation by producing imaging data of various shapes and patterns. Assess and Install Mach ...
SBIR Phase I 2023 Department of DefenseDefense Logistics Agency