You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Accelerated Processing with Geometry-Specific Pyrolysis Heating Profiles for Production of C-C Hot Structures
SBC: Carbon Carbon Advanced Technologies, Inc. Topic: DLA231D07The highest-risk processing step in manufacturing C-CAT’s ACC material is the initial carbonization cycle, during which a C/Ph composite preform is carbonized to produce a low-density C/C part to be subsequently densified using a Polymer Infiltration and Pyrolysis (PIP) process. Though the carbonization steps of the PIP densification cycles also present a risk, it is during the initial cycle tha ...
SBIR Phase II 2023 Department of DefenseDefense Logistics Agency -
Qualification of Aircraft Accelerometer NSN 6610-00-151-6684 & Torque Motor NSN 6105-01-326-8652
SBC: Kaney Aerospace, Inc. Topic: DLA213001The objective of this Phase II SBIR proposal is to continue the design and qualification efforts for a single-axis accelerometer (NSN 6610-00-151-6684) and perform detailed design and qualification activities for a Torque Motor (NSN 6105-01-326-8652). During Phase II, Kaney will utilize in-house manufacturing and analysis capabilities to produce drawings and manufacturing/qualification plans for t ...
SBIR Phase II 2023 Department of DefenseDefense Logistics Agency -
Source Approval Request (SAR) Package and Development Plan for Battery Connector Assembly NSN 6150-01-629-3728
SBC: Kaney Aerospace, Inc. Topic: DLA231001Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 6150-01-629-3728, a Battery Connector Assembly. This battery connector assembly is out of stock at two different suppliers (but available at a third supplier, please see below in Figure 6-1), and the NSN pertains to F-15C and F-15D based platforms including variants currently flown by some ...
SBIR Phase I 2023 Department of DefenseDefense Logistics Agency -
Source Approval Request (SAR) Package and Development Plan for Radio Cable Assembly NSN 5995-11-959-918
SBC: Kaney Aerospace, Inc. Topic: DLA231001Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 5995-01-195-9918, a Radio Cable Assembly for the B-1 platform. During Phase I, Kaney will utilize our in-house manufacturing and analysis capabilities to develop Kaney drawings and a manufacturing/qualification plan for this part. Kaney has extensive domain knowledge and capabilities rela ...
SBIR Phase I 2023 Department of DefenseDefense Logistics Agency -
Source Approval Request (SAR) Package and Development Plan for Generator Rack NSN 6110-10-733-343
SBC: Kaney Aerospace, Inc. Topic: DLA231001Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 6110-01-073-3343, a Generator Rack for the C-130 platform. During Phase I, Kaney will utilize our in-house manufacturing and analysis capabilities to develop Kaney drawings and a manufacturing/qualification plan for this part. Kaney has extensive domain knowledge and capabilities related ...
SBIR Phase I 2023 Department of DefenseDefense Logistics Agency -
REPLACING PLASTIC WITH BIODEGRADABLE PACKGING IN FOOD SERVICE
SBC: Biomass Energy Systems, Inc. Topic: DLA211003This proposal follows the DLA SBIR Phase 1 Contract SP4701-21-P-0075. It seeks resources to move to Phase 2 so that the lessons learned and data developed in Phase 1 will further expand on the solution, including the field demonstration for replacing the plastic packaging in food service with the biodegradable Cellulosic Bio-Polymer (CBP) packaging to address military needs. Phase 1 was a great le ...
SBIR Phase II 2023 Department of DefenseDefense Logistics Agency -
High efficiency vertical photoconductive semiconductor switches (PCSS)
SBC: NANOHMICS INC Topic: DMEA231005Vertical Photoconductive Semiconductor Switches can be designed to support numerous filaments that simultaneously conduct current. A two dimensional array of current channels can be lithographically patterned on the surface of a substrate to achieve significant power scaling. One of the challenged is coupling the optical trigger signal efficiently into the filament apertures. Nanohmics will desig ...
SBIR Phase I 2023 Department of DefenseDefense Microelectronics Activity -
High Voltage Package Encapsulants
SBC: TEXAS RESEARCH INSTITUTE , AUSTIN, INC. Topic: DMEA231003With significant strides being made on wide bandgap (WBG) semiconductor devices for high-power electronics, there is a concurrent need for packaging encapsulants with reliable long-term performance in a more rigorous operational environment. The WBG power devices are set to be fielded in electric vehicles, aircrafts, spacecrafts, and energy producing systems where working conditions can see temper ...
SBIR Phase I 2023 Department of DefenseDefense Microelectronics Activity -
Advanced Low Volume Semiconductor Manufacturing
SBC: SECUREFOUNDRY INC Topic: DLA231001Scope The Scope of the project exclusively pertains upon building a starting point to reconstitute a successful low volume lithography system which provides significant potential to produce cost effective and rapid prototyping of advanced microelectronics. The scope of the project is limited to the tool evaluation by producing imaging data of various shapes and patterns. Assess and Install Mach ...
SBIR Phase I 2023 Department of DefenseDefense Logistics Agency -
Robust DNA Taggant Reader for Electronics Counterfeit Prevention
SBC: NANOHMICS INC Topic: DMEA201001Defense MicroElectronics Activity (DMEA) seeks to develop a robust technique to sample and read DNA taggants applied to surfaces of microelectronics supply chain components that employs machine learning methods to develop trained models capable of detecting counterfeit microelectronic parts with > 95% accuracy. To address the need for rapid (< 5 minute) genetic taggant signature profiling rooted i ...
SBIR Phase II 2022 Department of DefenseDefense Microelectronics Activity