You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Source Approval Request (SAR) Package and Development Plan for Battery Connector Assembly NSN 6150-01-629-3728

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 6150-01-629-3728, a Battery Connector Assembly. This battery connector assembly is out of stock at two different suppliers (but available at a third supplier, please see below in Figure 6-1), and the NSN pertains to F-15C and F-15D based platforms including variants currently flown by some ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  2. Source Approval Request (SAR) Package and Development Plan for Radio Cable Assembly NSN 5995-11-959-918

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 5995-01-195-9918, a Radio Cable Assembly for the B-1 platform. During Phase I, Kaney will utilize our in-house manufacturing and analysis capabilities to develop Kaney drawings and a manufacturing/qualification plan for this part. Kaney has extensive domain knowledge and capabilities rela ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  3. Source Approval Request (SAR) Package and Development Plan for Generator Rack NSN 6110-10-733-343

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 6110-01-073-3343, a Generator Rack for the C-130 platform. During Phase I, Kaney will utilize our in-house manufacturing and analysis capabilities to develop Kaney drawings and a manufacturing/qualification plan for this part. Kaney has extensive domain knowledge and capabilities related ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  4. Advanced Low Volume Semiconductor Manufacturing

    SBC: SECUREFOUNDRY INC            Topic: DLA231001

    Scope The Scope of the project exclusively pertains upon building a starting point to reconstitute a successful low volume lithography system which provides significant potential to produce cost effective and rapid prototyping of advanced microelectronics. The scope of the project is limited to the tool evaluation by producing imaging data of various shapes and patterns.  Assess and Install Mach ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  5. Source Approval Request (SAR) Package and Development Plan for Accelerometer NSN 6610-00-151-6684

    SBC: Kaney Aerospace, Inc.            Topic: DLA213001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for NSN 6610-00-151-6684, a high-reliability accelerometer for flight data recording systems onboard the B-1 platform. Due to the critical nature of the component, our SAR will be elevated to an engineering services activity (ESA). Kaney has extensive domain knowledge and capabilities related to this part. Through our re ...

    SBIR Phase I 2022 Department of DefenseDefense Logistics Agency
  6. New Source Development for ALRE Item

    SBC: SUNBELT DESIGN & DEVELOPMENT, INC.            Topic: DLA222001

    Sunbelt proposes to expand the Small Business Manufacturer (SBM) base for Aircraft Launch & Recovery Equipment (ALRE) managed by the DLA, by becoming a qualified source for NSN 1720-01-116-8539, Parts Kit, Holdback, P/N 218334.  Sunbelt has researched all 35 NSNs associated with this topic, and this NSN is similar to parts Sunbelt has manufacturing experience with.  Sunbelt has built Holdback A ...

    SBIR Phase I 2022 Department of DefenseDefense Logistics Agency
  7. Sustainability Analysis and New Source Development for C-5 Ductwork

    SBC: SUNBELT DESIGN & DEVELOPMENT, INC.            Topic: DLA222001

    Sunbelt proposes to expand the Small Business Manufacturer (SBM) base for C-5 Ductwork items managed by the DLA.  There are currently only limited sources for these items. Sunbelt will research the manufacturing processes and materials for the subset of 12 items in the NSN list for this SBIR.  Sunbelt will develop models and drawings for the items, price the materials and processes, and determi ...

    SBIR Phase I 2022 Department of DefenseDefense Logistics Agency
  8. Reverse Engineering and New Source Development for various RPPOB Items

    SBC: SUNBELT DESIGN & DEVELOPMENT, INC.            Topic: DLA222001

    Sunbelt proposes to expand the Small Business Manufacturer (SBM) base for various items without drawings managed by the DLA. Sunbelt will leverage the DLA RPPOB program to reverse engineer sample parts. Sunbelt will research the manufacturing processes and materials for the subset of 7 items in the NSN list for this SBIR. Sunbelt will develop models and drawings for the items, price the material ...

    SBIR Phase I 2022 Department of DefenseDefense Logistics Agency
  9. Carbon Fiber/Polysiloxane Prepreg Tape for Automatic Tape Placement Additive Manufacturing of Hypersonic Thermal Protection Systems

    SBC: KAI, LLC            Topic: DLA222007

    The innovation of this proposal, “Carbon Fiber/Polysiloxane (C/UHTR) Prepreg Tape for Automatic Tape Placement (ATP),” utilizes Techneglas’ Ultra High Temperature Resin (UHTR) as the basis to develop an easily transportable, conveniently storable, and ready-to-use prepreg tape. This novel technology can be utilized to additively manufacture complexly shaped Thermal Protection Systems (TPS) u ...

    SBIR Phase I 2022 Department of DefenseDefense Logistics Agency
  10. Levaraging AxM Software Technology to Empower Material Reuse and Embodied Carbon Reporting in the Built Environment

    SBC: RHEAPLY INC            Topic: 4D

    As the single largest consumer of materials and energy use worldwide, the construction sector remains a prime target for materials reuse reform. (Krausmann et al., 2009; De Ia Rue du Can & Price, 2008). Construction and ongoing operation of the built environment extracts a significant amount of resources -- and on an ongoing basis. According to the U.S. Green Building Council (USGBC), buildings ac ...

    SBIR Phase I 2022 Environmental Protection Agency
US Flag An Official Website of the United States Government