The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Disaster Platform- Helping communities build resilience to disasters via social networking, gamification and relationship building

    SBC: GOODGAMES LLC            Topic: 3A

    In today’s world of accelerating climate change effects, a community's capacity to plan for and build resilience to disasters, homeland security threats, and extreme weather is of increasing importance. The ability of public safety organizations and local governments to effectively communicate with community members in emergency situations is critical, especially in the immediate aftermath of la ...

    SBIR Phase I 2023 Environmental Protection Agency
  2. Formable Preform for Advanced Ceramic Matrix Composite Structures

    SBC: PEPIN ASSOCIATES INC            Topic: DLA23A003

    Pepin Associates, Inc. has developed a unique, aligned discontinuous textile reinforcement for composite structures.  This reinforcement architecture is composed of short, overlapped tow segments.  The architecture allows the textile to stretch in its reinforcement direction.  This ability permits rapid fabrication of complex shaped thermal protection system structures from simple low cost sh ...

    STTR Phase I 2023 Department of DefenseDefense Logistics Agency
  3. Accelerated Processing with Geometry-Specific Pyrolysis Heating Profiles for Production of C-C Hot Structures

    SBC: Carbon Carbon Advanced Technologies, Inc.            Topic: DLA231D07

    The highest-risk processing step in manufacturing C-CAT’s ACC material is the initial carbonization cycle, during which a C/Ph composite preform is carbonized to produce a low-density C/C part to be subsequently densified using a Polymer Infiltration and Pyrolysis (PIP) process. Though the carbonization steps of the PIP densification cycles also present a risk, it is during the initial cycle tha ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  4. Tungsten 3% Rhenium Wire Manufacturing

    SBC: Elmet Technologies LLC            Topic: DLA231D08

    When GTP discontinued the manufacture of WRe wire, it ended US-based production of a material critical in the operations of MWT/TWT equipment for defense applications.  The objective of this project is to produce a WRe wire that matches as closely as possible the wire produced by GTP while also potentially developing a process that meets or exceeds the yields achieved by GTP.  The wire produced ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  5. Qualification of Aircraft Accelerometer NSN 6610-00-151-6684 & Torque Motor NSN 6105-01-326-8652

    SBC: Kaney Aerospace, Inc.            Topic: DLA213001

    The objective of this Phase II SBIR proposal is to continue the design and qualification efforts for a single-axis accelerometer (NSN 6610-00-151-6684) and perform detailed design and qualification activities for a Torque Motor (NSN 6105-01-326-8652). During Phase II, Kaney will utilize in-house manufacturing and analysis capabilities to produce drawings and manufacturing/qualification plans for t ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  6. Source Approval Request (SAR) Package and Development Plan for Battery Connector Assembly NSN 6150-01-629-3728

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 6150-01-629-3728, a Battery Connector Assembly. This battery connector assembly is out of stock at two different suppliers (but available at a third supplier, please see below in Figure 6-1), and the NSN pertains to F-15C and F-15D based platforms including variants currently flown by some ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  7. Source Approval Request (SAR) Package and Development Plan for Radio Cable Assembly NSN 5995-11-959-918

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 5995-01-195-9918, a Radio Cable Assembly for the B-1 platform. During Phase I, Kaney will utilize our in-house manufacturing and analysis capabilities to develop Kaney drawings and a manufacturing/qualification plan for this part. Kaney has extensive domain knowledge and capabilities rela ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  8. Source Approval Request (SAR) Package and Development Plan for Generator Rack NSN 6110-10-733-343

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 6110-01-073-3343, a Generator Rack for the C-130 platform. During Phase I, Kaney will utilize our in-house manufacturing and analysis capabilities to develop Kaney drawings and a manufacturing/qualification plan for this part. Kaney has extensive domain knowledge and capabilities related ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  9. REPLACING PLASTIC WITH BIODEGRADABLE PACKGING IN FOOD SERVICE

    SBC: Biomass Energy Systems, Inc.            Topic: DLA211003

    This proposal follows the DLA SBIR Phase 1 Contract SP4701-21-P-0075. It seeks resources to move to Phase 2 so that the lessons learned and data developed in Phase 1 will further expand on the solution, including the field demonstration for replacing the plastic packaging in food service with the biodegradable Cellulosic Bio-Polymer (CBP) packaging to address military needs. Phase 1 was a great le ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  10. Advanced Low Volume Semiconductor Manufacturing

    SBC: SECUREFOUNDRY INC            Topic: DLA231001

    Scope The Scope of the project exclusively pertains upon building a starting point to reconstitute a successful low volume lithography system which provides significant potential to produce cost effective and rapid prototyping of advanced microelectronics. The scope of the project is limited to the tool evaluation by producing imaging data of various shapes and patterns.  Assess and Install Mach ...