You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. FEASIBILITY OF AN INTEGRATED CONTINUOUS PROCESS USING AUTO- MATIC INSTRUMENTATION AND STATAISTICAL ANALYSES TO REDUCE COSTS AND TO INCREASE THE EFFICIENCY OF PEAK DETECTION AND POLLUTION CONTROL IN UNDERGROUND STORAGE TANKS

    SBC: Production Monitoring &            Topic: N/A

    OVER THE LAST SEVERAL YEARS, THE EPA HAS DEVOTED MAJOR EF- FORTS TO IDENTIFY AND DOCUMENT THE MAGNITUDE OF THE RISKS OFENVIRONMENTAL POLLUTION DUE TO LEAKING UDERGROUND STORAGE TANKS (UST). IN APRIL 1987, THE EPA PUBLISHED THE PROPOSED REGULATIONS FOR THE OWNERS AND OPERATORS OF UST, WHICH ARE EXPECTED TO BE FINALIZEDD IN EARLY 1988. THESE REGULATIONS INCLUDE REQUIREMENTS FOR TANK TIGHTNESS TESTS, ...

    SBIR Phase II 1989 Environmental Protection Agency
  2. AUTOMATIC PRIME SOUNDING SELECTION RESEARCH

    SBC: Zycor Inc.            Topic: N/A

    MANUAL SELECTION OF PRIME SOUNDINGS FOR DISPLAY ON A NAUTICAL CHART IS TIME CONSUMING AND EXPENSIVE. THE COMPUTER PROGRAM AVAILABLE TO NOAA WHICH PERFORMS PRIME SOUNDING SELECTION USES OUTDATED SOFTWARE TECHNOLOGY. THIS RESEARCH EFFORT WILL INVESTIGATE THE FEASIBILITY OF AUTOMATING PRIME SOUNDING SELECTION WITH A NEW ALGORITHM WHICH USES OF STATE-OF-THE-ART SURFACE MODELING TECHNIQUES. THE SURFACE ...

    SBIR Phase II 1989 Department of Commerce
  3. Analysis of New WWVB Modulation Schemes for Future Broadcast

    SBC: XW, LLC dba Xtendwave            Topic: N/A

    This Phase 2 project targets the completion of the development of an improved system for the broadcasting of the WWVB signal, as a direct continuation of the Phase 1 project, which successfully validated the proposed approach through a feasibility study and analyses. Objectives of this project include the design of the new modulation scheme and protocol, the development of a new time-code generato ...

    SBIR Phase II 2011 Department of CommerceNational Institute of Standards and Technology
  4. Advanced Technologies for Discrete-Parts Manufacturing

    SBC: ADVANCED POWDER SOLUTIONS INC            Topic: DLA08001

    SD

    SBIR Phase II 2011 Department of DefenseDefense Logistics Agency
US Flag An Official Website of the United States Government