Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until September, 2020.

  1. FEASIBILITY OF AN INTEGRATED CONTINUOUS PROCESS USING AUTO- MATIC INSTRUMENTATION AND STATAISTICAL ANALYSES TO REDUCE COSTS AND TO INCREASE THE EFFICIENCY OF PEAK DETECTION AND POLLUTION CONTROL IN UNDERGROUND STORAGE TANKS

    SBC: Production Monitoring &            Topic: N/A

    OVER THE LAST SEVERAL YEARS, THE EPA HAS DEVOTED MAJOR EF- FORTS TO IDENTIFY AND DOCUMENT THE MAGNITUDE OF THE RISKS OFENVIRONMENTAL POLLUTION DUE TO LEAKING UDERGROUND STORAGE TANKS (UST). IN APRIL 1987, THE EPA PUBLISHED THE PROPOSED REGULATIONS FOR THE OWNERS AND OPERATORS OF UST, WHICH ARE EXPECTED TO BE FINALIZEDD IN EARLY 1988. THESE REGULATIONS INCLUDE REQUIREMENTS FOR TANK TIGHTNESS TESTS, ...

    SBIR Phase II 1989 Environmental Protection Agency
  2. LONG DURATIONN BALLOON TECHNOLOGY

    SBC: Winzen Engineering, Inc.            Topic: N/A

    THIS PROPOSAL ADDRESSES THE DESIGN AND FABRICATION OF A LONG ENDURANCE BALLOON VEHICLE HAVING A ONE-YEAR LIFE AT 120,000 FEET. THE CONCEPT MAKES USE OF THE EXPERIENCE GAINED BY THE SCIENTIFIC COMMUNITY OVER THE PAST TWO DECADES IN FLYING SMALLER PAYLOADS FOR LONG PERIODS OF TIME. THE APPROACH TO BE TAKEN WILL RESULT IN THE DESIGN OF A SUPERPRESSURE BALLOON WITH A WELL-DEFINED BIAXIAL STRESS DISTRI ...

    SBIR Phase II 1989 Department of DefenseDefense Advanced Research Projects Agency
US Flag An Official Website of the United States Government