You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. FEASIBILITY OF AN INTEGRATED CONTINUOUS PROCESS USING AUTO- MATIC INSTRUMENTATION AND STATAISTICAL ANALYSES TO REDUCE COSTS AND TO INCREASE THE EFFICIENCY OF PEAK DETECTION AND POLLUTION CONTROL IN UNDERGROUND STORAGE TANKS

    SBC: Production Monitoring &            Topic: N/A

    OVER THE LAST SEVERAL YEARS, THE EPA HAS DEVOTED MAJOR EF- FORTS TO IDENTIFY AND DOCUMENT THE MAGNITUDE OF THE RISKS OFENVIRONMENTAL POLLUTION DUE TO LEAKING UDERGROUND STORAGE TANKS (UST). IN APRIL 1987, THE EPA PUBLISHED THE PROPOSED REGULATIONS FOR THE OWNERS AND OPERATORS OF UST, WHICH ARE EXPECTED TO BE FINALIZEDD IN EARLY 1988. THESE REGULATIONS INCLUDE REQUIREMENTS FOR TANK TIGHTNESS TESTS, ...

    SBIR Phase II 1989 Environmental Protection Agency
  2. WS-BD Conformant Handheld Multi-biometric Acquisition System

    SBC: Fulcrum Biometrics, LLC            Topic: 9010477TT

    Secure trusted biometric validation of identity has never been more important. The increase in global terrorism, unfettered identity theft and new legislation requiring multi-factor authentication are a few of the driving factors. The biometrics industry has not actively responded to the changing market conditions being driven by the explosion in mobile computing. Millions of new mobile devices ar ...

    SBIR Phase II 2013 Department of CommerceNational Institute of Standards and Technology
  3. A 10 Kilowatt, Rankin Cycle Agricultural Waste to Energy Conversion Module Utilizing Ultra Micro Turbo-Alternators

    SBC: Fluidic microControls, Inc.            Topic: H

    In 2011, there were 60,000 dairy farms in the US. Of there, 56,600 had herds of fewer than 500 animals. Currently, manure digester installations are only considered economical for herds of at least 500 animals. There require turbine or diesel generator sets of 100 Kilowatt size and larger. The need exists for a smaller waste to energy conversion approach for implementation on small farms were ...

    SBIR Phase II 2013 Environmental Protection Agency
US Flag An Official Website of the United States Government