You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. DECISION MAKING IN A GEOGRAPHICALLY DISTRIBUTED ENVIRONMENT

    SBC: AMERICAN XTAL TECHNOLOGY            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseArmy
  2. ARTIFICIAL INTELLIGENCE FOR COMMAND AND CONTROL

    SBC: AMERIGENICS, INC.            Topic: N/A

    THIS PROPOSAL PRESENTS AN APPROACH TO THE DEVELOPMENT AND EXPERIMENTALREFINEMENT OF TECHNIQUES AND INTERFACE COMPONENTS TO FACILITATE USER ACCESS TO PROBABILITY DISTRIBUTION DATA IN THE CONTEXT OF MILITARY DECISION PROBLEMS. WE PROPOSE TO DEVELOP A DESIGN METHODOLOGY FOR DECISION AIDING INTERFACES FOR TIME-STRESSED, MILITARY DECISIONS THAT BEGIN WITH A CHARACTERIZATION OF AVAILABLE INFORMATION AND ...

    SBIR Phase II 1989 Department of DefenseArmy
  3. PASSIVE AIRBLAST ATTENUATION VALVES FOR CONVENTIONAL WEAPONS

    SBC: BAKER ENGINEERING AND RISK CONSULTANTS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseArmy
  4. SORBENTS FOR DECONTAMINATION OF CHEMICAL WARFARE AGENTS

    SBC: VAC, INC.            Topic: N/A

    THE U.S. MILITARY IS IN DIRE NEED OF NEW DECONTAMINATION METHODS/ SYSTEMS. THE CURRENT M258A1 AND D52 ARE EXCESSIVELY CORROSIVE AND A REPLACEMENT IS SOUGHT. IT HAS BEEN PROPOSED THAT THE IDEAL DECONTAMINATION WOULD CONSIST OF A SOLID SORBENT WITH REACTIVE LIGARDS. CDS, INC. BELIEVES THAT THIS IDEA COULD BE A REALITY UTILIZING IN-HOUSE TECHNOLOGY.

    SBIR Phase I 1989 Department of DefenseArmy
  5. DEVELOPMENT OF A HUMAN OPERATOR MODEL FOR SYSTEM EVALUATION

    SBC: CHI SYSTEMS INC            Topic: N/A

    A SYSTEMS APPROACH IS PRESENTED FOR DEVELOPMENT AND EMPIRICAL VALIDATION OF A HUMAN OPERATOR MODEL FOR SYSTEM EVALUATION (HOMSE). A PLAN IS PROPOSED TO DEVELOP HOMSE PRIMARILY FROM EXISTING TECHNIQUES AND COMPONENTS IN THE DOMAIN OF HUMAN PERFORMANCE MODELS. THE MODEL WILL BE DESIGNED TO PREDICT THE EFFECTS OF INDIVIDUAL DIFFERENCES IN THE PERCEPTUAL-MOTOR-COGNITIVE PERFORMANCE OF HUMAN OPERTORS U ...

    SBIR Phase II 1989 Department of DefenseArmy
  6. INTELLIGENT KNOWLEDGE-BASED CAD FOR PRODUCIBILITY

    SBC: Cim Systems, Inc.            Topic: N/A

    INNOVATIVE RESEARCH IS NEEDED TO ADDRESS THE PROBLEM OF DESIGNING FOR PRODUCIBILITY. KNOWLEDGE BASED SYSTEMS NOW OFFER CONSIDERABLE PROMISE IN THIS FIELD. IF THE GROUND DATA FOR THE INFERENCES OF SUCH A SYSTEM CAN BE CAPTURED DIRECTLY FROM A DESIGN DRAWING THEN ANALYSIS CAN BE CONDUCTED WITH THE AID OF AN EXPERT SYSTEM AND RESULTS MADE AVAILABLE AT A CAD WORKSTATION TO PROMPT IMMEDIATE REVISION IF ...

    SBIR Phase II 1989 Department of DefenseArmy
  7. USE OF A CYCLONE COMBUSTOR TO CONVERT MUNICIPAL INCINERATOR FLY ASH TO INERT SLAG

    SBC: Coal Tech Corp.            Topic: N/A

    AN ADVANCED AIR COOLED, CYCLONE COAL COMBUSTOR WILL BE USED TO DEMONSTRATE ITS TECHNICAL FEASIBILITY FOR THE EFFICIENT CONVERSION OF FLY ASH FROM MUNICIPAL INCINERATORS TO SLAG. TWO SETS OF SHORT DURATION PARAMETRIC TESTS WILL BE PERFORMED IN WHICH FLY ASH WILL BE INJECTED IN A COMMERCIAL SCALE COMBUSTOR INSTALLED ON A 17,500 LB/HR PACKAGE BOILER, LOCATED IN WILLIAMSPORT, PENNSYLVANIA. THE OBJECTI ...

    SBIR Phase I 1989 Environmental Protection Agency
  8. THIN BROAD BAND VHF/UHF ABSORBER CONCEPTS

    SBC: Damaskos, Inc.            Topic: N/A

    A THIN BROADBAND NORMAL INCIDENCE VHF/UHF ABSORBER WILL BE DESIGNED. THE ABSORBER WILL BE A LAMINATE STRUCTURE USING MAGNETIC ABSORBING MATERIAL TO PROVIDE THE PRIMARY LOSS MECHANISM. THE MAGRAM WILL BE LOADED WITH OTHER MATERIALS TO CONTROL ITS IMPEDANCE AND INCREASE ITS INDEX OF REFRACTION. IMPEDANCE TRANSFORMATION LAYERS WILL BE ADDED TO CONTROL THE IMPEDANCE INTO THE ABSORBING MATERIAL. THESE ...

    SBIR Phase I 1989 Department of DefenseArmy
  9. FATIGUE LIFE MONITOR (NON-AIRFRAME)

    SBC: Diagnostic Equipment Developme            Topic: N/A

    DIAGNOSTIC TECHNIQUES FOR FATIGUE LIFE MONITORING OF DYNAMIC COMPONENTS SUCH AS GEARS, BEARINGS, AND SHAFTS WILL BE EVALUATED AND INTEGRATED INTO AN OVERALL CONCEPT FOR AN AIRBORNE FATIGUE LIFE MONITORING SYSTEM. A DRAFT SPECIFICATION WILL BE WRITTEN TO DEFINE THE FUNCTIONAL ELEMENTS OF A FATIGUE LIFE MONITORING SYSTEM FOR THE DRIVE TRAIN OF A CH-47D HELICOPTER. THE SYSTEM SPECIFICATION WILL INCLU ...

    SBIR Phase I 1989 Department of DefenseArmy
  10. PERFORMANCE MODES FOR MULTI-STAGE WARHEAD SYSTEMS

    SBC: Dyna East Corp.            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseArmy
US Flag An Official Website of the United States Government