You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
SAFE AND ECONOMICAL CHLORINE DIOXIDE GENERATION
SBC: Eltech Research Corpon Topic: N/ASAFE, COST EFFECTIVE ALTERNATIVES TO CHLORINE TREATMENT OF DRINKING WATER FOR DISTRIBUTION AND DISINFECTION HAVE BEEN SOUGHT FOR SOME TIME. CHLORINE DIOXIDE IS A VIABLE ALTERNATIVE TO CHLORINE FOR THE TREATMENT OF EVEN POOR QUALITY WATER SUPPLIES AND THE REDUCTION OF POTENTIAL CANCER CAUSING CHLORINATED ORGANICS. ITS WIDESPREAD USE HAS BEEN INHIBITED BY THE COSTS AND/OR COMPLEXITY OF ITS PRODUCTIO ...
SBIR Phase I 1989 Environmental Protection Agency -
DOUBLE HEAT EXCHANGES SYSTEM FOR MINIMIZING ENERGY AND POLLUTION CONTROL COSTS IN INDUSTRIAL PROCESSES
SBC: Energy Innovations, Inc. Topic: N/ATHERE ARE NUMEROUS INDUSTRIAL PROCESSES REQUIRING THAT MATERIAL BE HEATED AND THEN SUBSEQUENTLY COOLED. IF MOST OF THIS HEAT IS RECOVERED AND RECYCLED TO THE OVEN, THE NET POWER INPUT TO THE OVEN COULD BE SUBSTANTIALLY REDUCED. THE KEY TO ACCOMPLISHING THIS IS AN INCREASE OF THE HEAT TRANSFER COEFFICIENT BETWEEN GAS AND MATERIAL SO THAT THE HEAT EXCHANGERS ARE RESASONABLY COMPACT. SIMPLE EXPERIMEN ...
SBIR Phase I 1989 Environmental Protection Agency -
FAST LIGHTOFF CATALYTIC CONVERTER
SBC: PRECISION COMBUSTION, INC. Topic: N/AN/A
SBIR Phase I 1989 Environmental Protection Agency -
FEASIBILITY OF AN INTEGRATED CONTINUOUS PROCESS USING AUTO- MATIC INSTRUMENTATION AND STATAISTICAL ANALYSES TO REDUCE COSTS AND TO INCREASE THE EFFICIENCY OF PEAK DETECTION AND POLLUTION CONTROL IN UNDERGROUND STORAGE TANKS
SBC: Production Monitoring & Topic: N/AOVER THE LAST SEVERAL YEARS, THE EPA HAS DEVOTED MAJOR EF- FORTS TO IDENTIFY AND DOCUMENT THE MAGNITUDE OF THE RISKS OFENVIRONMENTAL POLLUTION DUE TO LEAKING UDERGROUND STORAGE TANKS (UST). IN APRIL 1987, THE EPA PUBLISHED THE PROPOSED REGULATIONS FOR THE OWNERS AND OPERATORS OF UST, WHICH ARE EXPECTED TO BE FINALIZEDD IN EARLY 1988. THESE REGULATIONS INCLUDE REQUIREMENTS FOR TANK TIGHTNESS TESTS, ...
SBIR Phase II 1989 Environmental Protection Agency -
20-year Lithium Primary battery for Missile-Implantable Corrosion Monitoring Systems and as Primary Power Sources for mini-UAVs
SBC: AMERICAN ENERGY TECHNOLOGIES CO Topic: DLA122002American Energy Technologies Co., a woman-owned small business concern of Illinois will partner with Lockheed Martin Corp"s Missions Systems and Sensors and with Analog Devices, in order to develop and demonstrate a new and improved primary battery capable of delivering up to two thirds of the energy density of gasoline as employed in an internal combustion engine, and up to 6.5 times the specific ...
SBIR Phase I 2014 Department of DefenseDefense Logistics Agency -
Advanced Forging Manufacturing Innovations
SBC: SCIENTIFIC FORMING TECHNOLOGIES CORPORATION Topic: DLA122001Forging process is widely used in the manufacture of critical mission sensitive components that require high strength and better consistent performance in service conditions. Process modeling for forging processes has been very successful in the last three decades. Modeling forging process serves us a virtual tryout tool and it offers lot more details about the forging process and parts than an e ...
SBIR Phase I 2014 Department of DefenseDefense Logistics Agency -
Water Purification using TiO2 and Novel Activation Method
SBC: Imaging Systems Technology, Inc. Topic: AUnder this Phase II SBIR, Imaging Systems Technology (IST) will optimize and scale up its UV Plasma- shells with Titanium (IV) Dioxide (TiO2) system to produce a low cost, rugged, lightweight, and highly efficient and versatile water purification system. Plasma-shells are tiny hollow gas encapsulating devices ranging in size from 400 microns to 8.00 mm. Under the EPA Phase I SBIR, IST has successf ...
SBIR Phase II 2014 Environmental Protection Agency -
Low Cost, Efficient Microchannel Plasma Ozone System for Point of Use Water Treatment
SBC: EP Purification, Inc. Topic: AA team at EP Purification has performed research for the development and commercialization of low-cost microchannel plasma reactor modules capable of efficiently producing ozone for water treatment and other environmental applications in a slim form factor and size. The conservation of water resources for human consumption is a growing national priority. Ozone is a unique purification agent as it ...
SBIR Phase II 2014 Environmental Protection Agency -
Low-Cost, Regenerable Air Filter for Efficient Gaseous Pollutants Removal
SBC: PRECISION COMBUSTION, INC. Topic: DPrecision Combustion, Inc. (PCI) proposes to develop a regenerable, low-cost, high-efficiency pollution control technology for removal of gaseous pollutants from contaminated air streams. This innovative air filter technology will combine our novel proprietary Microlith® support elements with sorbent nanomaterials that can be tailored to capture a variety of targeted gaseous pollutants. Originall ...
SBIR Phase I 2014 Environmental Protection Agency -
Development of Zinc Coatings on Steel by Cermaclad(TM) to Replace Pickling Lines
SBC: MesoCoat Topic: BEvery year, a significant amount of money is lost due to atmospheric attack of steel parts. A convenient and effective way for corrosion protection is coating the unalloyed steel with a thin layer of zinc (Zn) metal by galvanizing. Pickling is an essential step of this process to ensure a high-quality surface of steel for further processing. In this process, acid is used to remove scale from the s ...
SBIR Phase I 2014 Environmental Protection Agency