You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Disaster Platform- Helping communities build resilience to disasters via social networking, gamification and relationship building
SBC: GOODGAMES LLC Topic: 3AIn today’s world of accelerating climate change effects, a community's capacity to plan for and build resilience to disasters, homeland security threats, and extreme weather is of increasing importance. The ability of public safety organizations and local governments to effectively communicate with community members in emergency situations is critical, especially in the immediate aftermath of la ...
SBIR Phase I 2023 Environmental Protection Agency -
SYNTHETIC DATA GENERATION FOR RAPID HYBRID CHEMISTRY BATTERY PROTOTYPING
SBC: Haylon Technologies Topic: A234007Redacted
SBIR Phase I 2023 Department of DefenseArmy -
Large-scale Additive Manufacturing R&D to Advance Modular Shelter Design and Deployment
SBC: Compotech, Inc. Topic: A22013Shelter system technologies provide vital support to U.S. military personnel during in-theatre operations and peace-time continuity. Soldiers, logistics experts, and decision makers across the chain of command require shelter systems that perform in austere environments while also being cost-effective, resilient, durable, and easily maintained. For land-based conflicts in more remote locations and ...
SBIR Phase I 2023 Department of DefenseArmy -
Advanced Modular Power Electronics for Resilient Energy (AMPERE): A FACE-Compatible Power Management System
SBC: Kaney Aerospace, Inc. Topic: A224015Redacted
SBIR Phase I 2023 Department of DefenseArmy -
WBG Effects on Advanced Topologies for High Efficiency Rectifiers (WEATHER)
SBC: Kaney Aerospace, Inc. Topic: A20067Redacted
SBIR Phase II 2023 Department of DefenseArmy -
DETECT-ML: Detection of Energetic Topology Errors via Computed Tomography & Machine Learning
SBC: Compotech, Inc. Topic: A224013Compotech, Inc. seeks to build on our award winning FRAG-CT munition characterization method by developing a new complementary software and hardware package to provide rapid, real-time defect detection at the heart of a munition’s explosive core. The detection technique leverages proven AI/ML detection software algorithms and high speed CT scanning equipment.
SBIR Phase I 2023 Department of DefenseArmy -
HOT Dual-Band (eSWIR/MWIR) T2SL Camera
SBC: EPISENSORS INC Topic: A234013Redacted
SBIR Phase I 2023 Department of DefenseArmy -
Protective nanocrystalline coating to enable consistent superlubricity
SBC: QUESTEK INNOVATIONS LLC Topic: A21CT005Under this STTR program, QuesTek Innovations LLC (QuesTek), teaming with Prof. Yip-Wah Chung at Northwestern University (NU), proposes to develop a nanocrystalline coating technology to enable consistent superlubricity in engines by combining computational materials design approach at QuesTek and experimental prototyping at NU, with consulting services provided by Prof. Christopher Schuh at Xtalic ...
STTR Phase I 2022 Department of DefenseArmy -
Computational Tools for the Multiscale Simulation of Engineered Wood Products (EWP) under Dynamic Loading Conditions
SBC: CUSATIS COMPUTATIONAL SERVICES INC. Topic: A21CT020This project focuses on the development of computational tools for the multiscale simulation of engineered wood products under impulsive loading conditions resulting from blasts and impacts. The proposed computational tools are based on a multiscale model for wood that simulates failure mechanisms at the length scale of the wood cellular structure. The adopted fine scale model, entitled Connectors ...
STTR Phase I 2022 Department of DefenseArmy -
Levaraging AxM Software Technology to Empower Material Reuse and Embodied Carbon Reporting in the Built Environment
SBC: RHEAPLY INC Topic: 4DAs the single largest consumer of materials and energy use worldwide, the construction sector remains a prime target for materials reuse reform. (Krausmann et al., 2009; De Ia Rue du Can & Price, 2008). Construction and ongoing operation of the built environment extracts a significant amount of resources -- and on an ongoing basis. According to the U.S. Green Building Council (USGBC), buildings ac ...
SBIR Phase I 2022 Environmental Protection Agency