You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
SAVANT: Sequential Advancement of Technology for Deep Borehole Disposal
SBC: Deep Isolation, Inc. Topic: CThis project supports the ARPA-E Mission Area of “improving management, clean-up and disposal of radioactive waste and spent nuclear fuel”. A series of tests and demonstrations for deep borehole disposal canisters at the Deep Borehole Demonstration Center in Cameron, Texas - coupled with development of a US supply chain and global tech-to-market partnerships - will mature the canister to Techn ...
SBIR Phase I 2023 Department of EnergyARPA-E -
OPERA: Optimizing a potassium-ion electrolyte for revolutionary automotive batteries
SBC: Project K Energy, Inc. Topic: 1We propose to develop and commercialize a potassium-ion battery for use in electric vehicles (EVs). The fundamental properties of potassium transport in organic electrolytes allow for fast charging from 0 to 80% capacity in less than 5 minutes. The battery will pair a stable, open-framework cathode based on a Prussian blue analog (PBA) with a conventional graphite anode for a high-performance batt ...
SBIR Phase I 2023 Department of EnergyARPA-E -
High SYmmetric PowER (HYPER) Battery
SBC: TYFAST ENERGY CORP Topic: 1This proposal aims to rethink the fundamental design of a high-power lithium-ion battery to realize the combined properties of high energy density, ultrafast charging and long cycle life. The team of Tyfast, 2matls, SpectraPower and UC San Diego have demonstrated electrode breakthroughs, experience in designing fast-charging batteries and use of novel electrolytes to deliver a battery cell exceedi ...
SBIR Phase I 2023 Department of EnergyARPA-E -
Liquefied Gas Electrolytes for Next-Gen EV Batteries
SBC: SOUTH 8 TECHNOLOGIES, INC. Topic: 1This combined phase SBIR I,II,IIS proposal seeks to develop and demonstrate high power lithium battery cells having up to 330 Wh-kg specific energy with capability to fast charge using a novel Liquefied Gas Electrolyte (LiGas) technology. The LiGas electrolyte uses safe and non-toxic, non-corrosive gasses which are liquefied under moderate pressures and are easily contained in standard cylindrical ...
SBIR Phase I 2023 Department of EnergyARPA-E -
Novel technology for concentration and detection of PFAS in water environment
SBC: HJ SCIENCE & TECHNOLOGY INC Topic: 1DHJ Science & Technology, Inc. proposes to demonstrate the feasibility of a portable technology capable of performing on-site detection of per- and polyfluoroalkyl substances (PFAS) in complex water environments including drinking water, groundwater, surface water and wastewater. Our approach combines these three technologies: 1) microfluidic automation, 2) rapid sample concentration, and 3) separa ...
SBIR Phase I 2023 Environmental Protection Agency -
Self-calibrating Air Toxics Monitor
SBC: SEACOAST SCIENCE, INC. Topic: 2AIn this Phase I SBIR, Seacoast proposes to develop a fully automated analyzer to monitor indoor air quality (IAQ) in spaces suspected of containing air toxics. These toxic vapors typically emanate from contaminated soil or groundwater such as Superfund sites. Currently, the US EPA lists 1,333 Superfund sites and 2,300 other locations, all potential sources of vapor intrusion, deserving of monitori ...
SBIR Phase I 2023 Environmental Protection Agency -
Disaster Platform- Helping communities build resilience to disasters via social networking, gamification and relationship building
SBC: GOODGAMES LLC Topic: 3AIn today’s world of accelerating climate change effects, a community's capacity to plan for and build resilience to disasters, homeland security threats, and extreme weather is of increasing importance. The ability of public safety organizations and local governments to effectively communicate with community members in emergency situations is critical, especially in the immediate aftermath of la ...
SBIR Phase I 2023 Environmental Protection Agency -
Complete Resource Recovery and Hydrogen Production from Secondary Aluminum Processing Waste Processing Waste
SBC: HYDROVA INC Topic: 4BThe secondary aluminum processing (SAP) industry in the US spends billions of dollars to send over 1 million tons of dross and salt cake waste to landfill every year. Recycling innovation for SAP waste presents a major opportunity to reduce raw material consumption and allow for significant cost savings to aluminum producers. A novel Two-Stage Alkaline Hydrometallurgical Recovery (T-SAHR) process ...
SBIR Phase I 2023 Environmental Protection Agency -
AI-Based Bin Tagging Platform for Regulatory Compliance
SBC: ZABBLE, INC. Topic: 4BZabble's mission is to help organizations achieve zero waste by delivering real-time actionable insights using an AI-enabled SaaS platform. California’s Short-Lived Climate Pollutant Reduction Law (SB 1383) is the largest change to it's recycling and waste industry since the 1980s. The law establishes new organic waste collection and recycling programs, food recovery programs, and requirements f ...
SBIR Phase I 2023 Environmental Protection Agency -
Effective Strategies for Regional Packaging Reuse Systems
SBC: Iterant, Inc. Topic: 4CThis project will investigate technology-enabled strategies for regional plastic packaging reuse systems. Iterant has implemented an online reuse marketplace that provides economic incentives for key stakeholders involved in the manufacturing, use/reuse and recovery of plastic packaging. Our hypothesis, based on pilot data, is that this platform can deliver profitable reuse models for all three ke ...
SBIR Phase I 2023 Environmental Protection Agency