You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Sorbent Traps for Continuous Measurement of Metal HAP Emissions- Phase II

    SBC: OHIO LUMEX CO INC            Topic: 2D

    During this Phase II SBIR research project, Ohio Lumex will complete development of a sorbent trap method for continuous emissions monitoring of metal hazardous air pollutant (HAP) emissions. If method sensitivity is sufficient and the method is approved by EPA, it may also be used as an alternative to Method 29 for short-duration testing. Metal HAP emissions from stationary sources are currently ...

    SBIR Phase II 2023 Environmental Protection Agency
  2. Optimized Hydrokinetic Systems

    SBC: OCEAN RENEWABLE POWER CO INC            Topic: 1

    Ocean Renewable Power Company, Inc. (ORPC) is a global leader in marine renewable energy technology and a developer of eco-conscious projects that harness the power of oceans and rivers to create clean, predictable renewable energy. Since 2004, ORPC has made significant progress towards implementing high reliability systems that demonstrate innovative high reliability systems. To achieve the low c ...

    SBIR Phase II 2021 Department of EnergyARPA-E
  3. Optimized Hydrokinetic Systems

    SBC: OCEAN RENEWABLE POWER CO INC            Topic: 1

    Ocean Renewable Power Company, Inc. (ORPC) is a global leader in marine renewable energy technology and a developer of eco-conscious projects that harness the power of oceans and rivers to create clean, predictable renewable energy. Since 2004, ORPC has made significant progress towards implementing high reliability systems that demonstrate innovative high reliability systems. To achieve the low c ...

    SBIR Phase II 2021 Department of EnergyARPA-E
  4. Concurrent Design of a Multimaterial Niobium Alloy System for Next-generation Turbine Applications

    SBC: QUESTEK INNOVATIONS LLC            Topic: 1

    QuesTek Innovations, a leader in Integrated Computational Materials Engineering (ICME), will lead a strong team of experts in computational materials design, additive manufacturing, coating technology, and turbine design/manufacturing to design and develop a comprehensive solution for a next-generation turbine blade alloy and coating system capable of sustained operation at 1300°C. Concurrent des ...

    SBIR Phase II 2021 Department of EnergyARPA-E
  5. Power Transmission Cable for Electric Aircraft using Bio LNG for Cooling and Thermal Management

    SBC: HYPER TECH RESEARCH INC            Topic: Q

    The key problem for electric power distribution cables for double-aisle passenger aircraft is the weight of Cu or Al cables which is too high to be practical, even when the voltage is increased to kilo-volts to reduce the amperage. To carry the same power, the reduced amperage and increased voltage helps to reduce the amount of ohmic waste heat. Thus, for room temperature cables, the two issues ar ...

    SBIR Phase II 2021 Department of EnergyARPA-E
  6. Electrochemical Extraction and Remediation of PFAS in Soils

    SBC: Faraday Technology, Inc.            Topic: 19NCERP2

    Recent research has demonstrated that per- and polyfluorinated alkyl species (PFAS) are highly refractory and bio-accumulative when released to the environment, and have the potential to cause numerous adverse health effects. Development of novel approaches for extraction and destruction of PFAS in soil plumes would greatly facilitate efforts to remediate these contaminated sites and alleviate the ...

    SBIR Phase II 2020 Environmental Protection Agency
  7. Electrochemical Pretreatment of PFAS-Contaminated Aqueous Effluents

    SBC: Faraday Technology, Inc.            Topic: 19NCERP2

    Recent research has demonstrated that per- and polyfluorinated alkyl species (PFAS) are highly refractory and bio-accumulative when released to the environment, and have the potential to cause numerous adverse health effects. Development of novel approaches for in situ degradation of PFAS in industrial wastewater and landfill leachate streams would greatly facilitate efforts to prevent discharge o ...

    SBIR Phase II 2020 Environmental Protection Agency
  8. Cryo Thermal Management of High Power Density Motors and Drives

    SBC: HYPER TECH RESEARCH INC            Topic: 1

    We are solving the need to exceed 12kW/kg power density at takeoff for the motor, drive and thermal management system (TMS) for aircraft propulsion systems, In order to reach the overall systems targets called for in this solicitation, our program goal is to design and demonstrate an electric propulsion motor, drive, and TMS with a takeoff power of 17-20 kW/kg for a 2MW motor that can be scaled to ...

    SBIR Phase II 2020 Department of EnergyARPA-E
  9. Cryo Thermal Management of High Power Density Motors and Drives

    SBC: HYPER TECH RESEARCH INC            Topic: 1

    We are solving the need to exceed 12kW/kg power density at takeoff for the motor, drive and thermal management system (TMS) for aircraft propulsion systems, In order to reach the overall systems targets called for in this solicitation, our program goal is to design and demonstrate an electric propulsion motor, drive, and TMS with a takeoff power of 17-20 kW/kg for a 2MW motor that can be scaled to ...

    SBIR Phase II 2020 Department of EnergyARPA-E
  10. Decontamination of Category A Viruses on Porous Surfaces and Sensitive Equipment

    SBC: MATERIALS ENGINEERING AND TECHNICAL SUPPORT SERVICES CORP.            Topic: 18NCERP2

    In the Phase II project, METSS will continue the development of a safe, robust, rapid, and effective chlorine dioxide (ClO2) gas dispersion system to be used for on-site room decontamination in hospital and non-hospital settings. The heart of the decontamination system is a proprietary ClO2 generating micro-reactor technology that is used to quickly and safely generate ClO2 on-site. This technolog ...

    SBIR Phase II 2019 Environmental Protection Agency
US Flag An Official Website of the United States Government