You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Innovative improvements to High-Frequency Simulation Methods for Installed Antenna Performance

    SBC: DELCROSS TECHNOLOGIES, LLC            Topic: N103197

    Delcross proposes to systematically validate the Savant and Savant-Hybrid ray tracing solvers for a wide variety of installed antenna configurations, including far-field patterns, near-field distributions, and antenna-to-antenna coupling. Reference benchmarks will be developed from full-wave solvers, measurements, and analytic solutions. When shortcomings in existing methods/algorithms are identif ...

    SBIR Phase II 2011 Department of DefenseNavy
  2. Insert ear-probe assembly for high-quality otoacoustic-emission (OAE) measurements in adults

    SBC: Mimosa Acoustics Inc.            Topic: N10AT032

    OAE has proved to be an important measurement for hearing conservation programs. OAEs are sounds made by healthy inner ears in response to acoustic stimulation and are measured in the ear canal with a miniature microphone. One impediment to OAE testing on a large scale, such as in military hearing conservation programs, is the lack of a high-quality, reliable ear-probes which house the miniature m ...

    STTR Phase II 2011 Department of DefenseNavy
  3. Prognostic Sensor Microsystem

    SBC: EVIGIA SYSTEMS LLC            Topic: N092100

    The proposed SBIR Phase II project is to develop miniature light-weight high-functionality multi-sensor systems that meet the requirements for prognostics and health management of military equipment, and their life cycle management and condition-based maintenance. The systems integrate temperature, shock/vibration, and strain sensors with low-power CMOS circuit for sensor data management, data pro ...

    SBIR Phase II 2011 Department of DefenseNavy
  4. Radio Frequency (RF) System Performance and Electromagnetic Interference (EMI) in Dynamic Environments

    SBC: DELCROSS TECHNOLOGIES, LLC            Topic: N103202

    For manned and unmanned vehicles in current military operating environments, many adversary and civilian platforms exist that can be considered non-traditional, unconventional, or otherwise unaccounted for in the design of these vehicles. These unconventional and nontraditional aircraft, ship, and boat targets pose unique challenges to radar system designers, analysts, and operators. To aid in the ...

    SBIR Phase II 2011 Department of DefenseNavy
  5. Development of Electronic Controlled Fuel Injector and Pump Suitable for 5-20 Horsepower Diesel Cycle Engines

    SBC: KINETIC BEI LLC            Topic: N10AT033

    Phase II will enable KBEI to demonstrate a complete high pressure Micro Injection System on a Navy UAV engine in a laboratory environment. While the Micro Injectors and Micro Pump have been successfully proven at lower pressures, this STTR program has facilitated research and development of a higher pressure injection system designed for use with heavy fuels. At the conclusion of the Phase II ST ...

    STTR Phase II 2011 Department of DefenseNavy
  6. Value-Added Use of Milled Mixed-Color Waste Glass As a Supplementary Cementitious Material in Environmentally Friendly and Energy-Efficient Concrete Building Construction

    SBC: Technova Corporation            Topic: N/A

    Production of cement (the binder in concrete) is a highly polluting and energy-intensive process, accounting for about 6% of global, anthropogenic C02 emissions and close to 2% of worldwide primary energy use. This project focuses on partial (~20%) replacement of cement in concrete with milled (mixed-color) waste glass to improve the moisture barrier qualities, durability, dimensional stability an ...

    SBIR Phase II 2011 Environmental Protection Agency
  7. Electron-Beam Additive Manufacturing Process Control for Titanium Alloys

    SBC: SCIAKY INC            Topic: AF091C002

    The proposed scope of work is intended to comprise efforts to implement a production capable Electron Beam Direct Manufacturing (EBDM)system intended to produce parts with sufficient quality and affordability to meet Air Force program requirements. The scope deals not only with the EBDM process specifically but the entire supply chain which is involved with delivering finished titanium aerospace s ...

    SBIR Phase II 2011 Department of DefenseAir Force
  8. Instrumented Projectiles for Measuring Impact Forces to Characterize Ballistic Behavior of Fabrics and Composites

    SBC: LIUMAN TECHNOLOGIES            Topic: A11011

    In order to simulate the high velocity involved in ballistic impacts, at least up to some extent, laboratory used gas guns have been developed for material and structure testing. However, if the projectiles of the guns are not instrumented, they cannot provide information concerning impact mechanisms and damage processes during impacts. In an effort to improve their measuring capability, accelerom ...

    SBIR Phase I 2011 Department of DefenseArmy
  9. Loc's Maximum Torque Quick Disconnect (MaxTorQD) Bradley Final Drive

    SBC: LOC PERFORMANCE PRODUCTS, INC.            Topic: A11052

    Heavy add-on-armor installed on the Bradley Fighting Vehicle has degraded the vehicle"s mobility performance. Vehicle acceleration has declined to 80% of its original capability. To cost effectively modernize the mobility system, the final drive torque capacity must be significantly increased to maintain the current package space. Loc Performance Products, Inc., the Army"s provider of robust, ...

    SBIR Phase I 2011 Department of DefenseArmy
  10. Power Control Solution for Electrical System Improvements

    SBC: GLOBAL EMBEDDED TECHNOLOGIES, INC            Topic: A11062

    The U.S. Army is seeking ways to improve mission capability of small Autonomous Unmanned Ground Systems (AUGS) power systems. The challenges with AUGS stem from proprietary nature of information and control of vehicle platforms. The proprietary information is important for robot manufacturers because of investments that are made to develop technology advantages over competition in their base rob ...

    SBIR Phase I 2011 Department of DefenseArmy
US Flag An Official Website of the United States Government