You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Wireless Compatible Digital Train Line (WiDTL) for Passenger Type Vehicles in a Train Consist

    SBC: Sharma & Associates, Inc.            Topic: 151FR1

    This project seeks to define the performance requirements for a wireless Digital Train Line (WiDTL) through definition of functionality and performance expected, and translating these into network equipment specifications and architecture that wireless network equipment manufacturers can build towards. The effort will include an in-depth review of wireless technology as it applies to sensitive and ...

    SBIR Phase I 2015 Department of Transportation
  2. Next Generation Freight Truck for Autorack Cars

    SBC: Sharma & Associates, Inc.            Topic: 151FR3

    Autorack cars transport one of the most valuable commodities – fully assembled Automobiles. Due to the longer and higher profile of an Autorack and the fact that heavy automobiles are loaded on to high deck levels, freight trucks with improved track-to-vehicle dynamics as well as higher speed capabilities are desired in anticipation of higher speed passenger service and shared corridors. Unique ...

    SBIR Phase I 2015 Department of Transportation
  3. Low Cost, Efficient Microchannel Plasma Ozone System for Point of Use Water Treatment

    SBC: EP Purification, Inc.            Topic: A

    A team at EP Purification has performed research for the development and commercialization of low-cost microchannel plasma reactor modules capable of efficiently producing ozone for water treatment and other environmental applications in a slim form factor and size. The conservation of water resources for human consumption is a growing national priority. Ozone is a unique purification agent as it ...

    SBIR Phase II 2014 Environmental Protection Agency
  4. Electronically Controlled Pneumatic Brake System Emulator Development

    SBC: Sharma & Associates, Inc.            Topic: 121FR2

    Migration of the vehicle fleet from the current, pneumatic-only, automatic air brake (AAB) system to ECP presents a significant challenge due to the systems’ inherent operational incompatibility. This project will investigate the feasibility of devices that can help to ease this transition by allowing ECP equipped cars to operate in a conventionally braked train, as well as devices to permit con ...

    SBIR Phase I 2012 Department of Transportation
  5. Preconcentration Technoloogy for Infrared Analysis of Organophosphates in Water

    SBC: Orono Spectral Solutions Inc.            Topic: I

    Organophosphates cannot currently be analyzed in the field using existing technologies, due to insufficient sensitivity of currently fielded instruments. This inability reduces the number of analyses that a government agency can perform on a water supply to ensure its safety to humans and the environment. The objective of this Phase I effort is to design a novel strategy that preconcentrates org ...

    SBIR Phase I 2012 Environmental Protection Agency
  6. A 10 Kilowatt, Rankine Cycle Agricultural Waste to Energy Conversion Module Utilizing Ultra Micro Turbo-Alternators

    SBC: Fluidic microControls, Inc.            Topic: H

    Current anaerobic digester systems are designed for capturing energy from waste from large heads of farm animals. GHD, Inc., a leading manufacturer of anaerobic digesters, has stated that a minimum dairy heard size for economical implementation of a biogas system as 800 cows. These require turbine or diesel generator sets of 100 Kilowatt size and larger, a limiting factor in economically scaling ...

    SBIR Phase I 2012 Environmental Protection Agency
US Flag An Official Website of the United States Government