You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Water Purification using TiO2 and Novel Activation Method

    SBC: Imaging Systems Technology, Inc.            Topic: A

    Under this Phase II SBIR, Imaging Systems Technology (IST) will optimize and scale up its UV Plasma- shells with Titanium (IV) Dioxide (TiO2) system to produce a low cost, rugged, lightweight, and highly efficient and versatile water purification system. Plasma-shells are tiny hollow gas encapsulating devices ranging in size from 400 microns to 8.00 mm. Under the EPA Phase I SBIR, IST has successf ...

    SBIR Phase II 2014 Environmental Protection Agency
  2. Low Cost, Efficient Microchannel Plasma Ozone System for Point of Use Water Treatment

    SBC: EP Purification, Inc.            Topic: A

    A team at EP Purification has performed research for the development and commercialization of low-cost microchannel plasma reactor modules capable of efficiently producing ozone for water treatment and other environmental applications in a slim form factor and size. The conservation of water resources for human consumption is a growing national priority. Ozone is a unique purification agent as it ...

    SBIR Phase II 2014 Environmental Protection Agency
  3. Development of Zinc Coatings on Steel by Cermaclad(TM) to Replace Pickling Lines

    SBC: MesoCoat            Topic: B

    Every year, a significant amount of money is lost due to atmospheric attack of steel parts. A convenient and effective way for corrosion protection is coating the unalloyed steel with a thin layer of zinc (Zn) metal by galvanizing. Pickling is an essential step of this process to ensure a high-quality surface of steel for further processing. In this process, acid is used to remove scale from the s ...

    SBIR Phase I 2014 Environmental Protection Agency
  4. Phosphorus Removal and Recovery From Municipal Wastewater Using Nano-Enhanced Media

    SBC: MetaMateria Technologies, LLC            Topic: A

    This Small Business Innovation Research (SBIR) Phase I project will develop approaches for the capture and recovery of phosphorus in municipal reclamation facilities processing under I MGD using an innovative nanostructured sorption media. The captured phosphorous will be recovered from the media by a simple treatment and will be converted to a useful material.Eutrophication is a process in which ...

    SBIR Phase I 2014 Environmental Protection Agency
  5. Preconcentration Technoloogy for Infrared Analysis of Organophosphates in Water

    SBC: Orono Spectral Solutions Inc.            Topic: I

    Organophosphates cannot currently be analyzed in the field using existing technologies, due to insufficient sensitivity of currently fielded instruments. This inability reduces the number of analyses that a government agency can perform on a water supply to ensure its safety to humans and the environment. The objective of this Phase I effort is to design a novel strategy that preconcentrates org ...

    SBIR Phase I 2012 Environmental Protection Agency
  6. Real-Time In-Line Sensor for Watewater Monitoring

    SBC: UES INC            Topic: B

    A consistent clean water supply is crucial to a stable and healthy population. Contamination of water resources with biological agents or toxins is concerning as clean water becomes a limited resource in society. The National Pollutant Discharge elimination systems (NPDES) permitting program requires permits for industrial and municipal water treatment facilities that discharge directly to surfa ...

    SBIR Phase I 2012 Environmental Protection Agency
  7. A 10 Kilowatt, Rankine Cycle Agricultural Waste to Energy Conversion Module Utilizing Ultra Micro Turbo-Alternators

    SBC: Fluidic microControls, Inc.            Topic: H

    Current anaerobic digester systems are designed for capturing energy from waste from large heads of farm animals. GHD, Inc., a leading manufacturer of anaerobic digesters, has stated that a minimum dairy heard size for economical implementation of a biogas system as 800 cows. These require turbine or diesel generator sets of 100 Kilowatt size and larger, a limiting factor in economically scaling ...

    SBIR Phase I 2012 Environmental Protection Agency
  8. Microelectrode Array to Enable Robust Water Monitoring for Multiple Contaminants at Sub-Nanomolar Concentrations

    SBC: Faraday Technology, Inc.            Topic: A

    The proposed SBIR project addresses the need for robust, compact, sensitive, low cost sensors for measurement of contaminants in water. The proposed innovation is the development and validation of an ion-selective microelectrode array, capable of simultaneous detection of multiple species in aqueous environments, with detection limits similar to or exceeding those available using standard laborat ...

    SBIR Phase I 2012 Environmental Protection Agency
  9. Functional Chrome Coatings on Hard to Access, Internal Surfaces of Industrial Parts from an Environmentally Benign Trivalent Chromium Bath

    SBC: Faraday Technology, Inc.            Topic: B

    Faraday Technology Inc., with the guidance of The Boeing Company and Advanced Tooling Corp, proposes a drop-in replacement chrome plating process that can coat complex, hard to access surfaces such as the interior of landing gear, using an environmentally benign trivalent chromium bath. The proposed manufacturing process meets the stated EPA needs b improving existing processes while utilizing a n ...

    SBIR Phase II 2012 Environmental Protection Agency
  10. RECYCLING OF DUST FROM ELECTRIC ARC FURNACES

    SBC: Pei Associates Inc            Topic: N/A

    THE MAJOR SHORTCOMINGS OF THE VARIOUS PROCESSES SUGGESTED BY RECYCLING METALLURGICAL DUST HAVE BEEN THE HIGH CAPITAL COST OF THE EQUIPMENT AND THE NEED FOR LARGE QUANTITIES OF DUST FOR THE PROCESSES TO BE ECONOMICAL. ELECTRIC ARC FURNACE DUST IS NOT AMENABLE TO THESE PROCESSES BECAUSE IT IS GENERATED IN SMALL QUANTITIES AND A LARGE NUMBER OF LOCATIONS, DISTANT FROM INDUSTRIAL CENTERS WHERE REGIONA ...

    SBIR Phase II 1984 Environmental Protection Agency
US Flag An Official Website of the United States Government