You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Levaraging AxM Software Technology to Empower Material Reuse and Embodied Carbon Reporting in the Built Environment

    SBC: RHEAPLY INC            Topic: 4D

    As the single largest consumer of materials and energy use worldwide, the construction sector remains a prime target for materials reuse reform. (Krausmann et al., 2009; De Ia Rue du Can & Price, 2008). Construction and ongoing operation of the built environment extracts a significant amount of resources -- and on an ongoing basis. According to the U.S. Green Building Council (USGBC), buildings ac ...

    SBIR Phase I 2022 Environmental Protection Agency
  2. Electric Hybrid Air Cushion Vehicle

    SBC: STEPHEN T NEWTON            Topic: DHS211005

    Technical AbstractThis application proposes a Green yet high-performing hybrid electric Air Cushion Vehicle, which is a combination of quad-copter and hovercraft. The new capability necessary to deliver this design and subject of Phase I research is a sectioned plenum box design, a skirt design that acts as an airfoil in flight, and lightweight lift fans with dual motor multi-engine reliability.Th ...

    SBIR Phase I 2021 Department of Homeland Security
  3. Low Size, Weight, and Power (SWAP) In-building Coverage Analysis System (ICAS) Solution

    SBC: Epiq Design Solutions, Inc.            Topic: DHS201005

    The purpose of this SBIR project is to solve the critical problem of ensuring emergency communications network coverage for the first responder in a host of building types and locations. The advent of FirstNet and other broadband networks as equally critical communications tools increases the complexity of this problem.While localities' code policies are accelerating the move toward providing for ...

    SBIR Phase II 2021 Department of Homeland Security
  4. Turnkey PFAS Removal to Destruction Treatment Train

    SBC: CYCLOPURE INC            Topic: 20OSAPE3A

    Per- and polyfluoroalkyl substances (PFAS) have emerged as a pervasive and persistent threat to drinking water throughout the world. Called ‘forever chemicals” because their high stability leads PFAS to build up in the environment. PFAS accumulates in the blood from exposures and is associated with various cancers and other illnesses. There is an urgent need for a technology that can both remo ...

    SBIR Phase I 2021 Environmental Protection Agency
  5. Low Size, Weight, and Power (SWAP) In-building Coverage Analysis System (ICAS) Solution

    SBC: Epiq Design Solutions, Inc.            Topic: DHS201005

    The purpose of this SBIR project is to solve this critical problem of ensuring in-building emergency communications network coverage for the first. The challenge of in-building public safety communications in emergencies or disasters is well documented, and the advent of FirstNet as an equally critical communications network increases the complexity of this problem.Epiq Solutions intends to develo ...

    SBIR Phase I 2020 Department of Homeland Security
  6. Forensiq: Flexible RF Interference Detection in the Palm of your Hand

    SBC: Epiq Design Solutions, Inc.            Topic: HSB0181003

    With the ever-increasing availability of commercial jamming equipment, the risk to public safety communications has never been higher.While public safety has operational backup plans for communications, jamming has proven problematic to detect in the field.The purpose of this project is to solve this critical problem of detection and characterization simply and seamlessly, for the first responder, ...

    SBIR Phase I 2018 Department of Homeland Security
  7. A Universal Interworking Function (UIWF) for LMR and LTE Networks

    SBC: Murus Cybersecurity LLC            Topic: HSB0181005

    Interoperability has been a communications objective for for first responders in the United Stats for many years. The need for digital interoperability brought about the establishment of the Telecommunications Industry Association (TIA) Association of Public Safety Communications Officials (APCO) Project 25 standard in 1989.Today, P25 standards are very mature, and include an Inter-RF Subsystem In ...

    SBIR Phase I 2018 Department of Homeland Security
  8. Isocyanate-Free Polyurethane Resins for One-Component, Ambient-Cure Coatings

    SBC: RENUVIX LLC            Topic: 15NCER04

    The Phase I project showed that novel urethane-functional (NUF) resins could be produced that were free of isocyanates and very useful for one-component, ambient-cured (OCAC) coatings. Resins for OCAC coatings, which are expected to be valued at $5.7 billion by 2019, are used to produce a variety of coatings including oil-based paints, wood stains, varnishes, and aerosol paints._x000D_ Phase I re ...

    SBIR Phase II 2017 Environmental Protection Agency
  9. Isocyanate-Free Polyurethane Resins for One-Component, Ambient-Cure Coatings

    SBC: RENUVIX LLC            Topic: 15NCER04

    Due to their exceptional properties, polyurethane coatings are used extensively in our society.Unfortunately, the socyanate-functional components used in the curing of polyurethanes are generally toxic. Thus, there is a need for polyurethane resins that can be cured without the use of isocyanate-functional components. In addition to enabling the production of polyurethane coatings that are free ...

    SBIR Phase I 2016 Environmental Protection Agency
  10. DNA Profiles from Single FIngerprints

    SBC: Independent Forensics of Illinois, LLC            Topic: HSB0151001

    The goal of this project is to develop a validated, commercial quality reagent kit for the reliable collection of fingerprints (i.e., latent ridge impressions) that would subsequently be used for both comparison and DNA profiling. The kit would provide all required materials, reagents, solutions and would include a detailed protocol describing the steps to (i) identify latent ridge impressions (al ...

    SBIR Phase I 2015 Department of Homeland Security
US Flag An Official Website of the United States Government