You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Additive Manufacturing of Structural Insulators

    SBC: ADVANCED CERAMICS MANUFACTURING, LLC            Topic: MDA22T012

    There is a need for a lightweight, high-performance, insulation to protect the internal systems in hypersonic vehicles. A passive thermal protection system (TPS) design would be simple and reliable. As designs evolve, there is a need for TPS insulation materials that can be additively manufactured. Our Phase I approach will additively manufacture pre-ceramic scaffolds that are used to create low d ...

    STTR Phase I 2023 Department of DefenseMissile Defense Agency
  2. Metasurface-coupled superlattices for LWIR imaging

    SBC: SIVANANTHAN LABORATORIES, INC.            Topic: MDA21T004

    Sivananthan Laboratories (SL) with the University of Iowa as the STTR partner, proposes to develop metasurface-coupled type II superlattice (T2SL) LWIR detectors that are predicted to outperform HgCdTe detectors. We developed in Phase I fundamental understanding of metasurface-coupled T2SLs, likely performance, and issues related to scaling up device structure to form arrays for LWIR imaging. In P ...

    STTR Phase II 2023 Department of DefenseMissile Defense Agency
  3. High Entropy TPS Materials

    SBC: ADVANCED CERAMICS MANUFACTURING, LLC            Topic: DLA23A003

    Hypersonic aerial vehicles have tailored aerodynamic shapes with sharp leading edges to maximize performance. When a vehicle is travelling through the atmosphere at hypersonic speeds of Mach 5 or higher, it encounters intense friction with the surrounding air. The nose cone and the leading edges of the flight vehicle will experience extremely high temperatures from 3000°F to 5000°F. Ultra-High T ...

    STTR Phase I 2023 Department of DefenseDefense Logistics Agency
  4. Accelerated Processing with Geometry-Specific Pyrolysis Heating Profiles for Production of C-C Hot Structures

    SBC: Carbon Carbon Advanced Technologies, Inc.            Topic: DLA231D07

    The highest-risk processing step in manufacturing C-CAT’s ACC material is the initial carbonization cycle, during which a C/Ph composite preform is carbonized to produce a low-density C/C part to be subsequently densified using a Polymer Infiltration and Pyrolysis (PIP) process. Though the carbonization steps of the PIP densification cycles also present a risk, it is during the initial cycle tha ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  5. ALLVAR Alloys for Athermalizing SiC Telescopes with Reduced SWAP-C

    SBC: Thermal Expansion Solutions, Inc.            Topic: MDA21001

    The Ultimate Goal of these research efforts is to develop ALLVAR Alloy athermalizing strut components that enable size, weight, cost, lead time, and performance enhancements of SiC mirrored optical seekers that must withstand extreme exo-atmosphere, endo-atmosphere, and mechanical loading environments. ALLVAR Alloys offer a brand-new strong and ductile support structure solution that can offer low ...

    SBIR Phase II 2023 Department of DefenseMissile Defense Agency
  6. Non-Destructive, Cryogenic 6-inch Wafer Level Screening and Measurement System of Infrared Detector materials

    SBC: EPIR, INC.            Topic: MDA22D003

    Sb-based III-V semiconductor Type-II superlattice (T2SL) materials with band structure-engineered device architectures are groundbreaking for infrared detectors and focal plane arrays (FPAs). T2SL FPAs have become very attractive candidates for various MDA/DOD sensor platforms including air, space, ships, and missiles. T2SL wafers, the starting materials of FPAs, are grown on large substrates usin ...

    SBIR Phase II 2023 Department of DefenseMissile Defense Agency
  7. Paratemporal Simulation with Uncertainty Quantification

    SBC: RTSYNC CORP            Topic: MDA22T001

    We propose to develop Para-DEVS, an extension of the existing modeling and simulation (M&S) environment overcome two major hurdles that must be overcome to implement paratemporal simulation techniques for application to execution of large stochastic models. We propose to develop techniques to achieve scalability, the ability to overcome the combinatorial explosion of branching arising from multipl ...

    STTR Phase I 2023 Department of DefenseMissile Defense Agency
  8. Qualification of Aircraft Accelerometer NSN 6610-00-151-6684 & Torque Motor NSN 6105-01-326-8652

    SBC: Kaney Aerospace, Inc.            Topic: DLA213001

    The objective of this Phase II SBIR proposal is to continue the design and qualification efforts for a single-axis accelerometer (NSN 6610-00-151-6684) and perform detailed design and qualification activities for a Torque Motor (NSN 6105-01-326-8652). During Phase II, Kaney will utilize in-house manufacturing and analysis capabilities to produce drawings and manufacturing/qualification plans for t ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  9. Source Approval Request (SAR) Package and Development Plan for Battery Connector Assembly NSN 6150-01-629-3728

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 6150-01-629-3728, a Battery Connector Assembly. This battery connector assembly is out of stock at two different suppliers (but available at a third supplier, please see below in Figure 6-1), and the NSN pertains to F-15C and F-15D based platforms including variants currently flown by some ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  10. Source Approval Request (SAR) Package and Development Plan for Radio Cable Assembly NSN 5995-11-959-918

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 5995-01-195-9918, a Radio Cable Assembly for the B-1 platform. During Phase I, Kaney will utilize our in-house manufacturing and analysis capabilities to develop Kaney drawings and a manufacturing/qualification plan for this part. Kaney has extensive domain knowledge and capabilities rela ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
US Flag An Official Website of the United States Government