You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Reducing produce waste via novel biopreservative ingredients

    SBC: Imvela Corp.            Topic: 4A

    According to the USDA, 25% of the US fresh fruit supply at the consumer level is wasted, which equates to 9.5 billion pounds. To address consumer food waste, Imvela Corp. proposes to develop a novel, natural ingredient that reduces microbial spoilage and extends shelf life, when applied to berries after they are harvested. Our approach is innovative because we collect experimental data from a larg ...

    SBIR Phase I 2023 Environmental Protection Agency
  2. Co-production of Indigoid Dyes and Bioplastics Using Byproducts of Dairy Processing

    SBC: TRANSFOAM LLC            Topic: 5A

    The impact of accelerating human industrial activities on the environment and climate are becoming increasingly clear. Petroleum-derived colorants used in consumer goods are of particular concern due to their toxicity profile, persistence, and tendency to leach into the environment. As more companies make the switch to bio-based/biodegradable plastics, greater access to bio-based dyes will be need ...

    SBIR Phase I 2023 Environmental Protection Agency
  3. Prototyping a Process to Reuse Wasted Glass in High Performance Low Carbon Concrete

    SBC: KLAW INDUSTRIES LLC            Topic: 4D

    How Glass SCMs Solve the Market Need. The process of producing cement has remained unchanged since the industrial revolution. Concrete producers need a new high performing cement alternative to lower their concrete products' cost and embodied carbon. Otherwise, we will be building our future communities using a process with the environmental and financial costs of 1820s technology. This project wi ...

    SBIR Phase II 2023 Environmental Protection Agency
  4. Supply Chain Logistics of Manufactured TPS Materials

    SBC: NANOSONIC INC.            Topic: DLA23A003

    Through this DLA STTR program, NanoSonic and Penn State will work with a major US manufacturer of missile systems and hypersonic vehicles. Together we will demonstrate automated filament winding and resin transfer molding manufacturing processes to produce high temperature thermal protection system (TPS) materials and evaluate material properties to develop production statistics and quality contro ...

    STTR Phase I 2023 Department of DefenseDefense Logistics Agency
  5. High Entropy TPS Materials

    SBC: ADVANCED CERAMICS MANUFACTURING, LLC            Topic: DLA23A003

    Hypersonic aerial vehicles have tailored aerodynamic shapes with sharp leading edges to maximize performance. When a vehicle is travelling through the atmosphere at hypersonic speeds of Mach 5 or higher, it encounters intense friction with the surrounding air. The nose cone and the leading edges of the flight vehicle will experience extremely high temperatures from 3000°F to 5000°F. Ultra-High T ...

    STTR Phase I 2023 Department of DefenseDefense Logistics Agency
  6. BMS Cybersecurity HITL Verification System

    SBC: TURNAROUND FACTOR, INC.            Topic: DLA231D06

    Lithium-ion battery systems are proliferating across military and commercial markets. Due to their high energy and compelling power densities, lithium based batteries are an ideal match for long and demanding missions and are being integrated into more critical systems every day. ​​​​​​​As more and more batteries are introduced to mission and safety critical systems it has become all ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  7. Manufacture of NSN 2840-0038-64656 Thermocouple Cover for Pratt & Whitney TF33

    SBC: TURNAROUND FACTOR, INC.            Topic: DLA232001

    Diminishing manufacturing source problems continue to cause shortages for critical DoD weapons systems, negatively impacting readiness. Subcomponents become obsolete and manufacturers stop supporting parts, and it becomes difficult for the government to acquire approved parts at a fair or reasonable price — or at any price.This scenario is the case for NSN 2840-0038-64656, the thermocouple cover ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  8. Qualification of Aircraft Accelerometer NSN 6610-00-151-6684 & Torque Motor NSN 6105-01-326-8652

    SBC: Kaney Aerospace, Inc.            Topic: DLA213001

    The objective of this Phase II SBIR proposal is to continue the design and qualification efforts for a single-axis accelerometer (NSN 6610-00-151-6684) and perform detailed design and qualification activities for a Torque Motor (NSN 6105-01-326-8652). During Phase II, Kaney will utilize in-house manufacturing and analysis capabilities to produce drawings and manufacturing/qualification plans for t ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  9. Source Approval Request (SAR) Package and Development Plan for Battery Connector Assembly NSN 6150-01-629-3728

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 6150-01-629-3728, a Battery Connector Assembly. This battery connector assembly is out of stock at two different suppliers (but available at a third supplier, please see below in Figure 6-1), and the NSN pertains to F-15C and F-15D based platforms including variants currently flown by some ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  10. Source Approval Request (SAR) Package and Development Plan for Radio Cable Assembly NSN 5995-11-959-918

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 5995-01-195-9918, a Radio Cable Assembly for the B-1 platform. During Phase I, Kaney will utilize our in-house manufacturing and analysis capabilities to develop Kaney drawings and a manufacturing/qualification plan for this part. Kaney has extensive domain knowledge and capabilities rela ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
US Flag An Official Website of the United States Government