You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Electrochemical Mineralization of PFAS in lndustrial Wastewater

    SBC: OXBYEL TECHNOLOGIES INC.            Topic: 18NCER1C

    The EPA has established health advisory levels at 70 parts per trillion (ppt) for combined PFAS concentration. Water resources are susceptible to contamination by PFAS release from industry and landfill sites. Consequently, there is a need for on-site pretreatment technologies for PFASs in industrial wastewater. Electrochemical treatment has been shown to be effective for the mineralization of PFA ...

    SBIR Phase I 2019 Environmental Protection Agency
  2. Trenchless Water Main Point Repairs with SuperLaminate

    SBC: Quakewrap, Inc.            Topic: 18NCER1E

    Aging infrastructure is a major challenge faced by the water utilities in the USA and across the globe, and with an overall rating of D by the ASCE, water distribution systems are no exception. Approximately 240,000 water main breaks occur in US systems every year with a cost of at least $3.6 billion. As such, innovative, economical, and sustainable solutions are needed in renewing the water trans ...

    SBIR Phase I 2019 Environmental Protection Agency
  3. Reverse Engineering- Light, Dome: NIIN 015639517

    SBC: Breault Research Organization, Inc.            Topic: DLA171002

    The trend over the last several years is fewer businesses supplying manufactured products. Thus, by supply and demand, the cost of military hardware has increased with less competition. Furthermore, amortized cost of the qualifying a new product becomes cost prohibited resulting in non-competitive bids compared to historical averages. DLAs Replenishment Parts Purchase or Borrow program supports re ...

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
  4. Tamper Resistant/Anti-Counterfeit Package Labeling

    SBC: BURCHELL PROFESSIONAL GROUP, INC            Topic: DLA163003

    Tamper Resistant/Anti-Counterfeit Package Labeling.A new innovative best practice tamper resistant/Anti-counterfeiting package labeling technology was the focal of this research.

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
  5. NANOPOROUS FILTERS FOR SIMULTANEOUS REMOVAL OF VOC AND PARTICULATES FROM AIR

    SBC: Nanomaterials Research LLC            Topic: N/A

    Indoor air in work places, automobiles, recreation settings and homes is one ofthe major sources of direct human exposure to particulates, chemicals and diseasecausing bacteria. Recent estimates suggest that more than 98% of theseparticulate pollutants are very small (less than 1 ) and, therefore, cannot beeffectively filtered by exiting filters. These particulates are also know to becarriers o ...

    SBIR Phase I 1995 Environmental Protection Agency
US Flag An Official Website of the United States Government