You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Reverse Engineering- Light, Dome: NIIN 015639517

    SBC: Breault Research Organization, Inc.            Topic: DLA171002

    The trend over the last several years is fewer businesses supplying manufactured products. Thus, by supply and demand, the cost of military hardware has increased with less competition. Furthermore, amortized cost of the qualifying a new product becomes cost prohibited resulting in non-competitive bids compared to historical averages. DLAs Replenishment Parts Purchase or Borrow program supports re ...

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
  2. Low Voltage Radiation Hardened Optoelectronics for Optical Interconnects

    SBC: Quanttera LLC            Topic: DTRA152001

    The Defense Threat Reduction Agency (DTRA) recognizes the need for low-power high-bandwidth radiation-hard optical interconnects to process more data more quickly and to replace electronic data.Our companys core development in optical communications with semiconductor materials is a unique fit for DTRAs low-power consumption high-bandwidth radiation-hard intra-chip communication components for sat ...

    SBIR Phase II 2018 Department of DefenseDefense Threat Reduction Agency
  3. Rotorcraft Fuel Bladder Weight and Total Ownership Cost Reduction

    SBC: Response Technologies, LLC            Topic: DLA182001

    Response Technologies will attempt to qualify to MIL-DTL-27422Fs phase I performance testing criteria for thefuel cell test cubes[Class BSemi rigid or self-supporting fuel construction, Type ISelf-sealing, and Protection Level CFull self-sealing against 50 caliber and partial self-sealing against 14.5 mm] .Response Technologiesuses an additive manufacturing process that initially creates a textile ...

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
  4. Additively Manufactured Inflatable Hulls- Improved Survivability- 20% Total Ownership Cost Reduction

    SBC: Response Technologies, LLC            Topic: DLA152001

    Seam failures of flexible inflatable hulls is the primary reason for failures of military RHIBS and CRCs.These failures are a result of the current manufacturing methods being used, and which have been in place for over fifty years.Whats more, the manufacturing methods and fragmented supply chain of these hulls result in very long and unreliable lead times.These shortcomings impact the survivabili ...

    SBIR Phase II 2018 Department of DefenseDefense Logistics Agency
US Flag An Official Website of the United States Government