You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. SoldierBoost, Nutrient-Dense Soldier Food Bar Ration

    SBC: Systems & Materials Research Corporation            Topic: DLA163001

    Soldiers engaged in Sustained Operations can burn up to 6,000 kcal of energy per day, which cannot be compensated for by current rations - Meals, Ready-to-Eat and First Strike Rations only provide up to 3,750 kcal/day and 2,900 kcal/day, respectively. This energy debt is further aggravated by the fact that most soldiers "field strip" their rations, removing menu items that are undesirable, or that ...

    SBIR Phase II 2018 Department of DefenseDefense Logistics Agency
  2. A Novel, Nanostructured, Metal-organic Frameworks-Based Product Loss Prevention Technology in the Oil and Natural Gas Sector

    SBC: FRAMERGY INC            Topic: 17NCER2C

    To reach the end user, oil and gas production at the wellhead must be transmitted through the country and distributed to a wide range of customers. This logistical system requires natural gas gathering lines, processing facilities, product storage tanks and lots of other equipment. What results is air pollution caused by industry losses during these operations and the use of continuous or intermit ...

    SBIR Phase I 2018 Environmental Protection Agency
  3. Reverse Engineering- Light, Dome: NIIN 015639517

    SBC: Breault Research Organization, Inc.            Topic: DLA171002

    The trend over the last several years is fewer businesses supplying manufactured products. Thus, by supply and demand, the cost of military hardware has increased with less competition. Furthermore, amortized cost of the qualifying a new product becomes cost prohibited resulting in non-competitive bids compared to historical averages. DLAs Replenishment Parts Purchase or Borrow program supports re ...

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
US Flag An Official Website of the United States Government